Loading…
Loading…
8,778 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
8,778 results • Latest
Paradip Port Authority
Rain Suit (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6816181 Dated : 23-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : FA & CAO PARADIP PORT AUTHORITY, Ministry of Ports, Shipping and Waterways (A K Sahoo)
Garden Reach Ship Builders And Engineers Limited (grse)
WORK TABLE FOR OFFICERS, WOODEN, Chair revolving with adjustable back, Chair revolving with adjustable back., Four Drawer Steel vertical file cabinet, Four Drawer Steel vertical file cabinet.
Indian Navy
High Security Fence Controller, IP 66 W Weather proof box, Main Post, Support Post, End Insulator, Tightener, Pin Insulator, Power cable, Communication cable, Pipe for laying, Monitor, DI Cable, Installation Charges
Border Security Force (bsf)
GENERAL INTELLIGENCE ENGLISH, GENERAL INTELLIGENCE BENGALI, REASONING ENGLISH, REASONING BENGALI, QUANTITATIVE APTITUDE ENGLISH, QUANTITATIVE APTITUDE BELGALI, GENERAL AWARENESS ENGLISH, GENERAL AWARENESS BENGALI, REASONING AND GENERAL INTELLIGENCE ENGLISH, REASONING AND GENERAL INTELLIGENCE BENGALI, COMPUTER KNOWLEDGE ENGLISH, COMPUTER KNOWLEDGE BENGALI, MATHEMATICAL ABILITY ENGLISH, MATHEMATICAL ABILITY BENGALI, ENGLISH LANGUAGE COMPREHENSIVE GRAMMER ENGLISH, ENGLISH LANGUAGE COMPREHENSIVE GRAMMER BENGALI, GENERAL KNOWLEDGE ENGLISH, GENERAL KNOWLEDGE BENGALI, YEAR BOOK ENGLISH, YEAR BOOK BENGALI, SOLVED QUASTION PAPER OF LAST 10 YEARS SSC GD SSC CPO CTGD ENGLISH, SOLVED QUASTION PAPER OF LAST 10 YEARS SSC GD SSC CPO CTGD BENGALI, OXFORD DICTIONARY ENGLISH Bid Number : GEM/2025/B/6815853 Dated : 23-10-2025 Bid Document 1/20
Indian Army
NICORANDIL 5 MG TAB, NIFEDIPINE RETARD 20 MG CAP TAB, NITROGLYCERIN 2.6MG TAB, NORMAL SALINE FLUID SODIUM CHLORIDE 0.9 PERCENT 500 ML, OLANZAPINE 2.5 MG TAB
Hindustan Aeronautics Limited (hal)
Spill Containment Pallets (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Primary product category Spill Containment Pallets Bid Number : GEM/2025/B/6815809 Dated : 23-10-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Post Graduate Institute Of Medical Education And Research
Head Light for Surgeon with battery, charge and cord, LED Bulb, Battery pack, Charger, Headset, CMC for first year, CMC for second year, CMC for third year, CMC for fourth year, CMC for fifth year, CMC for sixth year, CMC for seventh year, CMC for eighth year
Central Coalfields Limited
Southern Railway
Directorate Of Purchase And Stores
Bharat Heavy Electricals Limited (bhel)
Semi Automated Coagulation Analyzer (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6815651 Dated : 23-10-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 62 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Manager HEP Bhopal, Department of Heavy Industry, Bharat Heavy Electricals Limited (BHEL), Ministry of Heavy Industries 2/9 and Public Enterprises (Bharat Heavy Electricals Ltd.)
National Aluminium Company Limited, Bhubaneswar
1000072038_1_67126010800, 1000072038_2_67126010810, 1000072038_3_67126010820, 1000072038_4_82702003770, 1000072038_5_82701032120, 1000072038_6_82702003910, 1000072038_7_82701005560, 1000072038_8_67126010830, 1000072038_9_67126010840, 1000072038_10_82701008680, 1000072038_11_82702020090, 1000072038_12_82702020160, 1000072038_13_82701019040, 1000072038_14_82702021040, 1000072038_15_82701002820, 1000072038_16_82702022540, 1000072038_17_82702021590, 1000072038_18_67126010850, 1000072038_19_82701042150, 1000072038_20_82712027090, 1000072038_21_82702030260, 1000072038_22_82702030330, 1000072038_23_82702030400, 1000072038_24_82701034740, 1000072038_25_82721800050, 1000072038_26_82721800060, 1000072038_27_82721800110, 1000072038_28_82721800280, 1000072038_29_82721801090, 1000072038_30_82721800010, 1000072038_31_82721801540, 1000072038_32_82721800590, 1000072038_33_82709003140, 1000072038_34_40206706030, 1000072038_35_82721800730, 1000072038_36_82721800030, 1000072038_37_82721800800, 1000072038_38_82721800040, 1000072038_39_82721802590, 1000072038_40_21851821210, 1000072038_41_82721800810, 1000072038_42_82721800820, 1000072038_43_82721800830, 1000072038_44_82721800840, 1000072038_45_82721800850, 1000072038_46_82721800860, 1000072038_47_82721800870, 1000072038_48_82721800880
Indian Space Research Organization
Matrix Cosec Argo Face M, Installation and Commissioning of Item No 1, Matrix Cosec Path V2, Installation and Commissioning of Item No 3, Mivanta 600 LBS Single leaf, Installation and Commissioning of Item No 5, Emergency break glass with Switch, Installation and Commissioning Item No 7, Matrix Cosec Panel 200P, Installation and Commissioning of Item No 9
Ministry Of Power
Hindustan Aeronautics Limited (hal)
Supply, Installation & Commissioning of 50 LPH RO+ UV Water Purifier with 80 liters External Storage
National Institute Of Technical Teachers Training And
Bharat Petroleum Corporation Ltd
Export Inspection Council Of India (eic)
VIDAS SLMKIT, VIDAS LMO2, API 20 E
Directorate Of Purchase And Stores
Home Department Madhya Pradesh
Export Inspection Council Of India (eic)
South Central Railway
Welding Cable (V2) as per IS 9857 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6810217 Dated : 23-10-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 2263768 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 45280 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Principal Financial Advisor/SCR 3rd Floor, Rail Nilayam, South Central Railway, Secunderabad. (Principal Financial Advisor/scr) 2/9
National Fertilizers Limited (nfl)
MCB 32A 1P 415V 10kA, MCB, 2P, 63A, RAIL TYPE MCB: ALTERNATE MCB WITH DIN RAIL ADAPTOR SUITABLE FOR REPLACEMENT OF LOADSTER, BAKELITE PENDANT LAMP FOLDER BAKELITE PENDENT LAMP HOLDER SUITABLE FOR 240V AC; STANDARD MAKE: KINJA
Hindustan Aeronautics Limited (hal)
Bharat Petroleum Corporation Ltd
76.00.05.201.9 - RETURN BEND 6 SCH40 180 SR BEND 168 3OD 7 11AW A403 WP316L, 76.25.20.356.5 - RETURN BEND 16 SCH40 180 LR 406 4OD 9 53 AW A403 316H, 76.25.20.346.5 - RETURN BEND 12 SCH STD 180 LR 323 8 OD 9 53 AW A403 316H, 76.25.20.332.5 - RETURN BEND 6 SCH STD 180 SR 168 3OD 7 11AW A403 316H, 76.25.20.331.5 - RETURN BEND 6 SCH STD 180 LR 168 3OD 7 11AW A403 316H, 76.00.05.204.9 - RETURN BEND 8 SCH STD 90 deg SR bend A403 316H, 76.00.05.205.9 - RETURN BEND 8 SCH STD 180 deg SR bend A403 316H
Post Graduate Institute Of Medical Education And Research
CMC services for first year for Avaya IP-PBX Telephone exchange System, CMC services for second year for Avaya IP-PBX Telephone exchange System, CMC services for third year for Avaya IP-PBX Telephone exchange System, CMC services for fourth year for Avaya IP-PBX Telephone exchange System, CMC services for fifth year for Avaya IP- PBX Telephone exchange System
Delhi University
Spirometer (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2025/B/6690820 Dated : 23-10-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 472000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 62 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Director Vallabhbhai Patel Chest Institute, Deputy Registrar Office, Administrative Block, 3rd Floor, M.S. Building, University of Delhi, Delhi–110007 (Director, Vpci)
Directorate Of Purchase And Stores
University Grants Commission
Millikan oil drop, Plank constant by using LED, Frank-Hertz Experiment Set-up, Meldes Experiment, Curie Weiss Law Experiment, Hall Effect, Zeeman Effect, Faraday effect
Bharat Petroleum Corporation Ltd
Bharat Dynamics Limited
South Central Railway
Directorate Of Purchase And Stores
Fixed Computer Workstation (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6684119 Dated : 23-10-2025 Bid Document 1/12 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 42 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACTING THROUGH PURCHASE OFFICER CRPU, Directorate Of Purchase And Stores, Department of Atomic Energy, Sector-1, Block-AF, Bidhan Nagar, Salt Lake, Kolkata - 700 064, OUR CASE FILE NO. DPS/CRPU/VECC/31319 (The President Of India)
Assam Rifles
Stopwatch, Target Peper Fig 12 Rubuia, Target Peper Fig 11 Combat, Target Tin Fig 11, Target Paper Fig 12 Combat, Duster, Chart for drone Parts, Plastic pipe for drone range, Sand bag, Pencil, White Board 6x4
Armoured Vehicles Nigam Limited
Indian Navy
INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE - Monitor Operations, Theft Prevention, Facility/Asset Protection, Remote Video Monitoring, Vandalism Deterrence; Recording Devices; High media quality; Buyer’s premises; Mandatory Access Control System..
Indian Army
HHRS, Spare Lilon Battery 2400 mAH Capacity, Location Tracking Software for GIS Application for HHRS, Programming Cable and Software in Quantities required fpr HHRS, HHRS Base Stn, Location Tracking Software for GIS Application for Base Stn, Programming Cable and Software in Quantities required for Base Stn, DMR with accessories
Indian Space Research Organization
Technical Education Department Chhattisgarh
Delhi Metro Rail Corporation Limited
Centre For Development Of Advanced Computing (c-dac)
OnePlus 11R, OnePlus Nord N30, OnePlus 11, OnePlus 9R, OnePlus Nord CE4, OnePlus 12R, OnePlus Nord 4, OnePlus 9 Pro, OnePlus Nord CE3, OnePlus Ace 2 Pro, OnePlus Ace 2V
Hindustan Aeronautics Limited (hal)
Bharat Petroleum Corporation Ltd
SUPPLY OF PESO APPROVED COMBO VALVE WITH INTEGRATED ACTUATOR, EFCV AND OPD DEVICE FITTED FOR HIPPO (
Directorate Of Purchase And Stores
Institute For Plasma Research
All India Institute Of Medical Sciences (aiims)
Across all 8,778 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.