Loading…
Loading…
32,349 live and archived tenders were published on this date.
Adding a sidebar filter continues in Live Tenders while preserving this publication date.
32,349 results • Latest
AMRELI DISTRICT PANCHAYAT
Department of Posts
Tamil Nadu Postal Circle Department of Posts
Irrigation and Flood Control Department Delhi
Central Board of Direct Taxes (CBDT)
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (20% Balance Work) at Rengakathera & 40 KL capacities & staging 12 mt. (65% Balance Work) at Karmotaincluding providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia UPVC class 06/10 kg/sqcm Pipe, 63/75 mm dia HDPE class 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Rengakathera, Karmota, Dewarsur Block Mohla DISTRICT- Mohla-Manpur-A.Chowki
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 15 mt. (85% Balance Work) at Sherpar & 40 KL capacities & staging 12 mt. (65% Balance Work) at Kakaipar including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia UPVC class 06/10 kg/sqcm Pipe, 63/75 mm dia HDPE class 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Chapatola, Sherpar, Kakaipar Block Mohla District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (65% Balance Work) at Jobtola, 40 KL capacities & staging 12 mt. (20% Balance Work) at Bodal & 40 KL capacities & staging 12 mt. (65% Balance Work) at Kumhali including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission For Village Bodal, Jobtola, Dangarh, Kumhali Block Mohla District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 15 mt. (100% Balance Work) at Munjal, 50 KL capacities & staging 12 mt. (16% Balance Work) at jhitiya & 40 KL capacities & staging 12 mt. (65% Balance Work) at Khadkhadi including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia UPVC class 06/10 kg/sqcm Pipe, 63/75 mm dia HDPE class 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Munjal, jhitiya, Khadkhadi Block A.Chowki District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 15 mt. (100% Balance Work) including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06 kg/sqcm Pipe, 63 mm dia HDPE class 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Katulwahi Block A.Chowki District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 3 Nos. (40 KL capacities & staging 12 mt. (25% Balance Work)) respectively Khairi, Pangari & Manjhitola including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Khairi, Pangari, Manjhitola Block A.Chowki District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (35% Balance Work) at Kaneli including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia UPVC class 06/10 kg/sqcm Pipe, 63/75 mm dia HDPE class 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Kaneli, korkotti, Hanaikalkal Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (65% Balance Work)including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia UPVC class 06/10 kg/sqcm Pipe, 63/75 mm dia HDPE class 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Gotulmunda Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Supplying & Installation of Energy efficiant five star BEE rating ISI Marked required capacity of Three Phase submersible pump inclunding Electric connection from CSPDCL, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Bhalapur Block Mohla District- Mohla-Manpur-A.Chowki.
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 60 KL capacities & staging 12 mt. (20% Balance Work) at Khadgaon and 40 KL capacities & staging 15 mt. (35% Balance Work) at Bhatgaon including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission For Village Khadgon Bhatgaon Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 50 KL capacities & staging 12 mt. (20% Balance Work) at Chawela and 50 KL capacities & staging 12 mt. (65% Balance Work) at Fulkodo including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission For Village Chawela, Salhe, Fulkodo Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (20% Balance Work), 40 KL capacities & staging 15 mt. (20% Balance Work) 50 KL capacities & staging 12 mt. (20% Balance Work) at Kahgaon including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission For Village Bharritola, Iragaon, Kahgaon Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (Balance Work 15%) including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 80 mm dia C.I. Pipe with suitable joints, valve specials and all fittings including all allied civil works including Supplying & Installation of Energy efficient ISI Marked required capacity single phase, 50 Hz, 220V, deep well submersible pump Stainless Steel body, suitable for 4"/6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, SS/Nylon wire rope connection cable including, installation of 01 no. electro chlorinator, providing functional household tap connection (F.H.T.C) in individual households and government institution & etc complete with 03 months trial run, operation & maintenance for 06 months under Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission For Village Sonesarar Block Dongargaon District- Rajnandgaon.
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (85% Balance Work) including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Khursekhurd Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (85% Balance Work) including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Paraljhari Block Manpur District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 15 mt. (100% Balance Work) at Khursitkul, 40 KL capacities & staging 14 mt. (100% Balance Work) at Parsatola including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Khursitikul Block A.Chowki District- Mohla-Manpur-A.Chowki .
Public Health Engineering Department (PHED)
Balance Work of Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 40 KL capacities & staging 12 mt. (35% Balance Work) at Markatola including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber & Providing, laying, jointing, interconnection, testing and commissioning of 90/110 mm dia UPVC class 06/10 kg/sqcm Pipe, 63/75 mm dia HDPE 06 kg/sqcm Pipe with suitable joints, valve specials and all fittings including all allied civil works, including Electric connection from CSPDCL, Road Cutting, Switch room cum pump House, Information Board, construction of boundary wall around the over head tank, installation of electro chlorinator, construction of chlorinator room, providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with 03 months trial run, operation & maintenance for 06 months under Single Village of Piped Water Supply Scheme under Jal Jeevan Mission For Village Markatola, Dhanegaon Block Mohla District- Mohla-Manpur-A.Chowki .
South Coast Railway
WATER RESOURCE DEPARTMENT
Directorate Of Health Services
North Maharashtra University Jalgaon
Gujarat State Electricity Corporation Limited
Gujarat State Electricity Corporation Limited
Thane Municipal Corporation Thane
Gujarat State Electricity Corporation Limited
RDD-CEO-SANGLI
PROVIDING 400 NUMBERS OF TAP CONNECTION AT AITAWDE KH. TAL WALWA DIST SANGLI
Thane Municipal Corporation Thane
Municipal Corporation of Greater Mumbai
Gujarat State Electricity Corporation Limited
RDD-CEO-NASHIK
Providing And Supplying Khadikaran And Cement Road Matrials At Krushngaon To Fofashi Shiv Road GP Krushngaon Tal Dindori Dist Nashik
Zilla Parishad
Department of MSME And Export Promotion
Zilla Parishad
U.P. Cooperative Federation Limited
Gujarat Energy Transmission Corporation Limited
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Zilla Parishad
Across all 32,349 tenders published on this date. Statuses reflect the latest available updates; check each tender for its current deadline.
A tender can cover more than one state. Group counts may overlap.