Loading…
Loading…
4,442 results • Latest
Strengthening work of Deokar Saja Khamhariya (MDR-414) Road Length 30.80 KM. Including Bridges & culverts at Distt.- Bemetara (C.G.)
Construction of H.L. Bridge i/c Approach Road Across Hasdeo River on Sarvamangla-Tarada-Bhilaikhurd-Urga Road.
जोनल निविदा ग्रुप क्र. 15 ग्रामीण यांत्रिकी सेवा उपसंभाग दुर्ग अंतर्गत विभिन्न मदों में वर्ष 26-27 हेतु स्वी.रू 30.00 लाख तक लागत के छोटे-छोटे विभिन्न प्रकार के निर्माण कार्य का सम्पादन करना।
जोनल निविदा ग्रुप क्र. 11 ग्रामीण यांत्रिकी सेवा उपसंभाग दुर्ग अंतर्गत विभिन्न मदों में वर्ष 26-27 हेतु स्वी.रू 30.00 लाख तक लागत के छोटे-छोटे विभिन्न प्रकार के निर्माण कार्य का सम्पादन करना।
1. Providing, laying, jointing, interconnection, testing & commissioning of Clear water pumping main including 12 months trial run (DI K9 pipe Diameter - 300mm to 600mm of Total Length 2900m) 2. Design, Construction, water tightness Testing, Commissioning of 01 No. of Overhead Service Reservoirs of Capacity 1000 KL staging height 25 m including 12 months trial run. 3. Design & Construction of allied civil works such as Compound wall including Steel Main gates, Guard Rooms complete under BHILAI Municipal Corporation. 4. Dismantling 2 Nos Existing ESR of capacity 400 KL & Staging height 15 m
वार्ड क्रं. 31 वसिम घर से अनिश घर तक संतोष भोजनालय रोड तक आर.सी.सी. नाली एवं सी सी रोड निर्माण कार्य
Bank Protection Work at Bade Karli Anicut in Block Geedam, District Dantewada
Construction of Inspection Bungalow in Water Resources Division, Jagdalpur in Block Jagdalpur, District Bastar
Construction of Gufni Stopdam on Boriya Nala near Village Gufni in Block Bastar, District Bastar
Comprehensive maintenance and operation of all types of air-conditioners istalled at Pt. Deendhayal Uppadya Auditorium Science college Campus under workshop P.W.D. E/M . Sub Dn. Raipur ( C.G.)
SPECIAL REPAIR OF NEW COLLECTORATE BUILDING AT COLLECTORATE CAMPUS, RAIPUR (CIVIL + ELECTRIC WORK)
CONSTRUCTION OF C.C ROAD MAIN ROAD TO SATNAAM RANGMANCH TO LAXMAN MAHILANG TO KUNWARLAL SAHU IN WARD NO. 08 & 09
Construction of vegetable shed and stall, loading and unloading platform (6.5x4.75m), shops, toilet block 2nos, drive - way( cement concrete road width 6.00m, 4.50m), parking, pathway (width 3m, 2.10m), landscaping, sump tank, tubewell, septic tank and external electrification in bus stand vegetable market (haat bazar) in front of PG college in food zone at nagar nigam area raigarh distt-raigarh
Construction of vegetable shed and stall, loading and unloading platform (6.5x4.75m), shops, toilet block 2nos, drive - way( cement concrete road width 6.00m, 4.50m), parking, pathway (width 3m, 2.10m), landscaping, sump tank, tubewell, septic tank, composite shed (12mx6m) and external electrification in bus stand vegetable market (haat bazar) near sarangarh bus stand in nagar nigam area raigarh distt-raigarh
Construction of New College Building at Jatga. i/c W.S.S.F. Electrification, Boundary wall & Approach Road Works. (Deposit Work-Without Bonus and Escalation)
Construction of Law Building (For Ground, First & Second Floor) I/c. Water Supply, Sanitery Fittings & Electrification work at PT. Ravishankar Shukla University Raipur Under PM-USHA Component Grants to Strenghten Colleges(GSC) DISTT. RAIPUR.(Dn. no. 3, Raipur) (Deposit Work-Without Bonus and Escalation)
Construction of Badekanera Naresh Poyam House To Dongriguda Road From Km 1/2 to 4/6 = Length 3.60 Km Inc Culvert and Bridges Work Code W29754
Tender invited for Supply of Ethanol Manufactured from Rice under EBP Program for clearing allocated indents up to July of Q3 (ESY 2025-26)
CONSTRUCTION OF BAIGANDIH ANICUT OF BLOCK BASNA IN MAHASAMUND DISTRICT
CONSTRUCTION OF TALA ANICUT OF BLOCK PITHORA IN MAHASAMUND DISTRICT
CONSTRUCTION WORK OF C.C. LINING RD 12000 Μ. ΤΟ 15000 M. OF KHONGSARA DIVERSION SCHEME IN KOTA BLOCK OF BILASPUR DISTRICT.
Remodeling and C.C. Lining of Canal from R.D. 0m to 650m & 720m to 1670m with Renovation of wier & construction of Head sluice, 02 Nos inlet, 03 Nos VRB and 9 Nos Colaba fixing of Hanoda Diversion Scheme, block Durg, District Durg
Construction of Head Sluice, Earthwork on bund and Pitching work at Matkot Diversion Scheme in Block - Tokapal, District - Bastar
Construction of Open Trough at Kasanpal Tank Scheme From RD 0 M to RD 3000 M in Block Chhindgarh of Sukma District
Renovation Work of Ramaram Tank Scheme in Block Sukma of Sukma District
Construction of Bodaras Stop Dam and Retaining Wall in Block Chhindgarh of Sukma District
CONSTRUCTION OF HIGH SCHOOL BUILDING AT - KEWARADA BADI RAIGARH (C.G.)
CONSTRUCTION OF R.C.C. DRAIN IN W.N. 09 BAGMUDA TALAB TO PURANA CHIR HOUSE. (4th Call)
जनपद पंचायत खड़गवा के अन्तर्गन रूपए 30.00 लाख से कम लागत जोनल निविदा जनपद पंचायत भरतपुर जिला मनेन्द्रगढ़ -चिरमिरी -भरतपुर (छ. ग.)
जनपद पंचायत मनेन्द्रगढ़ के अन्तर्गन रूपए 30.00 लाख से कम लागत जोनल निविदा जनपद पंचायत भरतपुर जिला मनेन्द्रगढ़ -चिरमिरी -भरतपुर (छ. ग.)
जनपद पंचायत भरतपुर के अन्तर्गन रूपए 30.00 लाख से कम लागत जोनल निविदा जनपद पंचायत भरतपुर जिला मनेन्द्रगढ़ -चिरमिरी -भरतपुर (छ. ग.)
Revamping of Material Recovery Facility (MRF) including installation of Machinery and construction of Compost Plant in Municipal Areas of PRATAPPUR, Chhattisgarh 2nd Call
Construction work of first floor shopping complex above the shopping complex near Ward No. 01 Government Girls School.(2nd Call)
BORING WORK FOR CONSTRUCTION OF VARIOUS BRIDGES UNDER SUB DIVISION NO.-01 RAIPUR FOR 2026-27
वार्ड क्रमांक 05 में मानकी साहू के घर से ठाकुर तरिया तालाब बरगद पेड़ तक सीसी रोड का निर्माण कार्य ।
वार्ड क्र. 05 में मुख्य सड़क से मुक्ति दम तक सीसी रोड का निर्माण कार्य।
muktidham Construction work in ward 06 nagar panchayat Chandrapur
UPGRADATION WORK OF NH 353 TO SARADIH ROAD LENGTH 5.025 KM. I/C. CULVERTS AT DIST. MAHASAMUND (DN. MAHASAMUND).
WIDENING & STRENGTHNING OF SHYAM NAGAR-DEORI ROAD( VILLAGE ROAD NO.16),LENGTH 6.25 KM. I/C. CULVERTS AT DISTT. GARIYABAND ( GARIYABAND DN.).
WIDENING & STRENGTHENING OF KAUNDKERA TO BANSIVANI ROAD LENGTH 3.00 KM I/C. CULVERTS AT DIST. MAHASAMUND (MAHASAMUND DN.)..
WIDENING & STRENGTHENING OF PANDUKA-KAUNDKERA ROAD KM 6/2 TO 15/10 TOTAL LENGTH 10.00 KM,(MDR319) I/C. CULVERTS AT DIST. GARIYABAND.(GARIYABAND DN.)
Widening and strengthening work of Bihajhar -Ganjar -Reva Road ,km 1/2 to 26/10 = 25.90 Km I/C Bridge & Culverts at Dist.Mahasamund(Mahasamund dn.)
Construction of cement concreting work at paddy purchasing center in village bundeli in mandi samiti area baramkela distt-sarangarh-bilaigarh
Construction of Tatenga Bharda Mohandipat Road Length 3.30 K.M. i/c Bridges & Culverts At Distt.-Balod (C.G.)
CONSTRUCTION OF LAHANGAR TO PIDHI ROAD LENGTH 3.00 KM I/C. CULVERTS AT DIST. MAHASAMUND (MAHASAMUND DN.)
WIDENING AND UPGRADATION WORK OF BASNA -BHANWARPUR-SAGARPALI (MDR NO. 290) KM 1/2 TO 18/6 = 17.70 K.M. I/C. CULVERTS AT DIST. MAHASAMUND(MAHASAMUND DN.).
WIDENING AND UPGRADATION WORK OF PADAMPUR SARAIPALI SARSIWA ROAD (SH-16) ROAD ON KM 233 TO 256/6 = 22.10 K.M. I/C. CULVERTS AT DIST. MAHASAMUND.(MAHASAMUND DN.)
Construction of Pandatarai To Fastarpur Road Length 26.20 K.M. Including Bridges & Culverts at Distt.- Kawardha (C.G.)
CONSTRUCTION OF SUNDARKERA TO JAWAIBANDHA ROAD LENGTH 2.42 KM, I/C. CULVERTS AT DISTT.- RAIPUR (C.G.) DN. NO.3 , NAVA RAIPUR).
“Retrofitting and Alteration Work in E10B, Retail Building at CBD, Sector-21, Nava Raipur Atal Nagar, Dist. Raipur (C.G.)” (1st Call)