Loading…
Loading…
18,059 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
18,059 results • Latest
Karnataka Power Transmission Corporation Limited
Combined Package of the following.WORK AEstablishing 2x20 MVA, 110/11kV sub-station at Rajeev Grama and Construction of 110kV DC Line from existing 110/33/11kV Shiggaon sub-station to proposed 110/11kV Rajeev Grama sub-station using Panther conductor for a distance of about 9.874kms near Konanakeri Village along with Construction of 110kV Terminal Bays at existing 110/33/11kV Shiggaon sub-station in Shiggaon Taluk & Haveri District.Work BUpgradation of existing 2x5MVA, 33/11 kV sub-station to 2X20 MVA, 110/11kV sub-station at Mudenur and construction of 110kV DC line using Panther conductor from 110/33/11kV Tumminakatte Sub-station to proposed 110/11kV Mudenur Substation for a distance of 15.656kms along with construction of 2 nos. of 110kV terminal bays at existing 110/33/11 kV Tumminakatte sub-station in Ranebennur Taluk, Haveri District.Work C Establishing 2X20 MVA, 110/11kV sub-station at Chalageri and construction of 110kV DC line from existing 110/11kV Aremallapura Substation to proposed 110/11kV Challageri substation using panther conductor for a distance of 18.169kms along with construction of 2 nos of 110kV terminal bays at existing110/11kV Aremallapura sub-station in Ranebennur Taluk, Haveri District.Work D Establishing 2x20MVA, 110/11 kV substation at Nittur and construction of 110kV LILO line using Lynx conductor from on going 110kV Tiluvalli-Hunsabhavi SC line to proposed 110/11kV Nittur substation for a distance of 5.013km in Hirekerur Taluk, Haveri District on Partial Turnkey Basis including Supply of all Materials/Equipments (Excluding supply of 11kV Switchgear) and Erection (Including Dismantling and Civil Works) of all Materials/Equipments, Testing and Commissioning.
Directorate of Municipal Administration
1Construction Of CC Drain In ward No 15 Beside Someshwara Nagara Samil And Other Places 2 Construction Of CC Drain In Ward No 03 At Durugamma House To Lokappa House 3 Construction Of CC Drain In Ward No 03 Jnana jyothi Shishu Mandira To Eshwara Temple Road And Other Places 4 Construction Of Pipe Drain In Ward No 07 Near KKRTC Bus Stand Compound and Construction Of CC Drain At Other Places
Directorate of Municipal Administration
Karnataka Power Corporation Limited
Bangalore Electricity Supply Company Limited
Karnataka Power Corporation Limited
Bengaluru Central City Corporation
Providing Project Management Consultancy for the work of Comprehensive development of roads, drains , Culverts , footpath and Providing Street Name Boards in Ward No 167 of Shanthinagara sub division (Total 6 No of Works , Govt Sl No 7,8,9,10,11 and 12 ) Package- 02
Bengaluru Central City Corporation
Comprehensive development of roads, drains and footpath in Ward No 169 and 170 of Domlur sub division (Total 6 No of Works , Govt Sl No 13,14,15,16,17 and 18 ) Package- 03
Bengaluru Central City Corporation
Project Management Consultancy Servises for the work of Comprehensive development of roads, drains , footpath and Improvements to Dhobhi ghat in Ward No 171 and 172 of Domlur sub division (Total 6 No of Works , Govt Sl No 19,20,21,22,23 and 24 ) Package- 04.
Rural Development and Panchayat Raj Department
Rural Development and Panchayat Raj Department
Rural Development and Panchayat Raj Department
Rural Development and Panchayat Raj Department
Bangalore Electricity Supply Company Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Bengaluru Solid Waste Management Limited
Krishna Bhagya Jala Nigam Limited
Bengaluru Solid Waste Management Limited
Bengaluru Solid Waste Management Limited
Krishna Bhagya Jala Nigam Limited
Bangalore Electricity Supply Company Limited
PROVIDING ELECTRICAL INFRASTRUCTURE TO THE REGULARIZED IP SETS BY EXTENDING 11 KV LINES, ERECTION OF 25 KVA STAR 1 (4 STAR) RATED DISTRIBUTION TRANSFORMERS AND EXTENSION OF LT LINE ON PARTIAL TURNKEY BASIS (MAJOR MATERIALS WILL BE SUPPLIED BY BESCOM) UNDER ITEM WISE FIXED PRICE CONTACT ON PERCENTAGE QUOTING BASIS IN
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Krishna Bhagya Jala Nigam Limited
Public Works Department (PWD)
S/R OF B.T. WORK ON MATIYA BAKARKUDA ROAD AT KM 2/2-2/4(126.50) KM 3/4-3/6 (126.50) = 326.50M, DARRI LAWAR KONI ITWA PALI SARSENI MATIYA GIDHPURI ROAD AT KM 15/2-15/4(126.50) = 326.50M, JONDHRA SON BSANTPUR ROAD AT KM 7/8-7/10 (126.50) = 326.50M AND KM 8/4-8/6 (126.50) = 326.50M, SPECIAL REPAIR WORK OF KORMI TO HARDIKALA ROAD & Special Repair of Drain Work at Khandoba - Ratanpur Road Km 4/4 UNDER DIVISION NO.1, BILASPUR (C.G.)
Public Works Department (PWD)
S/R WORK FOR MEDIAN WALL ,GRILL REPAIR & PAINTING WORK OF PENDRIDIH TO NEHRU CHOWK ROAD IN KM 3/6,3/8,3/10,4/4,4/6,5/2,5/4,5/6,7/2&7/4 UNDER SUB DIVISION NO.1 BILASPUR
Public Works Department (PWD)
S/R OF B.T. WORK ON DARRI LAWAR KONI ITWA PALI SARSENI MATIYA GIDHPURI ROAD AT KM 1/2-1/4(126.50) = 326.50M AND KM 16/4-16/6 (126.50) = 326.50, B.T. STRENGTHNING & REPAIRING WORK ON DINDESWARI MANDIR APPROACH ROAD AR KM 1/2-1/6 (100M) = 500M BLOCK- MASTURI, DIST. BILASPUR (C.G.)
Public Works Department (PWD)
S/R WORK FOR LAGRA TO GATAURA (MDR) ROAD AT KM- 2/2, 2/4, 3/2, 3/4. MASTURI TO JAIRAMNAGAR ROAD (MDR) AT KM - 1/2,&1/4. MOPKA KHAIRA GATOURA JAIRAMNAGAR ROAD (MDR) AT KM- 1/4, 1/6, 1/8, 1/10, 5/2, 5/6 5/10, 6/8, 7/2, 7/4, 7/6, 7/8, 8/2, 8/4, 11/8, 12/2, 12/4, 12/6 KHAIRA DEVRI ROAD (VR) AT KM- 1/2, 1/6, 1/8, 2/6, 2/8, 3/4
Public Works Department (PWD)
S/R OF NAVADIH CHOUK TO SEEPAT JHALMALA MOHRA ROAD KM 7/2(110M), 7/4(85M), 7/8(40M) = 235.0 METRE,KM 7/10(70M), 8/2(42M), 8/6(110M),9/2(15M) = 237.0 METRE,KM 9/2(84M), 9/4(50M), 9/6(100M) = 234.0 METRE,KM 9/6(20M), 9/8(180M), 9/10(34M) = 234.0 METRE, KM 11/2(180M) = 180.0 METRE,KM 11/4(77M), 11/6(120M), 11/8(57M) = 254.0 METRE, KM 11/8(30M), 11/10(80M), 12/2(100M), 12/4(50M) = 260.0 METRE AND NAVADIH CHOUK TO SEEPAT JHALMALA MOHRA ROAD KM 3/4, 3/6, 3.00, 4/6, 5/4, 5/6 =865.22 METRE
Public Works Department (PWD)
CONSTRUCTION OF HARNACHAKA TO BHATHALIKALA ROAD KM. 1/2 TO 1/10 IN 2/2 TO 2/10 ROAD & HUME PIPE CULVERT OF S/R WORK THAKURIKAPA TO LOHRAKAPA C.C. ROAD OF S/R WORK
Public Works Department (PWD)
S/R WORK OF BASANTPUR-BHADI ROAD, S/R WORK OF CULVERT AT KM 290/2, 290/4, 290/8, 290/10 AND 286/4, 291/4 IN PENDRA PASAN Road (SH-04), RAILING IN CULVERT AT KM 278/10, 281/6, 289/8 IN PENDRA PASAN(SH-04), S/R WORK OF FACE WALL AND RETAINING WALL IN PIPERKHUNTI AMAGOHAN KHONGSARA ROAD (MDR NO. 86) LENGTH 18.80 KM. UNDER PENDRA DIVISION PENDRA ROAD
Public Works Department (PWD)
FACE WALL, C.C. ROAD, PROTECTION WALL IN ACHANAKMAR KEONCHI ROAD LENGTH 42.00 KM. (SH- NO. 08), ROAD DAMAGED DUE TO HEAVY RAINS AT KM 30/8 OF PENDRA AMARPUR AAMADAND BASTIBAGRA AMGAON ROAD (MDR-78) REPAIR WORK UNDER SPECIAL REPAIR OF FACE WALL, CULVERT COLUMN IN ACHANAKMAR KEONCHI ROAD L. 42.00 KM (SH-08) UNDER PENDRA DIVISION PENDRA ROAD
Public Works Department (PWD)
CONSTRUCTION OF DASHARANGPUR TO SODAR ROAD KM. 2/4 TO 2/8 , SODAR TO JAGTAKAPA ROAD KM. 1/6 TO 1/10 & HUME PIPE CULVERT OF S/R WORK, DEORI TO BHARRAKUNDA ROAD KM. 1/2 TO 1/6 & HUME PIPE CULVERT OF S/R WORK
Public Works Department (PWD)
SILLI TO BAIHAKAPA ROAD KM 1/2 TO 1/8 = 800 M. AND NAWAGAON ( GHU ) TO BAIHAKAPA CHHATA ROAD KM 1/2 TO 1/8 = 800 M. S/R WORK UNDER SUB DIVISION MUNGELI
Public Works Department (PWD)
MUNGELI TO NAWAPARA ROAD KM 1/8 (100) TO 1/10 =300 M.AND RAMAKAPA TO HEDASPUR ROAD KM 2/8 AND 3/8(100) =300 M. S/R WORK UNDER SUB DIVISION MUNGELI
Public Works Department (PWD)
DHANGAON TO SAMBALPUR ROAD KM 1/2 TO 1/8 = 800 M. AND DABO TO HARIYARPUR ROAD KM 1/2 TO 1/8 = 800 M. S/R WORK UNDER SUB DIVISION MUNGELI
Public Works Department (PWD)
CHAMARI APPROACH ROAD KM 1/2 TO 1/8 = 800 M. AND SIPAHI TO GADAGHAT ROAD KM 1/2 TO 1/8 = 800 M. S/R WORK UNDER SUB DIVISION MUNGELI
Public Works Department (PWD)
KHAMARIYA APPROACH ROAD KM = 600 M.AND TORALA APPROACH ROAD KM 1/2 TO 1/10 =1.00 KM. S/R WORK UNDER SUB DIVISION MUNGELI
Public Works Department (PWD)
SETGANGA PARASWARA ROAD KM 1/6 & 4/8 3 METER SPAN SLAB CULVERT ,PENDARAKAPA BHARUWAGUNA DABO CHHATAN ROAD 3/10 & 4/8 (100)= 800 M. DULLAPUR JALLI ROAD KM. 1/2 TO 1/4 (100) = 300 M. PALANSARI TO BODTARA ROAD KM. 1/2 TO 2/10 (100) = 300 M. S/R WORK UNDER SUB DIVISION MUNGELI
CPWD
Directorate of Municipal Administration
Directorate of Municipal Administration
Directorate of Municipal Administration
Purchasing of Alum and Chlorine for Kamatagi water filtration unit
Across all 18,059 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.