Loading…
Loading…
1,675 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
1,675 results • Latest
Indian Army
OIL FILTER, ENGINE OIL FILTER, LUB OIL FILTER, AIR FILTER, BOLT BANJO HEX
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099661 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Chlorthalidone 12Point5 mg Tab, Vitamin E 400mg gelatin Cap, Tube of 30 gm gel containing Diclofenac Diethylamine IP 1Point16Per ww Equivalent to Diclofenac Sodium 1Per ww Virgin Linseed Oil BP 3Per Methyl Salicylate IP 10Per Menthol IP Per ww, Corn Cap pkt of 4, Cannula IV with injection port And wing size16G, Cannula IV with injection port And wing size20G
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099669 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Bontress PROpLUS Scal Serum Tetrapeptides bott of 60ml Capixyl 5Per Redensyl 3Per Procapil 3Per Anagain 3Per Glenmark, Bupivacaine HCl 5 mgObliqueml 20 ml Inj, Glycopyrrolate Formoterol Fumarate and Budesonide Inhalation 9mcg 4Point8 mcg and 160mcg Forglyn Plus, Mask for Nebuliser Adult, Fluticasone Propionate 50 mcg BP Nasal spray
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099683 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099680 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099660 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099703 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099678 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Pune District Panchayats
Central Coalfields Limited
Graphite Asbestos Gland Packing 16mm, GST on Graphite Asbestos Gland Packing 16mm, Graphite Asbestos Gland Packing 12mm, GST on Graphite Asbestos Gland Packing 12mm, Graphite Asbestos Gland Packing 10mm, GST on Graphite Asbestos Gland Packing 10mm
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099715 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099719 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Sarva Shiksha Abhiyan (ssa)
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099712 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Rural Development Department
High Mast Lighting Tower for large area with LED Flood Lighting System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099722 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Centre For Development Of Advanced Computing (c-dac)
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7099696 Dated : 11-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Navy
LAPTOP WITH M4 CHIP, LAPTOP WITH NEW INSPIRON 13, 2 IN 1 LAPTOP PAVALION X360, TABLET PRO 11 M4
Indian Army
Radiator Cap, Speedometer Cable, Air Filter, Set And connecting rod Bearing Std, Brake Booster, Dual Brake Valve, Driven Plate for Clutch, Brake Pad, Grommet Timing Belt cover, Assy parking Brake Cable, Lock assy Gate Side LH, Bearing set connecting Rod, Bearing Tapered Roller 15 x 42x14.25mm, Sprocket Timing 14T, Axual Roller Brg, Assembly Door Lock RH, Wheel Cylinder Assy, Gasket cylinder Head, Caliper Assy, Pad Assy, Nozzle, Assy Prop Shaft complete Front, Pressure plate, clutch plate, Release Bearing
Bharat Petroleum Corporation Ltd
Indian Army
Water Separator, Fuel Filter 3 Pin, Pressure Plate Assy, Clutch Plate Assy, Clutch Release Brg, Tie Rod Assy, Water Pump Assy, Oil Filter, Radiator Pipe, Control Arm, Center Pin Assy, Connecting Rod
Indian Army
BP Bellow, Heating Element, Bty 12V 3AH, Toggle Switch, Section Apparatus Power Adapter
Indian Army
Set Of Gasket Kit, Assy Universal Joint, Graduated Hand Brake Valve, Needle Roller Bearing FRT Axle, Assy Window Regulator Lh, Assy Window Regulator Rh, Air Dryer with Unlader Valve, Battery Cut off Switch, Assy Cable Complete, Soloenoid
Indian Army
Inherent Fire Retardant Overall for Firefighting and Rescue Purpose (Protective Coveralls) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7099735 Dated : 11-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Past Performance 60 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Lala Ram Swarup Institute Of Tuberculosis And Respiratory
Oxygen Flow Meter (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7099743 Dated : 11-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Medical Health And Family Welfare Department Uttar
Steel Bookcases conforming To Is 7761 (V2) (Q2), Steel Almirah/Cabinets conforming to IS 3312 (V4) (Q3) (3 (3 ))
Medical Health And Family Welfare Department Uttar
Rural Development Department
RO Water Plant for Hemodialysis (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7099761 Dated : 11-01-2026 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
General Administration Department (gad) Chhattisgarh
Line Interactive UPS with AVR (V2) (Q2), Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Mineral Exploration And Consultancy Limited
Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply Marked to IS 15636 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7098518 Dated : 11-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Ntpc Limited
FEED GATE_Schedule 1 _ Item_10_M5656046001_100265183, Schedule 2 _ Item_20_M5656046002_100265183, Schedule 3 _ Item_30_M5656046003_100265183, Schedule 4 _ Item_40_M5656046004_100265183, Schedule 5 _ Item_50_M5656046008_100265183, Schedule 6 _ Item_60_M5656046009_100265183, Schedule 7 _ Item_70_M5656046011_100265183, Schedule 8 _ Item_80_M5656046012_100265183, Schedule 9 _ Item_90_M5656046013_100265183, Schedule 10 _ Item_100_M5656046014_100265183, Schedule 11 _ Item_110_M5656046017_100265183, Schedule 12 _ Item_120_M5656046018_100265183, Schedule 13 _ Item_130_M5656046019_100265183, Schedule 14 _ Item_140_M5656046020_100265183, Schedule 15 _ Item_150_M5656046026_100265183, Schedule 16 _ Item_160_M5656046027_100265183, Schedule 17 _ Item_170_M5656046028_100265183, Schedule 18 _ Item_180_M5656046029_100265183, Schedule 19 _ Item_190_M5656556161_100265183, Schedule 20 _ Item_200_M5656556165_100265183
Hindustan Petroleum Corporation Ltd
Monthly AMC of Fire, Element Pre Fuel Filter, Element Micro Fuel filter, LUB OIL FILTER 232V12, GREAVES LUB OIL CI4 20 LTR PACK, PRIMARY AF ELEMENT, AIR FILTER ELEMENT SAFETY 12 XRB12, GREAVES KOOL 10 LIT
Bharat Sanchar Nigam Limited Portal(bsnl)
Supplying of 1.5 TR Nominal Capacity invertor type Metal body, Installation, Testing and commissioning of of 1.5 TR Inverter type ductable Air cooled split AC unit as per item No.1 above in equipment Room, Providing and Fixing Heavt duty powder coated M S Stand of suitable size made out of suitable guage MS shee, Supply and fixing of 3 core 2.5 sq mm control cum transmission wiring and AC power supply cable of shielded Copper conductor for looping between indoor and outdoor, Supply and fixing of 4 core 1.5 sq mm control cum transmission wiring and AC power supply cable of shielded Copper conductor for looping between indoor and outdoor, Supply Installation testing and commissioning including vaccumiazation and Nitrogen testing of, Supply Installation testing and commissioning including vaccumiazation and Nitrogen, Supplying and Fixing of 25 mm sizes of rigid UPVC piping from outlet socket of AC unit complete with elbow, Supplying and fixing DP sheet steel enclosure on surface or recess along with 25 or 32 A 230 V C curve DP MCB, Supplying and fixing 5 amps to 32 amps rating, 240 or 415 volts C curve miniature circuit breaker suitable for inductive load of Single pole and neutral, Providing and Fixing supply air grills of Powder coated Aluminum construction having a free area of not less than 70 percent without volume control dampers, Supplying and installing of 150 mm width 50 mm depth 1.6 mm thickness nominal size of perforated Hot Dipped Galvanised Iron cable tray
Ntpc Limited
GLAND ROPE-100264730_ ITEM_ 10_ M0540863329, ITEM_ 20_ M0540151255, ITEM_ 30_ M0540753323
Mahanadi Coalfields Limited
ORING_Part no_CHS0102055, ORING_Part no_CHS0302434, ORING_Part no_781PH61629, ORING_Part no_136BR61251, HOSE_Part no_CHH3301023, HOSE_Part no_156PM90734, HOSE ASSY_Part no_157PH02217, PIPE ASSY_Part no_157PH02177, HOSE_Part no_157PH02185, HOSE_Part no_157PH02193, HOSE ASSY_Part no_782PH93517, HOSE ASSY_Part no_782PH93509, HOSE 782PH95389_Part no_782PH95389, HOSE_Part no_727101460, HOSE_Part no_31Z1280196, HOSE_Part no_31Z1280188, HOSE_Part no_31Z7100264, HOSE_Part no_160EC61105, HOSE_Part no_160EC61113, HOSE KIT_Part no_157PHB0012, HOSE KIT_Part no_157PHB0029, HOSE_Part no_30Z6180489
Assam Rifles
Tab Liv 52, Tab Doxycycline with Lactic Acid Bacillus 300mg
Panchayati Raj Department Uttar Pradesh
Border Security Force (bsf)
School Education Portal
Tool Kit of Agriculture Skill for 04 Level T and E (HSSPP, Haryana) (Q3) (3 (3 ))
Latur Zilla Parishad
Indian Army
Turmeric Powder, Coriander Powder, Chili Powder, Cardamom, Cumin, Black Pepper, Cloves, Cinnamon, Bay leaf, Chicken Masala, Biryani Masala, Garam Masala, Sabji Masala, Paneer Masala
E-municipalities - Eservices To Citizens And Employees Of
Across all 1,675 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.