Loading…
Loading…
6,231 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
6,231 results • Latest
Local Self Government Department Kerala
Indian Army
Veg Bowl Gold Line heavy Logo, Donga with Lid gold line heavy with Logo, Soup Bowl with Gold Line Heavy Logo, Soup Spoon with Gold Line heavy with Logo, Serving Spoon
Indian Army
Multilayered Cross Laminated Sheets/Tarpaulins/Covers Agricultural Films conforming to 14611 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7151817 Dated : 26-01-2026 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Mod Sectt Establishment
VIP CAMP CHAIR, MEDIUM CAMP CHAIR, SMALL CAMP CHAIR
Indian Army
Multilayered Cross Laminated Sheets/Tarpaulins/Covers Agricultural Films conforming to 14611 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7151815 Dated : 26-01-2026 Bid Document 1/5 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
SPARK PLUG, CLUTCH MASTER CYL, BREAK PAD, PROPELLER SHAFT, WEATHER STRIP W-STRIP BACK WINDOW SIDE, DOOR LOCK ASSY RH, CASE OIL SEAL, FLANGE, SPIDER BRG, SHOCK ABSORBER FRONT, CLUTCH BOOSTER DIA 70, SPEDOMETER CABLE, FAN BELT, NUT WHEEL 14MM, BEARING, DOOR RUBBER BEADING
Indian Army
CLUTCH PLATE, PRESSERE PLATE, UNIVERSAL JOINT, MOTOR ASSY STARTING, ASSY OUTER HANDLE LH
Indian Army
White Board 3x4 ft, Acrylic Box for Training Model, USB Ports for TADIDS, Green and Red Pointer, CGI Sheet, Iron Pipe 2x2 inch, Steel Pointer, Display System, Case Collector, Plotter Roll
Indian Army
Desert Spoon SS Heavy, AP Fork SS Heavy, Cup and Saucer Gold Line Heavy with Logo, Digital Display Standy unit 43 inch, Digital Display Standy Unit 55 inch
National Rural Health Mission (nrhm)
Employees State Insurance Corporation
Surgical Sutures (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7151703 Dated : 26-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Institute Of Technology (iit)
Indian Army
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4), Writing Pens (Q4), Paper Clips (V2) Conforming to IS 5650 (Q4), pin cushions (Q4), Markers and Highlighters (Q4), Glue Stick (V3) (Q4), Metric Scale (V2) Conforming to IS 1480 (Q4), Black Lead Pencils (V3) Conforming to IS 1375 (Q4), Eraser (V2) (Q4), Register (V2) (Q4)
Central Railway
Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7151754 Dated : 26-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Andrew Yule And Company Limited
ELECTRODE S. S, 5 MM, AWS CODE: E308L-16
Dg Of Defence Estate
ACSFP STORESACSFP-ST-03-2015-16, ACSFP STORESACSFP- ST-06-2015-16, ACSFP STORES499151124200, ACSFP STORESACE-C0F010620100, ACSFP STORESMH-39550162
Western Coalfields Limited
Western Coalfields Limited
Western Coalfields Limited
Indian Coast Guard
Indian Coast Guard
Ayush Department
South Eastern Coalfields Limited
LV Ring Collector, Part No. - 100J3895F5 or Equipment
South Eastern Coalfields Limited
6 INCH Thermoplastic Polyurethane(TPU) Lay Flat Hose, LDHC 6 INCH hose coupling, 8 INCH Thermoplastic Polyurethane(TPU) Lay Flat Hose, LDHC 8 INCH hose coupling
Bharat Sanchar Nigam Limited Portal(bsnl)
Basic Education Department Uttar Pradesh
Ministry Of Panchayati Raj
Plain Copier Paper (V3) ISI Marked to IS 14490 (Q4) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7151066 Dated : 26-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Ministry Of Ayush
High Performance Liquid Chromatography (HPLC) System (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid Number : GEM/2026/B/7143248 Dated : 26-01-2026 Bid Document 1/11 Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 120000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : RO CARIHD BHUBANESWAR, NA, N/A, Ministry of AYUSH (Purnendu Panda)
Ministry Of Ayush
High quality water purification system (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 6 Bid Number : GEM/2026/B/7145768 Dated : 26-01-2026 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : RO(AY.) CARIHD BHUBANESWAR, NA, N/A, Ministry of AYUSH (Purnendu Panda)
Ministry Of Ayush
Rotary Microtome (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7144648 Dated : 26-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 50000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : RO(AY.) CARIHD BHUBANESWAR, NA, N/A, Ministry of AYUSH (Purnendu Panda)
Ministry Of Ayush
water baths (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2026/B/7146049 Dated : 26-01-2026 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Bharat Sanchar Nigam Limited Portal(bsnl)
Ministry Of Cooperation
Microwave Ovens For Household And Similar Purposes As Per Is 11676 (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 10 Bid Number : GEM/2026/B/7151227 Dated : 26-01-2026 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Indian Army
Ministry Of Ayush
Stereo Microscope (V1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7145034 Dated : 26-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 35000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ro CARIHD BHUBANESWAR, NA, N/A, Ministry of AYUSH (Purnendu Panda)
Ministry Of Ayush
Ulra Violet (UV) Cabinet for Sterilization (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2026/B/7138083 Dated : 26-01-2026 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Across all 6,231 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.