Loading…
Loading…
3,959 results • Latest
Reconstruction of Changsua golf resort to Gotonga K.B. Road connecting road from Ch. 0.00 m to Ch. 4800.00 m of Golaghat District (Dergaon LAC) under Bokakhat and Dergaon Territorial Road Division for the year 2026-27
Construction of Road from NH-37 to 2 No Parghat (from Ch. 0.00 m to Ch. 880.00 m) under SOPD-G for the year 2026-27 under Bokakhat and Dergaon Territorial Road Division, Bokakhat
Construction of Assam type workshop at 1st company Hqrs. of SDRF Bn at Lilabari in Lakhimpur district
Construction of Assam type workshop at Goalpara F and ES Station
Construction of Assam Type Workshop at 2nd Company Hqrs of SDRF Bn at Kathal in Cachar district
Improvement of Madhupur Rudreswar Bye Lane No 1, Bye Lane No 2, Byelane No 3 including its Sub Byelane and Bye Lane No 4 including its Sub Bye Lane at North Guwahati under SOPD(G) for the year 2025-26.
Supply of OMR sheets, Scanning of used OMR along with result processing
Tea Garden School
Construction of Lachit Bagh Hazarika Path to Sivcharan Boro Path, Sawkuchi, Lokhra (From Ch0.00m to Ch 190.00m)under SOPD(G) for the year 2025-26 (Providing Load Bearing Drain, Cleaning, E/w in Core and subgrade Soil, GSB, WBM-III and ICBP etc)
Resectioning and Regrading of the Kollong River from Namgaon to Misa Centre for augmentation of Flow Capacity (Phase-I). Package No. 1
Handling ofFoodgrains at Haiborgaon
Construction of RCC Hostel for students at Digboi.
Supply of 132/33kV 50MVA Power Transformers and Related Services from original equipment manufacturer for Nalkata (1 No.), Dhemaji (1 No.), Rupai (1 No.), Margherita (2 Nos.) and Tinsukia (3 nos.) Substations of AEGCL Package-T2 Total 8 No
Supply of 132/33kV 50MVA Power Transformers and Related Services from original equipment manufacturer for APM (2 Nos) Bilasipara (1 No) Hatsingimari (2 Nos) and Barpeta (2 Nos.) Substations of AEGCL Package-T1 Total 7 Nos
Water Supply project at District Jail,Diphu, Karbi Anglong
Improvement of Water distribution network at Sidli-Chirang Block (ID-1025, Activity Code - 126153680)
Construction of Bamungaon Duttaipur VCDC Office Building at Bamungaon under 6th ASFC for the year 2021-22 during 2025-26
Construction of market Shed at Sundari Bazar under Sundari VCDC under 6th ASFC for the year 2021-22 during 2025-26
Anti Erosion (A/E) measures at different reaches at Harizon Basti (Kadamtala) area from River Kawadanga on its R/B for the year 2025-26.
Construction of 33 KV Bay at Ajanta Bypass 33/11 KV DSS and replacement of 33 KV Feeder Autorecloser with and Outdoor VCB and Extension of Control Room Building for installation of C R Panels under Jorhat ESD-III of Jorhat Electrical Circle
1.Shifting and Conversion of existing 33 KV Overhead Sepon and Demow Feeder to underground Cable line for 33 KV Bay extension at 132/33 KV Moran GSS under Moran ESD 2.Construction of 33 KV MVCC line from Moran 132/33KV GSS TO Moran OIL
Recovery and Reconstruction of Kutnikuchi road under NDRF (PDNA-2022) for the year 2025-26.
1. Temporary Restoration of flood damaged road from Milon Bazar to No.1 Oxiguri Dwikorguri village via Gwmwbil village in Chirang District by providing GWC under SOPD-G for the year 2025-26 2. Temporary Restoration of flood damaged road...TN_393
Recovery and Reconstruction of Solmara to Dakhin Bhojkuchi road (PMGSY) Package No. AS-20-171 under NDRF (PDNA -2022) for the year 2025-26.
Construction of approach road from Chowkigate to Satsang Vihar Utsav Vanue at Nizsindurighopa including repairing of Chowkigate flyover service road under SOPD G for the year 2025-26
DPRD/BTC/6th ASFC/DG/XII/Udl-24/2026/7
Supply of a Backhoe Loader(CEV Stage V) 6 in 1 bucket under 15th FC 1st and 2nd installment of tied grant for the year 2025-26
Supply of 4000LTR Vehicle Mounted cesspool Emptier under 15th FC 1st and 2nd installment of tied grant for the year 2024-25
Construction of Bridge in Golaghat District i) Br. No. 2/1 on Mokronghabi to 2 No. Bosagaon connecting Road
Construction of Bridge in Dibrugarh District i) Br. No. 1/3 on Rangamati Boroline to Sealkati Dhubiline
Construction of Bridge in Tinsukia District i) Br. on Pavojan Road
Construction of Bridge in Jorhat District i) Br No 8/1 Borbaruah Ali to Dhodar Ali E and D Dyke
Construction of Bridge in Dibrugarh District i) Br. No. 2/1 on Sessa Koch-1 to Sessa Koch 2 Road
Construction of Bridge in Sivasagar District i) Br. 2/1 On Santak to Bamunpukhuri
Construction of Bridge in Sivasagar District i) Br No. 2/1 on Borali to Nazira Ali (Bahgarh)
Construction of Bridge in Sivasagar District i) Br No. 2/1 on Lakhmonighat Road
Construction of Bridge in Tinsukia District i) Br. No. 1/1 on NH 153 to Paharpur Road
Construction of Bridge in Golaghat District i) Br. No.1/1 on Nak Kati to Goshai Chapori Connecting Road
SUPPLY OF PANCHAKARMA EQUIPMENT FOR 3 NOS. OF AYUSH WINGS
Advancing term loan from intending Financial Institution to meet expenditure for (a) 24 MW KLM-II Hydro Project, APGCL. (b) Spillover Amount For 120 MW LKHEP, APGCL. (c) Renovation and Modernization (RandM) of 100 MW NRPP located at Namrup, Assam.
Advancing term loan from intending Financial Institution to meet capital expenditure against setting up of 1500 MW Pump Storage Power Project of APGCL.
Advancing term loan from intending Financial Institution to meet capital expenditure against setting up of 90.5 MW Small Hydro Electric Project at different location of Assam.
Improvement / Construction of Front side Garden including boundary wall, drain, fountain etc. at C.S. Residence, IAS Colony, Khanapara
Karbi Anglong20/Construction of Bridge in Karbi Anglong District,Br No 1/1 on DS road to Bheta Gaon
Providing Eco Friendly Termite Treated Spilt Bamboo wall ,Plantation of Flower and Fruits Trees including Lawn Grass etc at Chief Secretary Residence, IAS Colony, Khanapara Guwahati 22
MMPPNA_RIDF_XXXI_25_26_306 Construction of (1) Kacharichuk Ali from Ch. 0.00 m to Ch. 1200.00 m (L-1.20 km) (2) Bhulaguri Borchapori Road from Ch. 0.00 m to Ch. 1200.00 m (L-1.20 km) (3) Koiri Bosti Ali from Ch. 0.00 m to Ch. 1200.00 m (L-1.20 km)
INSPECTION , LOAD TESTING AND CERTIFICATION OF LIFTING MACHINES/HOISTS/TOOLS AT 500 TPD METHANOL PLANTOF ASSAM PETRO-CHEMICALS LIMITED
Recovery and Reconstruction of Ghagrapar Tamulpur Road to Panmajkuchi Road under NDRF (PDNA-2022) for the year 2025-26.
Supply and Installation of Laptop Desktop and peripherals
SOPD_G_25_26_63 Restoration of JEC Road (L-3.48Km,from Ch.0.00m to Ch.3480.0m under Jorhat and Titabor TR Division under SOPD_G for the year 2025-25 in Jorhat LAC