Loading…
Loading…
9,960 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
9,960 results • Latest
Indian Army
Core
Cleaning, Sanitation and Disinfection Service - Outcome Based - Office/Commercial/Institutions/Residential; General Cleaning (Sweeping, Mopping, dusting); Indoor
Indian Army
Stainless Steel Name Plates, Monograms, Labels - BHEL (Q3) (3 (3 ))
Indian Air Force
Indian Air Force
Indian Air Force
Indian Air Force
Indian Army
Convection Heaters - Room Heater, Blower (Q3) (3 (3 ))
Indian Army
Indian Army
Indian Army
Signage Board (V4) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7066018 Dated : 03-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 38000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Air Force
Tool bag (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7065986 Dated : 03-01-2026 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Air Force
Indian Air Force
Microbial Fuel Test Kit (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7066132 Dated : 03-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Portable Power Supply Unit (Q3) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 2 year (s) Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7066247 Dated : 03-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Indian Air Force
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - DEFENCE INSTALLATION; BIO METRIC FACE RECOGNITION SYSTEM ALONG WITH ACCESSORIES; Service Provider
Indian Army
Repair and Overhauling Service - Heat Pillar; Gopi & Beco; Yes; Buyer Premises, Repair and Overhauling Service - Refrigerator; Blue Star; Yes; Buyer Premises
Indian Air Force
Indian Army
Indian Army
Assam Rifles
State Bank Of India (sbi)
Indian Army
Wood Craft Box (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7067142 Dated : 03-01-2026 Bid Document 1/6 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 25000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
State Bank Of India (sbi)
State Bank Of India (sbi)
State Bank Of India (sbi)
Indian Army
Telescopic Pole Pruner (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7068584 Dated : 03-01-2026 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Hydraulic Jacks for Automobiles Conforming to IS 4552 (Part 2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7068617 Dated : 03-01-2026 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Indian Army
File/Folder (V3) (Q4), Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Flexible Transparent Sheet (V2) (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7068821 Dated : 03-01-2026 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Primary product category File/Folder (V3) Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Dg Of Defence Estate
DOOR, UPVC WINDOW, FLOORING, TERRACATTA TILES, TOILET SEAT, WASH BASIN, HAND JET, TOWEL STAND, FLOOR CC, FITTING AND INSTALLATION
Indian Army
High Capacity Wireless MIMO Radio, 34 dBi Antenna, SPD NID, Cat6 Cable, Antenna Mount, DC PoE Injector, RF jumper, Digital Earthing, Portable Configuration Terminal, 3 KVA UPS with bty bank, 3 KVA stabilizer, TDM over IP, Installation Kit
Indian Army
Treadmill Commercial, Manual Book, PCB, Warranty 1 Year of complete Treadmill, Warranty 2 Year of Motor
Indian Army
DIFFERENTIAL CASE KIT, HEAD LIGHT ASSY, BRAKE SHOE SET, SPARK PLUG, SIDE INDICATOR, DISC ROTOR WHEEL, BONNET CATCH ASSY, BONNET CABLE, FUEL FLEXIBLE PIPE
Indian Army
Stack, S 500 Frame, Soldering iron 8A and Wire, Patch Antenna, Dropping Mechanism, Cable tie small medium and large
Indian Army
ARMATURE ASSY 12V, FIELD COIL, PINION, CLUTCH PLATE, REGULATOR SR 60
Across all 9,960 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.