Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
9,832 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
9,832 results • Latest
Mahasamund District Panchayats
Coarse Aggregate (V2) Conforming to IS 383 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6615912 Dated : 27-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Indian Army
Bharat Electronics Limited (bel)
Calibration Services - Electrical; Voltage, Current, Power (AC/DC), Resistance; NABL Labs; Lab
Power Grid Corporation Of India Limited
E-municipalities - Eservices To Citizens And Employees Of
Department Of Health And Family Welfare
Basic Education Department Uttar Pradesh
State Consumer Disputes Redressal Commission, Uttar
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor
Urban Development Department Uttar Pradesh
Urban Development Department Uttar Pradesh
Indian Army
High Foaming liquid wash detergent, Windshield and side windows cleaner, Microfiber cloth duster 12 inches, Tyre puncher kit, Brake fluid, Bosch antifreeze coolant HDPE, Air freshner perfume, Multipurpose car perfume, Rubbing compound liquid
Ntpc Limited
Food Corporation Of India (fci)
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service
Bharat Heavy Electricals Limited (bhel)
220208540000 WOOL 150Kg per Cubic meter 60MM ONE SIDE GI WIRENET, 220208480000 WOOL 100KG per Cubic meter 50MM BOTH SIDE GI WIRENET, 220208460000 WOOL 100KG per Cubic meter 60MM ONE SIDE GI WIRENET, 220208470000 WOOL 100KG per Cubic meter 40MM BOTH SIDE GI WIRENET, 220208450000 WOOL 100KG per Cubic meter 50MM ONE SIDE GI WIRENET
Indian Oil Corporation Limited
Controller General Of Defence Accounts
National Industrial Corridor Development Corporation
Nlc India Limited
Eastern Railway
Sterile Hypodermic Syringe (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6616198 Dated : 27-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Indian Oil Corporation Limited
Bharat Heavy Electricals Limited (bhel)
Sodium Hypochlorite Solution (V2) as per IS 11673 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Bid Number : GEM/2025/B/6615050 Dated : 27-08-2025 Bid Document 1/6 Payment Timelines Payments shall be made to the Seller within 90 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
E-municipalities - Eservices To Citizens And Employees Of
Fisheries Department Haryana
Entry and Mid Level Laptop - Notebook (Q2) ( PAC Only ), Multifunction Machine MFM (V2) (Q2) ( PAC Only ) (3 (3 ))
Directorate Of Panchayats
Indian Army
Manpower Outsourcing Services - Minimum wage - Skilled; ITI; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Bokaro Steel Plant
AW WF CONTROLLER, MM: AW2035, AW WF CONTROLLER, MM: AW3035
Bharat Heavy Electricals Limited (bhel)
Uttar Pradesh Power Corporation Limited (uppcl)
Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2), Computer Printer (V2) (Q2) ( ( 3 3 ))
Ministry Of Environment Forest And Climate Change
hand held gps (Q2) ( PAC Only ) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6610216 Dated : 27-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Nhpc Limited
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6597606 Dated : 27-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 121800 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Nhpc Limited
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) (3 (3 ))
Bharat Heavy Electricals Limited (bhel)
Advanced Weapons And Equipment India Limited
Central Board Of Direct Taxes (cbdt)
Indian Institute Of Technology (iit)
Central Board Of Direct Taxes (cbdt)
Entry and Mid Level Desktop Computer (Q2), High End Desktop Computer (Q2), Multifunction Machine MFM (V2) (Q2) (3 (3 ))
Bharat Heavy Electricals Limited (bhel)
Engineering Department Chandigarh
Housing And Urban Planning Department Uttar Pradesh
Rural Development Department
Height Adjustable Table (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6616065 Dated : 27-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Container Corporation Of India Limited
Multipurpose Industrial Grease (V2) Conforming to IS 7623 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6615740 Dated : 27-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 279617 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Panchayati Raj Department
Height Adjustable Table (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6616380 Dated : 27-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
University Of Lucknow
Local Self Government Department Kerala
Bharat Petroleum Corporation Ltd
TACHO METER, FILTER AS, GAGE PRESSUR, LUBE FILTER, CAT DEO CI4, AIR FILTER, INDICATOR PR
Rail Coach Factory Kapurthala
Toilet Soap as per IS 2888 (V2) (Q4) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6616408 Dated : 27-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Ministry Of Power
Ministry Of Power
Central Board Of Direct Taxes (cbdt)
Across all 9,832 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.