Loading…
Loading…
8,042 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
8,042 results • Latest
Indian Army
Fuser Assembly for Photocopy Machine, Power Supply Card for Photocopy Machine, Logic Card for Canon Printer, UPS Battery 12V 7AH, SMPS
Marketing Division
Custom Bid for Services - Statutory testing & painting, of 5/10 year due IOC cylinders, ex- LPG Plant Ilayangudi Similar Category Testing Service for On-Board/Commissioned Equipment/Instrument related to Plant
Indian Institute Of Technology (iit)
Hindustan Petroleum Corporation Ltd
AMC of Integrated Security and Surveillance System - Health Monitoring Solution for CCTV System; Comprehensive; Hardware, Software, Wireless System, Networking System; Consumables to be provided by Service Provider (included in the contract cost); In..
Indian Army
Indian Army
PAINT DARK GRAY, H1 B SODA ASHTECHICAL, Y3 INSULATION TAPE ADHESIVE, H9 TAPE LIGHT BLUE, FEVICAL, H1 A PAINT REMOVER, H1 A PAINT BLACK, Y3 TAPE COTTON IYC, H1A PAINT ALUMINIUM, H1 A THINNER ANTICHILL
E-municipalities - Eservices To Citizens And Employees Of
Indian Army
Indian Army
Panchayati Raj Department Uttar Pradesh
Metal Shelving Racks (Adjustable Type) confirming to IS 1883 (V2) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2), Chair (Without Wheels) for General Purpose (Q2), Computer Table (V3) (Q2) (3 (3 ))
Western Coalfields Limited
Indian Army
24 Port Manageable, 16 Port Manageable, 4U Switch Rack with accessories, UTP Cable Cat-6, RJ 45 con, 600 V A UPS
Indian Army
AC Refilling for strome, AC Refiling for scrpio, Sheet Open, Industrial Chalk, Matting Rub
Indian Army
Supply of Multi parameter Analyser advanced microprocessor system to analyse COD BOD TSS PH Flow with OFFSET correction touch screen display LCD IP65 enclosure SS 316, Supply of reporting software with user configurable reports along with data collection of parameters events alarms complete with user defined data Software upto 30 monitoring systems, Supply and testing of electromagnetic flow meter with inline full bore electromagnetic type having bi-directional flow and totalisation facility etc complete all as specified and directed of 150mm, Supply and testing of electromagnetic flow meter with inline full bore electromagnetic type having bi- directional flow and totalisation facility etc complete all as specified and directed of 100mm, Supply and testing of electromagnetic flow meter with inline full bore electromagnetic type having bi-directional flow and totalisation facility etc complete all as specified and directed of 80mm, Supply and testing of electromagnetic flow meter with inline full bore electromagnetic type having bi- directional flow and totalisation facility etc complete all as specified and directed of 50mm, Supply and testing of electromagnetic flow meter with inline full bore electromagnetic type having bi-directional flow and totalisation facility etc complete all as specified and directed of 40mm Bid Number : GEM/2025/B/6939715 Dated : 27-12-2025 Bid Document 1/13
Indian Army
M4 Chip (Mac OS), 16 GB unified memory, SSD-512, Processor -10 Core CPU & GPU, Netural Engine 10 Cor, Intel Core i7, win 11 professional, SSD-1GB, RAM-32 GB with o1 year warranty
Indian Army
INDUSTRIAL HEATING ELEMENT 9KW 3 PHASE 2 POINT 6 MTR LONG, SPLIT AC OUTDOOR KIT 2 TON WITHOUT COMPRESSOR, DESERT COOLER KIT FAN MOTOR 90WATT 400RPM COOPER WOUNDED, DESERT COOLER MOTOR COOPER WOUNDED, MCCB TPN 250AMP 36KA, LED DOWN LIGHT FITTING 2 BY 2 36WATT RECESSED TYPE, PHASE SEQUENCE CORRECTOR 15HP CAPACITY WITH DOUBLE CONTACTOR SYSTEM, MCCB 63AMP TPN 16KA, LED DOWN LIGHT FITTING 15 WATT RECESSED TYPE, PHASE SEQUENCE CORRECTOR 20HP CAPACITY WITH DOUBLE CONTACTOR SYSTEM, LED DOWN LIGHT FITTING 5 OR 6 WATT RECESSED TYPE, POWER CONTACTOR ML4 WITH 2NO PLUS 2NC 415 VOLT, LED T5 TUBE LIGHT FITTING 20WATT, ELECTROHYDROLIC THRUSTOR BRAKE COMPLETE SET WITH BRAKE SHOE LINER TYPE MDT 250 18, 3POLE POWER CONTACTOR MNX 110 2NO PLUS 2NC 415 VOLT, ELECTROHYDROLIC THRUSTOR BRAKE COMPLETE SET WITH BRAKE SHOE LINER TYPE MDT 300 18, ELECTROHYDROLIC THRUSTOR BRAKE COMPLETE SET WITH BRAKE SHOE LINER TYPE MDT 150 18, POWER CONTACTOR MCX 325AMP, MCCB 4POLE 100AMP 25KA, LED T5 TUBE LIGHT FITTING 10WATT, 3 POLE POWER CONTACTOR MNX 140 AMP 2NO PLUS 2NC 415 VOLT, 3 POLE POWER CONTACTOR MNX 185 AMP 2NO PLUS 2NC 415 VOLT, 4 POLE POWER CONTACTOR TYPE 70AMP 2NO PLUS 2NC 415 VOLT, ELECTROHYDROLIC THRUSTOR BRAKE COMPLETE SET WITH BRAKE SHOE LINER TYPE MDT 200 18, POWER CONTACTOR ML3 WITH 2NO PLUS 2NC 415VOLT AND COLOI VOLTAGE 110VOLT, CHANGE OVER SWITCH 63AMP 4POLE, CHANGE OVER SWITCH 125AMP 4POLE, POWER CONTACTOR ML 2 2NO PLUS 2NC INPUT OUTPUT COIL VOLTAGE 415 OBLIQ 110VOLT, RCCB 25AMP 4POLE 100M, LIFT CABIN FAN 300MM, RCCB 40AMP 4POLE 300M, LED DOWN LIGHT 2 BY 2 48WATT, 3 POLE POWER CONTACTOR ML 4 WITH 2NO PLUS 2 NO 415 VOLT AND COIL VOLTAGE 415 OBLIQUE 110 VOLT, XLPE Cable for Working Voltages up to and Including 1.1 KV as per IS 7098 (Part 1) (Q2), PVC Copper Cable Single Core and Multi Core Circular Sheathed Cable with Rigid Conductor (V2) as per IS 694 (Q2) Bid Details 2/32
Indian Army
Foot Mat, Box, Cover, Brass, Plate, Rod, Rod Braket, Black Cover, Neck Rest, Perfume, Visior, Towel, Number Plate, Seat Cushine, 7D Foot Mat, Door Curtain
Ntpc Limited
A106 pipe 40NB schedule 160, A106 pipe 50NB schedule 160, A106 reducer 300 x 150 NB schedule 80, A106 T 40 NB schedule 160, A106 T 50 NB schedule 160, Elbow 50NB schedule 160
Indian Army
FUEL PIPE METALIC, STOPPER SOLENOID, AIR FILTER, CYLINDER HEAD, FUEL FILTER ASSY, CYLINDER LINER, CAPACITOR, FEED PUMP
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048437 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Title 1, Title 2, Title 3, Title 4, Title 5, Title 6, Title 7, Title 8, Title 9, Title 10, Title 11, Title 12, Title 13, Title 14, Title 15, Title 16, Title 17, Title 18, Title 19, Title 20, Title 21, Title 22, Title 23, Title 24, Title 25, Title 26, Title 27, Title 28, Title 29, Title 30, Title 31, Title 32, Title 33, Title 34, Title 35, Title 36, Title 37, Title 38, Title 39, Title 40, Title 41, Title 42, Title 43, Title 44, Title 45, Title 46, Title 47, Title 48, Title 49, Title 50, Title 51, Title 52, Title 53, Title 54, Title 55, Title 56, Title 57, Title 58, Title 59, Title 60, Title 61, Title 62, Title 63, Title 64, Title 65, Title 66, Title 67, Title 68, Title 69, Title 70, Title 71, Title 72, Title 73, Title 74, Title 75, Title 76, Title 77, Title 78, Title 79, Title 80, Title 81, Title 82, Title 83, Title 84, Title 85, Title 86, Title 87, Title 88, Title 89, Title 90, Title 91, Title 92, Title 93, Title 94, Title 95, Title 96, Title 97, Title 98, Title 99, Title 100, Title 101, Title 102, Title 103, Title 104, Title 105, Title 106, Title 107, Title 108, Title 109, Title 110, Title 111, Title 112, Title 113, Title 114, Title 115, Title 116, Title 117, Title 118, Title 119, Title 120, Title 121, Title 122, Title 123, Title 124, Title 125, Title 126, Title 127, Title 128, Title 129, Title 130, Title 131, Title 132, Title 133, Title 134, Title 135, Title 136, Title 137, Title 138, Title 139, Title 140, Title 141, Title 142, Title 143, Title 144, Title 145, Title 146, Title 147, Title 148, Title 149, Title 150, Title 151, Title 152, Title 153, Title 154, Title 155, Title 156, Title 157, Title 158, Title 159, Title 160, Title 161, Title 162, Title 163, Title 164, Title 165, Title 166, Title 167, Title 168, Title 169, Title 170, Title 171, Title 172, Title 173, Title 174, Title 175, Title 176, Title 177, Title 178, Title 179, Title 180, Title 181, Title 182, Title 183, Title 184, Title 185, Title 186, Title 187, Title 188, Title 189, Title 190, Title 191, Title 192, Title 193, Title 194 Tab Acetazolamide 0.25g, Tab Alendronate Sodium 70mg, Tab Allopurinol 100 mg, Tab Allopurinol 300 mg, Tab Amlodipine 10 mg, Tab Atenolol 50mg + Amlodipine 5 mg, Acebrophylline 100 mg Cap, Tab Acenocoumarol 4 mg, Tab Biotin 10 mg, Tab Bisacodyl 5 mg, Tab Calcium acetate 500 mg, Tab Calcium Acetate 667 mg, Tab Cetirizine 5 mg + Paracetamol 325 mg + Phenylephrine 10 mg, Tab Chlordiazepoxide 10mg, Tab Chloroquine Phosphate 250mg, Tab Chlorzoxazone 500 mg + Diclofenac Sodium 50 mg + Paracetamol 325 mg, Tab Clarithromycin 500mg, Tab Clonazepam 0.5 mg, Tab Conjugated equine estrogen 0.625 mg, Tab Dapagliflozin 5 mg, Tab Deflazacort 6 mg, Tab Diethylcarbamazine 50mg, Tab Dolutegravir 50 mg + Lamivudine 300 mg + Tenofovir 300 mg, Tab Doxylamine Succinate 10mg USP+ Pyridoxine Hydrochloride 10 mg IP, Tab Drotaverine HCl 40 mg, Tab Enalapril 5 mg, Tab Enalapril Maleate 2.5 mg, Tab Entacavir 0.5 mg, Tab Esomeprazole 40 mg, Tab Etoricoxib 120 mg, Tab Ezetimibe 10 mg, Tab Ferrous ascorbate 100mg + Folic Acid 1.5mg, Tab Gabapentin 100 mg, Tab Glipizide 5mg, Tab Isoxsuprine 10mg, Tab Letrozole 2.5 mg, Tab Levetiracetam 1000 mg, Tab Levosulpiride 25 mg, Tab Lithium Carbonate 300 mg Cap, Tab Levodopa 100 mg +carbidopa 10 mg, Tab Loperamide 2mg, Tab Mebeverine HCl 135 mg, Tab Methotrexate 15 mg, Tab Methotrexate 2.5mg, Tab Methotrexate 5 mg, Tab Methylprednisolone 16 mg, Tab Metoclopramide 10 mg, Tab Oestradiol Bid Details 2/135
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048679 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048610 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048478 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048509 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Food Corporation Of India (fci)
Mod Sectt Establishment
PTZ Camera, Cat 6 Cable, Junction Box, 8 Port Switch, IP Camera
Indian Army
M Gypsy Veh BA No 15 B 116914X Radiator Assembly, MC HH Veh BA No 20A 069940K Engine Assembly, MC RE Veh BA No 20A 073240A Chair Sporket Kit, MC RE Veh BA No 20A 073240A Rear Shock Absorber, MC RE Veh BA No 20A 073240A Rear Brake Shoe, MC RE Veh BA No 20A 073240A Change Part, MC RE Veh BA No 17A 071552H Brake Light Cover, MC RE Veh BA No 17A 071552H Side Stand, MC RE Veh BA No 17A 071552HFront Brake Shoe, MC RE Veh BA No 17A 071552H Rear Brake Shoe, MC RE Veh BA No 17A 071552H Chain Sprocket Kit, MC RE Veh BA No 17A 071552H Engine Oil Leakage and checking, MC RE Veh BA No 17A 071552H Clutch assembled, MC RE Veh BA No 17A 071552H Seat full repair, MC RE Veh BA No 17A 071552H Rear wheel bearing, MC RE Veh BA No 17A 071552H Spark Plug, MC RE Veh BA No 17A 071552H Part change, M gypsy Veh BA No 06B 093956A Clutch Plate, M gypsy Veh BA No 06B 093956A Pressure plate, M gypsy Veh BA No 06B 093956A Release Bearing, M gypsy Veh BA No 06B 093956A Engine Mounting pad, M gypsy Veh BA No 06B 093956A Engine wall Door packing, M gypsy Veh BA No 06B 093956A Gear box assembly service, M gypsy Veh BA No 06B 093956A Front Brake Pad, M gypsy Veh BA No 06B 093956A Rear Brake pad, M gypsy Veh BA No 06B 093956A Spark Plug, M gypsy Veh BA No 06B 093956A Ignition Coil, M gypsy Veh BA No 06B 093956A new part fitting, M gypsy Veh BA No 18B 127556X Jalwa Horn Wire and switch change, M gypsy Veh BA No 18B 127556X Gear box oil seat front and rear, M gypsy Veh BA No 18B 127556X Fuel pump motor, M gypsy Veh BA No 18B 127556X Engine mounting pad, M gypsy Veh BA No 18B 127556X Spark Plug, M gypsy Veh BA No 18B 127556X part change, ALS Veh BA No 14D 193220X Self starter assembly, ALS Veh BA No 16D 199451L Rotary pump removing, ALS Veh BA No 16D 199451L Pump Nozzle, ALS Veh BA No 16D 199451L TD Piston, ALS Veh BA No 16D 199451L Cumplate, ALS Veh BA No 16D 199451LTappet Roller, ALS Veh BA No 16D 199451LTensioner, ALS Veh BA No 16D 199451L Full service Kit, ALS Veh BA No 16D 199451L Sensor Assembly, ALS Veh BA No 16D 199451L Pump Stripping and service, ALS Veh BA No 16D 199451L Pump assembly removing, MC RE Veh BA No 16A 069383X Front Brake Shoe, MC RE Veh BA No 16A 069383X Side Mirror, ALS Veh BA No 16 199821W Self Starter Assembly, ALS Veh BA No 13D 191580A Self Starter Assembly, ALS Veh BA No 13D 191580A Clutch Plate, ALS Veh BA No 13D 191580A Pressure Plate, ALS Veh BA No 13D 191580A Release Bearing, ALS Veh BA No 13D 191580A Fly wheel ring, ALS Veh BA No 13D 191580A Gear Box Assembly, 10Ton Veh BA No 09 D 182139K Self Starter Assembly, 2 and half ton Veh BA No 14C 100400Y Clutch m cylinder new part fitting, ALS Veh BA No 14D 195825X air compressor assembly repair, Army Bus BA No 06P 01239H Battery cut off switch, Army Bus BA No 06P 01239H combination switch, Army Bus BA No 06P 01239H part change, Army Bus BA No 03P 015186N Ignition switch with fitting, Army Bus BA No 03P 015186N Master switch fitting, MC HH No 20A 073741A Chain sprocket Kit Bid Details 2/46
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048421 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/7048569 Dated : 27-12-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048406 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048625 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - STREET LIGHT Repair and maintenance work; STREET LIGHT Repair and maintenance work; Service Provider
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048652 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048368 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048389 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048718 Dated : 27-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Panchayati Raj Department
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - STREET LIGHT Supply; As Per Tender Document; Service Provider
Panchayati Raj Department
Drinking Water ATM/Water Vending Machine (Version 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7048734 Dated : 27-12-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Armed Forces Tribunal
Western Coalfields Limited
Indian Army
OIL FILTER, AIR CARTRIDGE, FUEL FILTER, WATER SEPARATOR FILTER, AIR FILTER
Indian Navy
SOFT BROOM PLASTIC, VIM LIQUID DISH WASH, RED HARPIC, GAS BAG SMALL, LIZOL, BRASSO 500 ML, LIQUID SOAP, SCRAPPER STEEL WIRE, SCRAPPER HARD SPONGE, GAS BAG LARGE, 2 BRUSH, 1 BRUSH, REFILL 4, REFILL 2, DECK WASHING HARD BRUSH WITHOUT HANDLE, REFILL 4 HANDLE
Indian Army
Helmet, Bullet Proof Jacket, Hand Gloves, Elbow Guard, Knee Guard, 03 Point Ceiling, Goggles, Traffic Button Light
Begusarai District Panchayats
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7049149 Dated : 27-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
DOOR LOCK OUTER, DOOR LOCK INNER, RETURN LINE HOSE ASSY, 352 DIA CLUTCH DISC ASSY, ASSY CLUTCH DISC PRESSURE PLATE
Indian Army
Telmisartan 40mg tab, Linagliptin 5 mg tab, Thyroxine sodium 0 point 025 mg tab, Thyroxine 50mcg tab, Thyroxine sodium 0 Point 1 mg tab
Indian Army
OFLOXACIN OZ TAB, FORMOTEROL 6MCG PLUS BUDESONIDE 400MCG ROTACAP, NORMAL SALINE 500ML, GLUCOSAMINE 500 MG PLUS DIACERIN 50 MG TAB, HYDROXYZINE HCL 25 MG TAB, ORAL TEETHING SOL ZYTEE MOUTH LOTION 10ML
Across all 8,042 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.