Loading…
Loading…
9,472 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
9,472 results • Latest
South East Central Railway
XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6985095 Dated : 25-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 20700 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur)
Indian Army
25-220992, 40-302254, 123-02096, 55040736, JCBNK001, 40-303394, 4H39903000, 61203300, 335C1280, 14060011
Salem Steel Plant
Salem Steel Plant
Indian Army
Prefabricated Shelter Units 24 feet x 12 feet, Installation and Finishing Civil Electrical Plumbing, Connection to existing water supply electric supply sewage supply 1, Connection to existing water supply electric supply sewage supply 2, Connection to existing water supply electric supply sewage supply 3
Western Coalfields Limited
Indian Army
Indian Army
Indian Army
High End Desktop Computer (Q2), Multifunction Machine MFM (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2), Scanner (V3) (Q2), Dslr/Compact/Handheld Camcorder Or Video Cameras (V2) (Q2), Multimedia Projector (MMP) (Q2) (3 (3 ))
Indian Navy
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; ADDRESSABLE FIRE DETECTION SYSTEM; Service Provider
Directorate General Of Lighthouses And Lightships
Bus Hiring Service - Short Term - Local; 40-42; A.C. Deluxe (ACX); 100, Short Term Cab & Taxi Hiring Services - Premium SUV; Local; 80Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - Sedan; Local; 80Kms x 10Hrs, Short Term Cab & Taxi Hiring Services - Premium SUV; Local 24*7; 300Kms x 24Hrs, Bus Hiring Service - Short Term - Local; 16-18; A.C. Deluxe (ACX); 100
Indian Army
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7043366 Dated : 25-12-2025 Bid Document 1/122 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Primary product category Toner Cartridges/Ink Cartridges/Consumables for Printers Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Navy
Indian Navy
Indian Air Force
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Repair of UGSS N2; Service Provider
Gail India Limited
Indian Army
Electronic Score Board (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7043278 Dated : 25-12-2025 Bid Document 1/5 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Navy
Indian Navy
North East Frontier Railway
Indian Army
Correspondence Envelopes (V3) (Q4), Correspondence Envelopes (V3) Conforming to IS 13892 (Q4), Sticky Notes (V2) (Q4), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Double sided tape (Q4)
Indian Army
File/Folder (V3) (Q4), Dak Pad (V2) (Q4), Binding Covers (Q4), Register (V2) (Q4), Correspondence Envelopes (V3) (Q4), Sticky Notes (V2) (Q4), Sealing Wax (V2) as per IS 868 (Q4), Manual Pencil Sharpener (V3) (Q4), Double sided tape (Q4) (3 (3 ))
Indian Army
Indian Army
Pressure Sensitive Adhesive Tapes with Plastic Base (V4) Conforming to IS 13262 (Q4), Self Adhesive Flags (V3) (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Glue Stick (V3) (Q4), Manual Pencil Sharpener (V3) (Q4), Eraser (V2) (Q4)
Indian Army
Writing Pens (Q4), Correction Fluid Pen(V3) (Q4), Markers and Highlighters (Q4), Staple Pins/Staples(V3) (Q4), Tags For Files (V3) Conforming to IS 8499 (Q4), Binder Clips (V3) Conforming to IS 8231 (Q4), Register (V2) (Q4)
Controller General Of Defence Accounts
Indian Army
Indian Army
Ice Lined Refrigerator (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7043617 Dated : 25-12-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Jammu And Kashmir Police
Indian Army
LV7-STLN B-1301806, LV7-STLN B-3942303, LV7-STLN B- 8827003, LV7-STLN F-0201410, LV7-STLN F-0741922, LV7-STLN F-7474000-4310-003690-
State Election Commission (sec), Uttar Pradesh
Locks medium size, Locks big size, Ball point pen Link, Dot pen Reynold, Pilot pen, Gel pen, Twine, Elastic band, Stamp Pad Small, Stamp Pad Medium, Stamp Pad Large, Stamp Pad ink, Highlighter Pen, Sketch Pen, Paper weight medium, Blades Topaz 5 in a packet, Sooja Sada, Sooja Steal handle, Sooja with handle, Bans Paper full size, Sealing Bax Red Packet 200g, Candle 200mm, Matchbox, Needle Small Per Packet, Needles large and thick Per Packet, Thread Bunch 50 grams, Gum tube, Fevistick small, Fevistick big, Gum Bottle 60ml, Gum Bottle 150ml, Gum Bottle 700ml, Plain Paper A4 size 75 GSM, Photo State Paper Century A4 size 75 GSM, Photo State Paper Century Legal size 75 GSM, Colored A4 size paper 75 gsm, Register 1 quire, Register 2 quire, Register 3 quire, Register 4 quire, Register 5 quire, Register 6 quire, Register 7 quire, Register 8 quire, Envelope 4x9 inch, Envelope 4x10 inch, Envelope 5x11 inch, Envelope 9x11 inch, Envelope 12x15 inch, Envelope 11x13 inch, Envelope A4 size water proof, All Pin Box, Stapler Kangaroo small, Stapler Kangaroo big, Stapler pin small, Stapler pin large, Guard file, Plastic folder A-4 size booklets, Plastic folder FS size, Calculator 08 Digit, Calculator 12 Digit, Pen stand with 4 pen holders, Pen stand including 4 ball pens, Computer Printer Cartridge HP Laser Jet B8 A, Computer Printer Cartridge HP Laser Jet pro MFP M 128 F N 12A, Computer Pinter Cartridge Canon NPG- 59 Toner, Strawboard A4 size, Daak pad Cloth, CD blank, CD marker, DVD blank, Pencil, Pencil sharpner, Scale plastic 13 inch, Fluid bottle, Dispatch register, Punch machine, File cover medium, File cover high quality, Tag bunch, Carbon black chorus, Carbon blue chorus, Dot pen refill, Pencil wood, Cloth markin, Sketch pen Black, Punch plier chorus, Wet sponge, Wrapper strip, kadak Patti with Pad, Ball of thread 200 grams 8 ply, Pencil Lilac, All Pin Packet 100 gm in one packet, Correcting Fluid Bottle, Correcting Fluid, Marker pen large, Marker pen small Black, Name slip sticker, U clip, Flag Packet, Slip pad Note pad, Spiral pad diary, Zonal Sector plastic badges, Pen Drive 16 GB, Pen Drive 32 GB, Pen Drive 64 GB, Computer Hard Disk 1 TB, Computer Hard Disk 2 TB, Computer Hard Disk 3 TB, Computer Hard Disk 4 TB, Polythene bags to hold up to 5kg of material, Polythene bags to protect ballot boxes from rain, Ball pen Use and throw, Clip board, Stamp one line, Stamp two lines, Stamp three lines, Stamp four lines, Stamp five lines, Stamp six lines, Stamp seven lines
Central Coalfields Limited
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service
Sarva Shiksha Abhiyan (ssa)
Interactive Panels with CPU (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/7043414 Dated : 25-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 12 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 252000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/8 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DISTRICT PROJECT COORDINATOR Tikamgarh, School Education Department Madhya Pradesh, Sarva Shiksha Abhiyan (SSA), (Dpc Tikamgarh)
Airports Authority Of India
Bharat Coking Coal Limited
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6954542 Dated : 25-12-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 95580 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Visvesvaraya Iron And Steel Plant
Dot Matrix Printers (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 2 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/7033954 Dated : 25-12-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Baba Ghulam Shah Badshah University Rajouri
White Board Markers Black, White Board Markers Blue, White Board Markers Red, Marker Refill Ink Black, Marker Refill Ink Blue, Marker Refill Ink Red, Table Call Bell, Paper Reams A4 White, Paper Reams A4 Green, Paper Reams Legal Size, Bond Paper A4, Transparent Tape Big, Transparent Tape Small, Brown Tape, Double Sided Tape, Highlighter, Stapler Big, Stapler Small, Stapler Pins Big, Stapler Pins Small, Tags Big, Tags Small, Flags, Glue Stick, Cutter, Correction Pen, Notepads, Scale Steel, Scale Plastic, Sticky Notes, White Chalk, Colored Chalk, Duster, Scissors, Pencils, Erasers, Sharpener, Pilot Pen V7 Blue, Pilot Pen V7 Black, Uniball Eye Blue, Uniball Eye Black, Uniball Eye Violet, Ball Pen Blue, Ball Pen Red, Ball Pen Black, OHP Marker Permanent, Permanent Marker, Paper File Folder, Dak Pad, Stamp Pad, Ring Binder File, Single Hole Punch, Gum Bottle, Calculator Big, Cobra File, Pen Drive 32GB, Pen Drive 64GB, Pen Drive 128GB, Box File, Desk Organizer, Desk Binder Organizer, Writing Desk Table, Plain Register, Long Register, Pen Holder, Double Punch Machine, Lining Sheets, Tape Dispenser, Transparent Envelope, Thread Roll, Lac, Candle, Drawing Sheets, Spiral Binding Roll
Salem Steel Plant
HIGH TEMP SLEEVE -DIA 20 TO 25MM, HIGH TEMP SLEEVE - DIA 10 TO 15MM
Forest Department Chhattisgarh
Forest Department Chhattisgarh
Across all 9,472 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.