Loading…
Loading…
3,959 results • Latest
Recovery and Reconstruction of Road from Neairgram Fuljan Point (Bagpur Chowrangi) to Gangapur Road (Hatiluma Point) under NDRF (PDNA-2022) for the year 2025-26, P/No.SE/SONAI/NDRF(PDNA-2022)/25-26/15
Recovery and Reconstruction of Bagpur Neairgram Road under NDRF (PDNA-2022) for the year 2025-26, Sonai LAC, P/No.SE/SONAI/NDRF(PDNA-2022)/25-26/5
Recovery and Reconstruction of Road from Neairgram to Ganganagar under NDRF (PDNA-2022) for the year 2025-26 Sonai LAC, P/No.SE/SONAI/NDRF(PDNA-2022)/25-26/4
STBR/SOPD-G/ Patharkandi-02/14 Construction of - (i) Duhalia-Narainpur PMGSY road to Narainpur ward no -08 near Anirudha nath house at Duhalia-Faridkuna G.P., (ii)Anipur PWD road to PMGSY road at Duhalia Pt-IV, (iii)Kazirbazar -Patharkandi road to Na
Repairing and Renovation of Bamungaon High School at Bamungaon in Chirang District, BTC Assam.
Construction of Community Hall at Kamrup District
Construction of Boundary Wall at Kaurbaha Milan High School Baksa
PMC services for Construction of Open Stadium at Amingaon Sports Complex, Kamrup, Assam
DPR preparation for construction of a full fledged Scientific Multifaceted Infrastructure of world class martial Arts Complex At Adingiri tila Guwahati
Design, Supply, Installation, Testing, Commissioning and CMC for 5 years of aggregate capacity of 42 kWp Grid Connected Solar Rooftop PV Power Plants at Brahmaputra Board, Guwahati-29
Solar Powered Cart Mounted Multifunctional Irrigation Scheme including 2 Nos. of manual boring (2 HP) under Barkhetri LAC (5 No. Points) under SOPD-G for the year 2025-26
HIRING OF INSURER FOR INSURANCE OF THE ASSETS OF THE COMPANY
Urban Climate Adaptation Measures Including Underground Retention Tanks, RWH, and Percolation blocks (Construction of source control measures for delaying runoff through underground retention tanks with RWH using modular eco-block arrangement)
Supply of Stationery items for TMCH
Constr5uction of 6 (Six) nos. of BPHU in various districts of Assam under FC-XV Gealth Grants for FY-2021-22 on Turn Key Basis, Gr-I at Biswanath Chariali BPHC in Biswanath District
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 33 KV NEW DILLIGHAT FEEDER EXTENSION AND DEDICATED 33 KV BAY WITH CIRCUIT BREAKER AT NTPS SWITCHYARD, APGCL.
NEW SOLID WASTE MANAGEMENT AND PROCESSING PLANT (MRF and W2C), MARIANI MUNICIPAL BOARD (Phase II)
Construction of RCC Box cell bridge (size 3.00m x 3.00m 3 cells) including approaches at Kakrighola (Kambla Bagan) Kopapara village under Kokrajhar District.
Recovery and Reconstruction of Road from Joragul Bazar Mangalpur to Manipuri Basti Road under NDRF (PDNA-2022) for the year 2025-26 Sonai LAC, P/No.SE/SONAI/NDRF(PDNA-2022)/25-26/14
Recovery and Reconstruction of Road from Bairobi Bazar to Joragul Bazar via Manipuri Basti Ch. 0m to 1800 m under NDRF (PDNA-2022) for the year 2025-26 Sonai LAC, P/No.SE/SONAI/NDRF(PDNA-2022)/25-26/12
Recovery and Reconstruction of Satkarakandi Bagpur Ferry Ghat Road under NDRF(PDNA-2022) for the year 2025-26 Sonai LAC, P/No.SE/SONAI/NDRF(PDNA-2022)/25-26/7
Construction of advanced multidisciplinary computer laboratory for the Department of Computer Science and Technology (BU) at Bodoland University, Kokrajhar.
Construction of Flood Embankment on Right B ank of River Pokoria from Tetliguri to Patekibori.(Ph II)Package No. 01
Construction of Flood Embankment on Right Bank of River Pokoria from Tetliguri to Patekibori. (Ph V)
Recovery and Re Construction of Banekuchi to Mohanbazar road under NDRF (PDNA - 2022) for the year 2025-26.
Construction of Flood Embankment on Right Bank of River Pokoria from Tetliguri to Patekibori.(Ph IV)Package No. 01
Construction of Flood Embankment on Right Bank of River Pokoria from Teteliguri to Patekibori.(Ph I)
Construction of RCC Building Ground Floor for ADCI Office at Chepakhowa Sadiya Dist Tinsukia With future provision of RCC First Floor
Construction of BPHU at Jengraimukh CHC in Majuli District under PM ABHIM for the FY 2025 26 under NHM Assam on Turnkey Basis Group no 6 1 no of Scheme in Majuli District
Construction of BPHU at Guijan PHC in Tinsukia District under PM ABHIM for the FY 2024 25 under NHM, Assam on Turnkey Basis Group no22 1nos. of Scheme in Tinsukia District
Balance work estimate for Construction of Rural Health Block Pulling Complex in Khoirabari CHC, Udalguri
Construction of BPHU at Kakojan BPHC and Titabor BPHC SDCH in Jorhat District under PMABHIM for FY2025 26 under NHM Assam on Turn Key Basis Group no9 2 nos of scheme in Jorhat District
Construction of Buildingless Sub Health Centre at Duhalia SC in Karimganj District under PM ABHIM for FY 2022 23 under NHM Assam on Turnkey Basis
Construction of Buildingless Sub Health Centre at Makum SC in Tinsukia District for FY 2021 22 under PM ABHIM on Turnkey basis
SUPPLY, INSTALLATION AND TESTING OF SS TUBING AND FITTINGS
Construction of Tarun Ram Phukan Smriti Rangamancha at Barpeta under MPLAD scheme
Recovery and Reconstruction of (1) Sariahtoli to NH-31 and 20 other roads under NDRF(PDNA-2022) for the year 2025-26.
Repairing Renovation of 120 Nos of Subcentres to upgrade them as Health and Wellness Centres at various places of Assam of RoP 2021-22 Group-9, 5 nos in Jorhat District
Construction of New Pond in low lying/suitable area and Renovation of Existing Ponds under Development Approach in Fisheries and Aquaculture through Cluster based Initiatives under SOPD 2025-26
Construction of 100 Secondary Schools in 35 Districts of Assam under RIDF-XXXI (2025-26) for Belsor HS School under Nalbari DTBD Package 35
CE/EAP/ARRBP/OCB/Bridge1/Kokrajhar/15 Construction of Bridge in Kokrajhar district i) Br. on Boraguri- Narenguri Road
Construction and upgradation of Bhekuri Chapori Road Cum Embankment L 8.00 Km including road cum embankment from Sesa Tiniali to Laibeel L 2.8 Km by providing ICBP unde SOPD-G for the year 2025-26 of Sivasagar District under Sivasagar Demow TRD
Construction of GWC Road from (1) Tengor Chari Ali to Milonpur via Veronia Camp (L 2.20Km) (2) Tengor Chari Ali to Diffolopathar LP School (L 2.00 Km) under SOPD(G) for the year 2025-26
Re-constn of Drain Cum Footh path, Cross Culvert etc on Hatigaon main Rd Basisthapur Byelane 1 via LNB,Bishnujyoti path,Sijubari charali towards Basistha river under SOPD(G) for Flood Mtg of Hatigaon Area for the year 2024-25. (Rd1200 M, Dr-1500 M)
Supply of Foxtail Millet Seeds under the scheme NFSNM-Nutri Cereal for the year 2025-26.
Supply of Lentil Seeds under the scheme NFSNM-Pulse for the year 2025-26.
Supply of Rajmah Seeds under the scheme NFSNM-Pulse for the year 2025-26.
Supply of Jute Seeds under the scheme NFSNM-Jute and Allied Fiber for the year 2025-26.
Reconstruction and Recovery of Iterbhita Dangarkuchi road under NDRF(PDNA-2022) for the year 2025-26
Reconstruction and Recovery of Neularvita to Satrapaka via Jabrikuchi road under NDRF(PDNA-2022) for the year 2025-26