Loading…
Loading…
4,432 results • Latest
उचित मूल्य की दुकान निर्माण कार्य क्र. 03
उचित मूल्य की दुकान निर्माण कार्य क्र. 08
उचित मूल्य की दुकान निर्माण कार्य क्र. 02
Construction / Repair maintenance of Buildings , CC Road , Cement concrete drain , Street Light & pipeline work under Zonal work for 2026-27 all ward all Founds (समस्त मद )
General Maintenance work of Residential and Non Residential Building Under P.W.D. (B/R) Division Bhanupratppur.
White washing, and Distempering of Govt. Residential and Non Residential Building Under P.W.D. (B/R) Sub Division Antagarh.
White washing and Painting of Door Windows on Govt. Residential and Non Residential Building Under P.W.D. (B/R) Sub Division Bhanupratppur.
CONSTRUCTION OF DRAIN NEAR AT VARIOUS STREETS AT WARD NO.15
Small Zonal works up to Rs. 1.50 lakh under various heads. PWD BUILDING SOR 10.06.2026 PWD BUILDING ROAD SOR 15.06.2026 ELECTRICAL SOR 10.06.2026 & PHE SOR 01.06.2020
CONSTRUCTION OF SAMUDAYIK BHAWAN Ward No 11 AT - CHANDKHURI (C.G.)
CONSTRUCTION OF C.C ROAD FOR RUPESH PATEL HOUSE TO PASING THROUGH LEDARI POND TO NEAR KOUSHILYA MATA TEMPLE ADSENA ROAD AT WARD NO 01 = 600M, CONSTRUCTION OF C.C ROAD FOR PAWAN VERMA TO AT MAIN ROAD WARD NO. 10, CONSTRUCTION OF C.C ROAD FOR TAKESHWAR VERMA HOUSE TO FERU HOUSE TO MAIN ROAD WARD NO. 13
Revamping of Material Recovery Facility (MRF) including installation of Machinery and construction of Compost Plant in Municipal Areas of KOTA, Chhattisgarh
कामरेड सुधीर मुखर्जी वार्ड क्र.54 अंतर्गत सांस्कृतिक भवन निर्माण कार्य। ( राज्य प्रवर्तित योजना)
बाबू जगजीवन राम वार्ड क्र.53 अंतर्गत डूमरतराई में दईहान चौक में सांस्कृतिक भवन निर्माण कार्य। ( राज्य प्रवर्तित योजना)
SPECIAL REPAIR WORK OF BRIDGE / CULVERT ON VARIOUS M.D.R. AND VILLAGE ROADS UNDER P.W.D. (B&R) SUB DIVISION PITHORA
Construction of Community building at ward no 02 Rajnandgaon
Construction of CC road and RCC drain at ward 08 Rajnandgaon
Construction of of cover drain, road widening, and pathway construction for Wards No. 06 to 10
Design, Constrcution, erection, testing and commissioning of RCC OHSRs of capacity of 800 KL of 20m staging height capacity (including RCC slab at 3.5 m above GL, Bulk Flow Meter, Sluice Valve & Electrification) with other allied works at TITURDIH Durg at a place designated by Municipal Corpoartion Durg with other allied work and including 12 months Defect Liablity period & Clear Water Pumping Machinery and Pump House.
24 एवं 42 एमएलडी फिल्टर प्लांट में फिल्टर मिडिया प्रदाय एवं फिल्टर चेंबर संधारण कार्य।
मिनीमाता चौंक से पुलगांव नाला तक पाईप लाईन विस्तार कार्य।
Construction of cover drain, road widening, and pathway construction for Wards No. 11 to 15.
महादेव घाट में मूर्ति विसर्जन कार्य एवं कुण्ड की सफाई कराये जाने हेतु क्रेन व्यवस्था कार्य।
Construction of CC roads and RCC drains at various locations in Ward No. 25
Construction of CC roads and RCC drains at various locations in Ward No. 24.
Construction of CC roads and RCC drains at various locations in Ward No. 30
Construction of CC roads and RCC drains at various locations in Ward No.18
Construction of CC roads at various locations in Ward No. 08
CONSTRUCTION OF CC ROAD FROM PURVA PARSHAD VAISALI SHILEDRA HOUSE TO KUMAR GULLY AT WARD NO. 16
Construction of CC roads From Jithkham to Kali Mandir in Ward No. 31
CONSTRUCTION OF CC ROAD FROM LALIT SINGH THAKUR HOME TO KASHI DHRUW HOME, FROM BALRAM SINGH HOME TO HEMANT SAHU HOME AT WARD NO. 10
CONSTRUCTION OF CC ROAD FROM KRISHNA COLONY TO RANJEET RANA HOUSE, FROM DANI NIHLANI HOME TO SANJAY SHAH HOME AT WARD NO. 07
CONSTRUCTION OF CC ROAD & RCC DRAIN FROM SULEKHA SHARMA HOME TO NAWDHA MANDAP AT WARD NO. 19
CONSTRUCTION OF CC TOP AND RCC DRAIN AT NEW BUS STAND KANKER
आदिवासी बालक आश्रम सरभोका का भवन निर्माण
Improvement to Raipur Water works including 3 months Trial run,12 months Defects Liability Period and 5 years Operation and Maintenance of all Project Components/whole scheme. i. Providing and Constructing 16.00 M Dia Intake Well cum Pump house on Bank of Kharun River with RCC Approach Bridge of 50 M in Length near Kathadih.. ii. Providing and Installing Raw Water Pumping Machinery 6 Nos. (4W + 2S) of Q=1705110LPH and Head 58 m. iii. Construction of Electric Sub Station of 2000/33/3.3 KVA out door at Intake Well site. iv. Providing and laying DI K-9 Raw water pumping main (Dia: 1200 mm & Total length: 6500 RMT) up to WTP at Dunda. v. Conventional Water Treatment Plant of Capacity 150 MLD with Lamella Clarifier and Recirculation arrangement including Conference cum SCADA room and Aluminium composite panel Cladding with frame on all 4 sides of all major buildings opposite dunda school. vi. Construction of Electric Sub Station of 5000/33/3.3 KVA out door at WTP site. vii. Providing and Installing Clear Water Pumping Machinery 6 Nos. (4W + 2S) of Q=1,710909 LPH and Head 96 m at WTP. viii. Providing and laying DI K-9 Clear Water Pumping Main of 1200 mm Dia of total length – 5500 RMT) from WTP Junction point at Santoshi Nagar Raipur. ix. Providing and installing Bulk flow Meter on Raw Water Pumping Main. x. Other Allied Works (Boundary wall, Staff quarter, Planitation, Land scaping, Rain water harvesting etc.). xi. PLC & IOT BASED SCADA for all components. Note: The quoted lump sum offer by contractor shall be deemed to be included of all the cost required for successful Survey, Engineering, Design, Supply, installation, testing and commissioning of whole scheme including Mechanical, Electrical, PLC, IoT base SCADA, Instrumentations equipment’s along with any other required components for the successful operation of the plant and cost of Operation & Maintenance for 5 Years. The department will not entertain any extra financial claim on account of extra items, it is solely the responsibility to bidder to ascertain extra items required for successful commissioning of whole scheme and should include the rates in its quoted offer.
Construction of RCC drain at ward 01 Navagaon Rajnandgaon
Construction of Community Building at ward no 03 Rajnandgaon
Construction of Boundary wall surraunding at new Industrial area tahsil – Fingeswar district – Gariyaband (C.G.
INTEGRTED MECHANIZED & MANUAL ROAD SWEEPING WITH IN THE COMMERCIAL AREA UNDER KORBA MUNICIPAL CORPORATION FOR A PERIOD OF 01 YEAR
Fixing of railing work from CSEB Chowk to Sharda Vihar Fatak in Korba
CONSTRUCTION OF FLUSH CAUSEWAY LENGTH 100 M KM 8 ON KOTTAGUDA- CHINTALNAR- MORPALLI ROAD DISTRICT- SUKMA.
CONSTRUCTION OF FLUSH CAUSEWAY LENGTH 30 M. KM 03 ON RAYGUDA-CHINTALNAR TO KISTARAM ROAD DISTRICT- SUKMA.
CONSTRUCTION OF FLUSH CAUSEWAY LENGTH 20 M KM 10 ON PULANPAD TO TIMMAPURAM ROAD, DISTRICT- SUKMA.
CONSTRUCTION OF FLUSH CAUSEWAY LENGTH 30 M. KM 2.10 ON KOTTAGUDA-TIMMAPURAM ROAD, DISTRICT- SUKMA.
CONSTRUCTION OF FLUSH CAUSEWAY LENGTH 80 M KM 8 ON CHINTALNAR - LAKHAPAL CAMP TO NAGARAM ROAD, DISTRICT- SUKMA.
White washing,Color washing, Distempering and Painting work of Govt. Residential and Non Residential Building Under P.W.D. (B/R) Sub Division Charama.
Special Repair work of Govt. Residential and Non Residential Building Under P.W.D. (B/R) Sub Division Charama.
Special Repair work of Govt. Residential and Non Residential Building Under P.W.D. (B/R) Sub Division Narharpur.
White washing,Color washing, Distempering and Painting work of Govt. Residential and Non Residential Building Under P.W.D. (B/R) Sub Division Narharpur.