Loading…
Loading…
4,431 results • Latest
CONSTRUCTION OF DRAIN FROM DABI GHAR TO SURESH BAGHEL AT ASPATAL WARD NO. 17 KONDAGAON
CONSTRUCTION OF SAMUDAIK BHAVAN NEAR KRISHNA KUNJ AT KOPABEDA WARD-15, KONDAGAON. (3rd Call)
Construction Extension and Maintenance of Community Building Near Tower Chowk at Ward No. 04 Ratakhar
Construction and Extension of First Floor Building of Chamber of Commerse at Ward No. 03 Saket Nagar.
Revamping of Material Recovery Facility (MRF) including installation of Machinery and construction of Compost Plant in Municipal Areas of Kirodimal Nagar, Chhattisgarh
CONSTRACTION OF SAMUDAYIK BHAVAN FOR RAIGARH PRESS CLUB AT RAIGARH. (3rd Call)
Completion work of incomplete TOWN HALL at ward no 01 of Nagar Palika Balrampur(c.g.)
वार्ड क्र. 44 गोकुल नगर सुलभ के पीछे से बापू नगर पुलिया तक का चैनेलाईजेशन कार्य।
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No. MMGSY-KWD-123 Part-A (01 Road) MMGSY-KWD-123 Part-B (LSB RD 2500 m) , District-Kabirdham
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No. MMGSY-JSP-23 (01 Road) , District-Jashpur
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No. Nawa Ratenga Paripatpara Mukhya Marg To Bade Badrenga , District-Bastar
NIT 1188 Construction& Maintenanc Road Under MMGSVY PKG No. Nahadi To Muler, District-Dantewada
Construction of Community Building for Tribal Pride Society) Gram Panchayat Podidih Janpad Panchayat Khadgawan Block Khadgawan Distt Manendragarh Chirimiri Bharatpur (C.G.)
Construction Work of Bridge Over Canal Near Agrasen Tiraha and C.C. Road From Bridge To DDM Road, Expansion Work of Sunaliya Chowk & C.C. Road Along The Canal Bank From Sunaliya Chowk To Ratakhar Joda Bridge VIA Agrasen Tiraha in Korba (C.G.)
Upgrade of Front & Rare Elevation at State Hangar Mana, Raipur C.G.
Painting & White Washing Work at Circuit House Section Under Sub-Division No.1 Raipur (C.G.)
White Washing, Colour Washing and Distempering Residential & Non-Residential Buildings under Survey Sub-Division, Raipur (C.G.)
उपसंभाग क्र.-1 के अंतर्गत मंत्रालय उपखण्ड में रंगाई पुताई कार्य।
White Washing, Colour Washing, Distempering & Painting Work at College, Girls Polytechnic College Under Maintenance Sub-Division Raipur (C.G.)
WHITE WASHING, COLOUR WASHING, DISTEMPERING & PAINTING WORK AT JILA HOSPITAL KALIBADI SECTION UNDER MAINTENANCE SUB-DIVISION RAIPUR (C.G.)
Supply of Material For Sub Division No.-1, Maintenance Sub-Division & Survey Sub Division Under Division No.-1 Raipur
For S/R Culvert Work Various Road, Sukma Town Road 4.00 Km, Sukma Jhapra Malkangiri Road Length 12.05 Km. Tongpal Pushpal Road Lenght 15.00 Km & Chhindgarh Town Road Length 0.70 Km & H.Q. Sukma Roads Under Sub Division Sukma.
For White Washing, Colour Washing & Painting Work Residential Building & N/R Building Under Sub Division Sukma.
Construction of Rahat Shivir Kendrda at Village Bastanar, Block-Bastanar, Distt-Bastar.
ZONAL WOR(WARD NO. 01 TO 08) AT NAGAR PANCHAYAT DHARAMJAIGARH
वार्ड नं.05 के विभिन्न स्थानों पर नाली पी.सी.सी. रोड निर्माण कार्य (1)वार्ड नं.05 में गेण्ड्रे घर से उत्तम यादव घर तक नाली निर्माण कार्य (2)वार्ड नं.05 में चंद्रिका कोसरिया से सिन्हा सर एवं तरंग गुप्ता के घर तक पी.सी.सी.रोड निर्माण,
वार्ड नं.06 के विभिन्न स्थानों पर नाली पी.सी.सी. रोड निर्माण कार्य (1)वार्ड नं.06 में सुनील पासवान घर से दीपक रामटेके घर तक एवं मुकेश जंघेल घर से राजेश साहू घर तक पी.सी.सी.रोड व नाली निर्माण कार्य (2)वार्ड नं.06 में मुकेश जंघेल घर से राजेश साहू घर तक पी.सी.सी.रोड व नाली निर्माण कार्य
वार्ड नं.04 के विभिन्न स्थानों पर नाली पी.सी.सी. रोड निर्माण कार्य (1)वार्ड नं.04 में नया ढाबा शंकर नगर मुक्तिधाम एवं चुन्नू यादव के घर से मुक्तिधाम तक सी.सी.रोड निर्माण(2)वार्ड नं.04 मे. पुराना ढाबा शिव नगर में पी.सी.सी.रोड व नाली निर्माण,
Construction of Shopping complex at Old CMO Quarter in Ward No. 05
CONSTRUCTION OF RCC DRAIN FROM GULMOHAR COLONY GARDEN TO BELADULA SCHOOL AT W.N. 21
CONSTRUCTION OF RCC DRAIN FROM ATUL DEWANGAN TO Dr. SAHU HOME (KHETPARA) AT W.N. 21
CONSTRUCTION OF RCC DRAIN FROM RAMNIVAS TAKIES TO CSEB OFFICE COMPLEX TO JAGDAMBA ASHRAM NEW MARINE DRIVE AT W.N. 19/20
CONSTRUCTION OF RCC DRAIN AT SIDHIVINAYAK COLONY W.N. 09
वार्ड क्र. 17 कलेक्टर बंगले के पीछे से हण्डी चौक मार्ग तक एवं आगे आलोक सिटी मॉल तक नाला निर्माण कार्य।
CONSTRUCTION OF RCC DRAIN FROM DOODH DAIRY SLRM CENTER TO SANJAY MAIDAN AT W.N. 01
CONSTRUCTION OF R.C.C. DRAIN FROM YAMUNA PATEL HOUSE TO BISEN HOUSE AT WARD NO. 13,14 &15
CONSTRUCTION OF C.C. ROAD FROM MAHILA BHAVAN TO SHIV MANDIR AT WARD NO. 15
CONSTRUCTION OF SANSKRITI MANCH IN MANDI SAMITI AREA OF KRISHI UPAJ MANDI JAIRAMNAGAR- NARGODA (AAWAS PARA), SUKALKAARI( GUDI CHOWK - LOHRABOR), SOTHI (PARSAPALI AREA), KUKDA (DEVRAHA PARA), GRAM PANCHAYAT - JAUNDHARA (SANJAY NAGAR), GATORA ( NEAR BY RATHOR BHAWAN SCHOOL), BAKARKUDA (NEAR HOUSE OF PARMESHWAR MANIKPURI), UDANGI.CONSTRUCTION OF SAMUDAYIK BHAWAN IN GRAM PANCHAYAT TIKAARI (NEAR JAISTAMBH CHOWK BAZAAR MOHALLA), KHAPRI- (O) (BESIDE TRANSFORMER SURYAVANSHI MOHALLA), BINAURI(SATNAM CHOWK NEAR PANKHAATI POND PLATFORM), KEWTADIH - TA (SCHOOL MOHALLA), RAHTATOR(NEAR SATNAMI MOHALLA), KIRARI (NEAR BAKLIBHATA SURYAVANSHI PARA), SUKALKARI(NEAR BY ANGANBADI PURVA MADHYAMIK SCHOOL), BHARARI (NEAR BY SIDDH BABA MANDIR MANIKPURI MOHALLA), NAVAGAON-HA (BAZAAR CHOWK), JAUNDHARA( NEAR ATAL CHOWK NAYA BAZAAR) , DISTT- BILASPUR
Construction of Aspirational Toilet Under SBM 2.0 Near Atal Complex at Ward No. 03
Repairing and Extra Facility works at Dantewada Filter Plant and Intekwell
853-01 MECHNICAL, ELECTRICAL, INSTRUMENT, & OTHER ITEM PURCHASE & AMC SERVICING WORKS THIRD E-TENDER (ONLY MANUFACTURER & AUHTORISED DEALER)
853-03 General AMC Servicing & Fabrication & Civil Works Second E-Tender (Non Authorized)
853-02 General Mechanical Electrical Instrument & Other Items Purchase Third E-Tender (Non Authorized)
Selection of Consulting Firm for Project Design and Management Consultant (PDMC) for Bilaspur Smart City Ltd. under CITIIS 2.0 Program
"Engagement of QCI-NABET Accredited Agency to Conduct Various Environmental and Social Studies and Obtaining Environmental Clearance/Permission/Authorizations for Solid Waste Management Project under CITIIS 2.0 in Bilaspur City"
मेजर ध्यानचंद हॉकी मैदान में खिलाड़ियों के लिए भवन निर्माण कार्य
Supply and Installation of Vertical Turbine Pump Set 30 hp 2 Nos at municipal council champa at ward no 13 ghogharanala champa
ESTIMATE FOR THE PRUPOSED COSTRUCTION WORK OF CC ROAD IN VARIOUS PLACES AT WARD NO. 05 NAGAR PANCHAYAT MANA CAMP • COSTRUCTION WORK OF CC ROAD FROM ROHIT THAKUR TO GHOSH HOUSE & MONU PATEL HOUSE TO MANDIR • COSTRUCTION WORK OF CC ROAD AT THREE PLACES • COSTRUCTION WORK OF CC ROAD FROM PANDIT HOUSE THROUGH UMASHANKAR HOUSE TO RAKESH DAS HOUSE
ESTIMATE FOR THE PRUPOSED COSTRUCTION WORK OF CC ROAD IN VARIOUS PLACES AT WARD NO. 07 NAGAR PANCHAYAT MANA CAMP • COSTRUCTION WORK OF CC ROAD FROM SURANJAN DAS HOUSE TO SUBHAS SAHA HOUSE • COSTRUCTION WORK OF CC ROAD FROM AT THREE PLACES (1) SINHA TO SHABNAM HOUSE (2) PATEL HOUSE TO PANUDAS HOUSE (3) VISHU HALDAR TO KARATI HOUSE • COSTRUCTION WORK OF CC ROAD FROM MAIN ROAD THROUGH RAVI DANCER SIR HOUSE TO MEENU DEVI
ESTIMATE FOR THE PRUPOSED COSTRUCTION WORK OF CC ROAD IN VARIOUS PLACES AT WARD NO. 06 NAGAR PANCHAYAT MANA CAMP • COSTRUCTION WORK OF CC ROAD FROM AJIT SAHA HOUSE TO BIJLI MANDAL • COSTRUCTION WORK OF CC ROAD FROM GENIUS PUBLIC SCHOOL TO SHANKAR SAHA HOUSE • COSTRUCTION WORK OF CC ROAD FROM MAIN ROAD TO DAHARIYA HOUSE