Loading…
Loading…
2,314 live1,035 closing this weekmost from Chhattisgarh State Industrial Development Corporation (CSIDC) and Urban Administration and Development Department (UADD)
Published at eproc.cgstate.gov.in, Chhattisgarh's official e-procurement portal.
2,314 results • Latest
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-SRG-22(06 work) District-Surguja
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-KRY-KHAD-07 District-Manendragarh-Chirmiri-Bharatpur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-JSP-60(03 work) District-Jashpur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-SRJP-23(05 work) District-Surajpur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-BLP-15(01 work) District-Balrampur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-JDP-29(03 work) District-Bastar
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-NPUR-05(01 work) District-Narayanpur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO C.C Road with Drain Donde to PV 56 yatri Pratikshalay tak District- Kanker
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-KNK-06(03 work) District-Kanker
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-KNK-07(02 work) District-Kanker
NIT 1208 Construction of CC Road Under MMGGPY PKG NO CC Road With DrainBadepara main road se Sairaam Ghar Tak GP Mofalnaar District-Dantewada
Supply, Installation and Maintenance of Pre-fabricated FRP Fencing at Nava Raipur Atal Nagar, Dist. Raipur (CG) (Pilot Project)
राजीव गांधी वार्ड क्र. - 13, जोन क्र. 2, त्रिमूर्ति नगर, फाफाडीह स्थित दया भवन में अतिरिक्त कक्ष का निर्माण कार्य।
Laying and Providing pipe line at various ward of Jagdalpur
Rewinding work of Turbine pump, Open well pump, Centrifugal motor, mono Block pump etc.
Lath work of turbine pump, mono Block pump, Open well pump, Centrifugal pump etc.
Rewinding & Repair work of Submersible pump
Work at valve Spendle, Nut Bolt, Ceck Nut, Pipe Cutting Threading etc.
Construction, Testing and Commissioning of R.C.C. Elevated Service Reservoir of 60 KL capacities & staging 12 mtr. including providing and fixing of CI Double flange pipe, double flange specials & DI double flange soft seated sluice valve including construction of suitable R.C.C. Valve Chamber, Construction of 25 K.L. R.C.C. Sump well & Providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia PVC class 10 kg/sqcm 157 mtr, 90,110 mm dia PVC class 6 kg/sqcm 4mtr, 86mtr, with suitable joints valve specials and all fittings including all allied civil works , Supplying & Installation of Energy efficient five star BEE rating ISI Marked required capacity single phase, 50 Hz, 415V, deep well submersible pump Steel body, suitable for 6" tube well with Control Panel Starter suitable for Submersible pump with dry run protection, single phase preventer, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe connection cable including verification of tubewell yield & Electric connection from CSEB, construction of brick masonry switch room of size 1.2*1.2*2.4 mtr ,construction of boundary wall around the over head tank, installation of 01 no. electro chlorinator , construction of chlorinator room of size 2.4*2.4*3.0 mtr , providing functional household tap connection (F.H.T.C) in individual households and government institution etc. complete with trial run operation & maintenance for 06 months under Single Village of Water Supply Scheme under Jal Jeevan Mission For Village Malidih, Block Arang District – Raipur. (balance work)
CONSTRUCTION OF H.L BRIDGE I/C APPROACH ROAD ACROSS LUCHKI NALLA ON AMBIKAPUR TO DARIMA ROAD
Construction of Multipurpose Hall & Sport Complex at Sariya. i/c W.S.S.F. Electrification & Approach Road Works. Distt. Sarangarh Bilaigarh (Deposit work- without escalation and bonus)
Construction of Chhitapar (Chakla) to Rajpalpur Road Length 1.15 Km. & Bodtara Siltara Main Road to Gadapara Road Length 2.30 Km. (Total Length 3.45 Km)
Construction of New Bus Stand Lormi to Dindol Road Length 1.65 km. & Chikhalda Dinduri Poylari Canal Via Bhakurkapa (Amlidih) Road Length 3.625 km. (Total Length 5.275 Km)
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACHES ACROSS BENDRA NALLA ON SENDBAHRA - JATIYATORA ROAD.
WIDENING & STRENGTHNING OF SHYAM NAGAR-DEORI ROAD( VILLAGE ROAD NO.16),LENGTH 6.25 KM. I/C. CULVERTS AT DISTT. GARIYABAND ( GARIYABAND DN.).
Construction of Guda Post office to Kodawagodan Approach Road Length 5.50 K.M. (Working Length 5.10 K.M.) I/c Bridges & Culverts at Block- Pandariya Distt.- Kawardha (C.G.)
Construction Of High Level Bridge and Approach Road Across Kuru Nalla at KM 23/4 on Jamgaon- Koylanga Road. (MDR)
STRENGTHENING AND UPGRADITION WORK OF KAMESHWARNAGAR-RAMCHANDRAPUR-LURGI ROAD LENGTH K.M. 1 TO 33 AND 44 TO 48 = 38.00 K.M. , DISTT.- BALRAMPUR-RAMANUJGANJ (C.G.) (Work code – W31659)
Construction of “Centre of Excellence” Building at Diet Bastar Block-Bastar i/c Electrification Work & Approach Road ( Deposit Work- Without Bonus and Escalation)
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACHES ACROSS SURHI RIVER ON MOHGAON - BUDHWARA ROAD.
B.T. Renewal of Kawardha Raveli Pratappur Road Length 19.80 K.M. at Distt.- Kawardha (C.G.)
Construction of Jevdankala to Kailash Nagar Road Length 3.40 K.M. including Bridges & Culverts at Block Kawardha (Working Length 2.60 K.M.) Distt.- Kawardha (C.G.)
Construction of PV 15 to PV 124 Road from km. 1/2 To4/10 = 3.90 km i/c Culverts and Bridges.
Construction work of 2 Nos F, 15 Nos G, 20 Nos H& 15 Nos I Type Residential Quarter for Officers & Employees of Civil Court Gariyaband with Approach Road, Drainage Gaurden, Cow Catcher, Overhead Tank, Boundrywall & Electrification at Dist. Gariyaband.(Gariyaband Dn.).
Construction of Raigarh Ektal to Bade Attarmuda Approach Road Length 2.30 Km.
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-BBB-109(01 work) District-Balodabazar-Bhatapara
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-RPR-70 District-Raipur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-RPR-71 (05 Works) District-Raipur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-RPR-72 District-Raipur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-MSD-33 District-Mahasamund
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-RPR-73 District-Raipur
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-MSD- 34(01 work) District-Mahasamund
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-KWD-125(06 work) District-Kabirdham
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-DMT-13(03 work) District-Dhamtari
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-RJN-190 District-Rajnandgaon
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-RJN-191(05 work) District-Rajnandgaon
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-DUR-79(03 work) District-Durg
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-DUR-80(04 work) District-Durg
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-BMR-57(02 work) District-Bemetara
NIT 1208 Construction of CC Road Under MMGGPY PKG NO MMGGPY-MGL-40(07 work) District-Mungeli