Loading…
Loading…
11,376 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
11,376 results • Latest
Food Corporation Of India (fci)
District Health Society Girsomnath
Delhi Metro Rail Corporation Limited
North Western Railway
Directorate Of Purchase And Stores
Rashtriya Chemicals And Fertilizers Limited (rcf)
Damodar Valley Corporation
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Deputation of service Engineer of M/s Hayward Tylor (OEM) for Technical Supervision of Boiler Circulating Pump for overhauling of U#2 and servicing of pum..
Chennai Petroleum Corporation Limited
C17M260039 4899981404 PACKING FOR 12" 1500# VALVE, MATERIAL: GRAPHITE POS: 21, DRG. NO: 02091406DP, REV-4,, DRG. NO: 02091408DP, REV-4, MAKE:, 21, DRG. NO: 02091414DP, REV-4, MA
Western Coalfields Limited
National Fertilizers Limited (nfl)
Mishra Dhatu Nigam Limited (midhani)
WHF LIFTING CYLINDER PARKER, WHF TRAVELLING CYLINDER PARKER, WHF DOOR CYLINDER PARKER, WHF CHARGING MACHINE CYLINDER PARKER
Armoured Vehicles Nigam Limited
National Fertilizers Limited (nfl)
Southern Railway
Basic Education Department Uttar Pradesh
Desk and Bench Set for Classroom/Training Area (Q2), Composite Office Tables conforming To Is 8126 (V2) (Q2), Revolving Chair (V5) (Q2) (3 (3 ))
Troop Comforts Limited
Indian Oil Corporation Limited
BID SCHEDULE 1 8490605714 TERMINALS, FUSED TB'S, BID SCHEDULE 2 8415901323 TERMINAL BLOCK NUMBER MARKING
Rourkela Steel Plant
NOZZLE, DWN: RS-4.01. 036, DUST SUPPR SYSTEM, DWN: RS-4.01. 038
Food Corporation Of India (fci)
Metro Railway Kolkata
Nuclear Power Corporation Of India Limited
Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 52 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 4 kg up to 16 kg as per Part B scope of work for further detail refer sco.., Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 53 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 16 kg up to 48 kg as per Part B scope of work for further detail refer sc.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 54 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 48 kg up to 96 kg as per Part-B scope of work for further detail refer sc.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 55 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 96 kg up to 192 kg as per Part B scope of work for further detail refer s.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 56 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 192 kg up to 378 kg as per Part B scope of work for further detail refer .., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 57 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 378 kg up to 500 kg as per Part B scope of work for further detail refer .., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 58 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 500 kg up to 1000 kg as per Part B scope of work for further detail refer.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 59 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1000 kg up to 1500 kg as per Part B scope of work for further detail refe.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 60 Dynamic balancing of rotor with 2 point 5 microns accuracy size more than 1500 kg up to 3000 kg as per Part B scope of work for further detail refe.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 61 Supply and installation of terminal plate by terminal studs with insulators One quantity includes terminal studs for all three phases size up to 1 .., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 62 Supply and installation of terminal plate by terminal studs with insulators One quantity includes terminal studs for all three phases size more tha.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 63 Supply and installation of terminal plate by terminal studs with insulators One quantity includes terminal studs for all three phases size more tha.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 64 Supply and installation of terminal plate by terminal studs with insulators One quantity includes terminal studs for all three phases size more tha.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 65 Supply and installation of terminal plate by terminal studs with insulators One quantity includes terminal studs for all three phases size more tha.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 66 Supply and installation of terminal plate by terminal studs with insulators One quantity includes terminal studs for all three phases size, and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 67 Removing of shaft making of new shaft and refitting of shaft with key way Material used shall be same as original and material is in contractor sco.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 68 Removing of shaft making of new shaft and refitting of shaft with key way Material used shall be same as original and material is in contractor sco.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 69 Removing of shaft making of new shaft and refitting of shaft with key way Material used shall be same as original and material is in contractor sco.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 70 Removing of shaft making of new shaft and refitting of shaft with key way Material used shall be same as original and material is in contractor sco.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 71 Making of end cover including machining drilling and threading etc to size up to 1 point 5 kW Material cast iron for above end cover is in contract.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 72 Making of end cover including machining drilling and threading etc to size more than 1 point 5kW up to 7 point 5 kW Material cast iron for above en.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 73 Making of end cover including machining drilling and threading etc to size more than 7 point 5kW up to 15kW Material cast iron for above end cover .., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 74 Making of end cover including machining drilling and threading etc to size more than 15kW up to 45kW Material cast iron for above end cover is in c.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 75 Making of end cover including machining drilling and threading etc to size more than 45kW up to 90kW Material cast iron for above end cover is in c.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 76 Making of end cover including machining drilling and threading etc to size more than 90kW up to 180kW Material cast iron for above end cover is in .., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 77 Making of cooling fan including machining keyway and key hub Excluding material size up to 1 point 5 kW as per Part B scope of work for further det.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 78 Making of cooling fan including machining keyway and key hub Excluding material size more than 1 point 5kW up to 7 point 5 kW as per Part B scope o.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 79 Making of cooling fan including machining keyway and key hub Excluding material size more than 7 point 5kW up to 15kW as per Part B scope of work f.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 80 Making of cooling fan including machining keyway and key hub Excluding material size more than 15kW up to 45kW as per Part B scope of work for furt.., and Installation of Plant/Systems/Equipments (Version 2) -, and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 82 Making of cooling fan including machining keyway and key hub Excluding material size more than 90kW up to 180kW as per Part B scope of work for fur.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 83 Material cost iron for making of cooling fan end cover as per Part B scope of work for further detail refer scope of work and BOQ attached Total qu.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 84 Providing and fixing of bearing plates with material Same as original size up to 1 point 5 kW as per Part B scope of work for further detail refer .., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 85 Providing and fixing of bearing plates with material Same as original size more than 1 point 5kW up to 7 point 5 kW as per Part B scope of work for.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 86 Providing and fixing of bearing plates with material Same as original size more than 7 point 5kW up to 15kW as per Part B scope of work for further.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 87 Providing and fixing of bearing plates with material Same as original size more than 15Kw up to 45kW as per Part B scope of work for further detail.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 88 Providing and fixing of bearing plates with material Same as original size more than 45kW up to 90kW as per Part B scope of work for further detail.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 89 Providing and fixing of bearing plates with material Same as original size more than 90kW up to 180kW as per Part B scope of work for further detai.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 90 Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size up to 15kW as per Part B scope of work.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 91 Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 15kW up to 45kW as per Part .., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 92 Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 45kW up to 90kW as per Part .., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 93 Providing and fixing of bearing locks duly machined threaded and drilled with material Same as original size more than 90kW to 180kW as per Part B .., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 94 Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size up to 1 point 5 k.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 95 Providing and fixing of foundation legs including machining drilling and levelling etc Material shall, and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 96 Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 7 point.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 97 Providing and fixing of foundation legs including machining drilling and levelling etc Material shall be in contractor scope size more than 15 up t.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 98 Dismantling and refitting without varnish and baking size up to 1 point 5 kW as per Part B scope of work for further detail refer scope of work and.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 99 Dismantling and refitting without varnish and baking size more than 1 point 5kW up to 7 point 5kW as per Part B scope of work for further detail re.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 100 Dismantling and refitting without varnish and baking size more than 7 point 5kW up to 15kW as per Part B scope of work for further detail refer sc.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 101 Dismantling and refitting without varnish and baking size more than 15kW up to 45kW as per Part B scope of work for further detail refer scope of .., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 102 Dismantling and refitting without varnish and baking size more than 45kW up to 90kW as per Part B scope of work for further detail refer scope of .., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 103 Dismantling and refitting without varnish and baking size more than 90kW up to 180kW as per Part B scope of work for further detail refer scope of.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 104 Dismantling and refitting with varnish and baking size up to 1 point 5 kW as per Part B scope of work for further detail refer scope of work and B.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 105 Dismantling and refitting with varnish and baking size more than 1 point 5kW up to 7 point 5kW as per Part B scope of work for further detail refe.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 106 Dismantling and refitting with varnish and baking size more than 7 point 5kW up to 15kW as per Part B scope of work for further detail refer scope.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 107 Dismantling and refitting with varnish and baking size more than 15kW up to 45kW as per Part B scope of work for further detail refer scope of wor.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 108 Dismantling and refitting with varnish and baking size more than 45kW up to 90kW as per Part B scope of work for further detail refer scope of wor.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 109 Dismantling and refitting with varnish and baking size more than 90kW up to 180kW as per Part B scope of work for further detail refer scope of wo.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 110 Providing and Fixing of oil seal size, and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 111 Providing and Fixing of oil seal size 1 point 1 kW to 2 point 2 kW as per Part B scope of work for further detail refer scope of work and BOQ atta.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 112 Providing and Fixing of oil seal size more than 2 point 2 kW up to 5 point 5 kW as per Part B scope of work for further detail refer scope of work.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 113 Providing and Fixing of oil seal size more than 5 point 5 kW up to 15 kW as per Part B scope of work for further detail refer scope of work and BO.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 114 Providing and Fixing of oil seal size more than 15kW up to 30kW as per Part B scope of work for further detail refer scope of work and BOQ attache.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 115 Providing and Fixing of Space Heater size More than 30 up to 45kW as per Part B scope of work for further detail refer scope of work and BOQ attac.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 116 Providing and Fixing of Space Heater size More than 45kW up to 90kW as per Part B scope of work for further detail refer scope of work and BOQ att.., and Installation of Plant Systems/Equipments (Version 2) - RAPP-7 and 8; Cart 117 Providing and Fixing of Space Heater size More than 90kW up to 180kW as per Part B scope of work for further detail refer scope of work and BOQ at.., and Installation of Plant/Systems/Equipments (Version 2) - RAPP- 7 and 8; Cart 118 Providing of SKF make Bearing 6203 ZZ as per Part B scope of work for further detail refer scope of work and BOQ attached
Mahanadi Coalfields Limited
Uttar Pradesh Power Corporation Limited (uppcl)
Indian Space Research Organization
Video Recorder for CCTV System (V2) (Q2), Surveillance Hard disk (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Indian Army
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Repair, Servicing & Maint of Desert Cooler; Repair, Servicing & Maint of Desert Cooler; Service Provider
Hindustan Petroleum Corporation Ltd
Rural Development And Panchayat Raj Department
Meja Urja Nigamplimited
M8559840011, 63A, 415V, 5PIN, WELDING RECEPTACLE UNIT, M8548030963, Lighting Panel
Food Corporation Of India (fci)
Ntpc Limited
Indian Space Research Organization
Accountant General, Jammu And Kashmir
Mishra Dhatu Nigam Limited (midhani)
Border Road Organisation
Panchayati Raj Department
Indian Air Force
Hindustan Copper Limited
Total Security License for Standalone PCs having Antivirus, Email Protection, IDS/IPS Protection, Fi
South Eastern Coalfields Limited
Northern Railway
Durgapur Steel Plant
BIG PAWL WITH BUSH FOR 220 KV CGL GCB, SMALL PAWL WITH BUSH FOR 220 KV CGL GCB, TORSION SPRING FOR BIG PAWL FOR 220 KV, TORSION SPRING FOR SMALL PAWL FOR 220 KV, SPRING TRPLH TORSION FOR 220 KV CGL GC, 145 TRIGGER ASSEMBLY FOR 220 KV CGL GCB, CLOSING LATCH M C FOR 220 KV CGL GCB, TRIGER FOR 220 KV CGL GCB, SPRING TRIG TORSION F 220 KV CGL GCB, GREASE DARINA MOLYKOTE G 0102, GAS DENSITY SWITCH 220KV CGL GCB, GAS PRESSSURE GAUGE 220KV CGL GCB
Jammu And Kashmir Police
Indian Army
Electric Bulb Account Issue Register (FS Size, 200 pages)
Across all 11,376 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.