Loading…
Loading…
2,330 live1,034 closing this weekmost from Chhattisgarh State Industrial Development Corporation (CSIDC) and Urban Administration and Development Department (UADD)
Published at eproc.cgstate.gov.in, Chhattisgarh's official e-procurement portal.
2,330 results • Latest
1. CONSTRUCTION OF GUMTI TO BE . LENDHRA ROAD AT WARD NO.10 (20 NOS) CONSTRUCTION OF GUMTI TO BE NEAR PANI TANKI AT WARD NO.11 09 (20 NOS)
1 CONSTRUCTION OF GUMTI TO BE BESIDE GAYATRI MANDIR AT WARD NO.09 (10 NOS) 2. CONSTRUCTION OF GUMTI TO BE BUS STAND SARIYA ROAD AT WARD NO.09 (20 NOS)
Renovation of Tar Road from R.D. 38.30 Km to 47.30 Km of Mandhar Branch Canal of Mahanadi Project in Block Dharsiwa/Arang, District Raipur
Construction Work of Irrigation through Stopdam Cum Solar System at Village Mandlore in Block Abhanpur, District Raipur (Only Construction of Stopdam)
Construction of Sandi Anicut across Kolhan Nalla in Block Arang, District Raipur
STRENGTHEINING OF HEADWORK AND C.C. LINING OF CANALS OF DULHARA TANK SCHEME IN KOTA BLOCK OF BILASPUR DISTRICT.
RENOVATION OF HEAD WORK AND CONSTRUCTION OF CHANNEL AND CC LINING WORK MAIN AND MINOR CANAL OF GAGNAI TANK SCHEME.
RENOVATION & REPAIR WORK OF HEAD WORK OF CHOURASIYA TANK SCHEME.
Providing, Supply, fixing & repairing of Signages, Road furniture, Bus stops and other road amenities at various locations of Nava Raipur Atal Nagar, Raipur (C.G.)
“Proposed Fencing (Around Blue Water Lake) at Nakti, Nava Raipur Atal Nagar, Dist. Raipur (CG).”
Weld Mesh Fencing at city Level Roads, Beautification & Upgradation of Existing Infra Work at Various Locations of Nava Raipur Atal Nagar, Dist. Raipur (CG).”
Construction of Office Building for Sub Divisional Office (Revenue) at Bhaiyathan Block Bhaiyathan Distt Surajpur.
Construction of Office Building for Sub Divisional Office (Revenue) at Ramanujnagar Block Ramanujnagar Distt Surajpur.
Construction of Tahsil Office Building at Bhatgaon Block Bhatgaon Distt Surajpur.
Construction of Boundary Wall in Girls Hostel of Government College Manendragarh Distt. MCB (C.G.)
Construction of Fire Station Office Building at Baikunthpur Distt Korea (C.G.)
Construction of Grain Storage Warehouse, Shed and Labour Retaining Wall with Toilet at Agricultural Farm Lohari Block Manendragarh Distt Korea (C.G.)
Nit Schedule For Electrification work at various minister bunglows under vidhan sabha sub division ,Raipur (c.g)
S/R,MOW FOR RESIDENTIAL AND NON RESIDENTAIL BUILDING UNDER SUB DIVISION SARANGARH
S/R, MOW WORK FOR RESIDENTIAL AND NON RESIDENTIAL BUILDINGS UNDER SUB DIVISION BILAIGARH DIVISION SARANGARH-BIALAIGARH
SR WORK OF AMODI-MADWA-PAWANI ROAD (MDR-470 ,IN K.M. 19/4 TO 19/10 = 772.03 M.) AND MOHATARA-MANPASAR RAOD(VR-111, IN KM 1/2 TO 1/8 =402 K.M.) UNDER SUB DIVISON BILAIGARH.
CONSTRUCTION OF CEMENT CONCRETE STRENGTHING WORK ON DINDESWARI MANDIR APPROACH ROAD AT KM 1/2,1/4,1/6&1/8 BLOCK- MASTURI, DIST. BILASPUR (C.G.)
SR WORK ON ACHANAKPALI APPROACH ROAD LENGTH 2.00 K.M. UNDER SUB DIVISION SARANGARH
BT & WMM PATCH REPAIR WORK OF VARIOUS MDR & ODR ROADS OF DIVISION NO. 1, BILASPUR
BT & WMM PATCH REPAIR WORK OF VARIOUS VILLAGE ROADS OF DIVISION NO. 1, BILASPUR (CG)
CHANGE THE AMSL OF AIRSIDE AS PER DATUM DECIDED AT BILASA DEVI KEVAT AIRPORT BILASPUR (C.G.)
वार्ड 46 शर्मा आश्रम मांझी चौक से लेकर प्रियदर्शनी मार्केट बडे़ नाले के ऊपर स्लेब कास्टिंग का कार्य।
वार्ड 40 शंकर नगर सुलभ के पास तेल्हानाला तक आरसीसी बॉक्स कल्वर्ट नाला निर्माण कार्य।
वार्ड 38 परशुराम चौक से बाम्बे इलेक्ट्रिकल तक नाला गहरीकरण कर नाला निर्माण कार्य।
BT PATCH REPAIR REPAIR WORK AT KONI- MOPKA BAYAPAS SUB DIVISION KONI
BT PATCH REPAIR WORK AT MASTURI MALHAR JONDHARA LAWAN, BAKARKUDA MATIYA & VARIOUS ROADS UNDER SUB DIVISION NO 1 BILASPUR
BT PATCH REPAIR WORK AT MASTURI MALHAR JONDHARA LAWAN, BAKARKUDA MATIYA & VARIOUS ROADS UNDER SUB DIVISION NO 1 BILASPUR
MAINTENANCE OF STORE ROOM AND CCR ROOM AT BILASA DEVI KEVAT AIRPORT BILASPUR (C.G.)
WMM ROAD FOR SAPL LIGHT MAINTENANCE AT BILASA DEVI KEVAT AIRPORT BILASPUR (C.G.)
SPECIAL REPAIR OF ROAD AND BRIDGE CULVERT UNDER SUB DIVISION NO.3 BILASPUR AND HIGH COURT SUB DIVISION NO.2 BILASPUR (C.G.)
S/R WORK AT HIGH COURT SUB-DIV-1 & 2, SUB-DIV-3 AND KOTA SUB-DIV. UNDER P.W.D. DIVISION NO.2, BILASPUR (C.G.)
वार्ड 38 में सड़क 5,12,13 एवं 14 में सीमेंटीकरण कार्य।
Providing Electrification work to SR/MOW/OW/Deposit work under PWD EM Sub Division Durg (C.G.)
CONSTRUCTION OF SUB REGISTRAR OFFICE AT BASNA DISTT. MAHASAMUND ( C.G.)
CONSTRUCTION OF SUB REGISTRAR OFFICE BUILDING AT SARAIPALI DISTT. MAHASAMUND (C.G.)
वार्ड 60 सेक्टर 05 सड़क एसपीए एवं सड़क 30 के मध्य उद्यान में प्रकाश व्यवस्था कार्य |
Construction of DTIC Office Building (G+1) Kondagaon, District- Kondagaon (C.G.)
Construction of Chandabeda (Ghotiya Munda to Chhindli Road) inc Bridge & Culverts Length 3.375 Km Work Code W29745 Dist Kondagaon
वार्ड 58 सेक्टर 04 सड़क 33, 34 एवं 35 में पाथवे निर्माण कार्य |
Upgradation work of Muktidham in ward no. 31 Hind Nagar
Repair and maintenance work of Toilets and Urinal in Government school in the Risali Municipal Corporation area.
वार्ड नं 01 में मुक्तिधाम का उन्नयन कार्य
CONSTRUCTION OF SAMUDAYIK BHAVAN AT DINDAYAL APARTMENT, BADE RAMPUR W.N. 08.
Development of Transport Nagar, Silpahri, Bilaspur on Public Private Partnership Mode
CONSTRUCTION OF AUDITORIUM BUILDING AT PATHALGAON DISTT. JASHPUR. (Work code – W31203)