Loading…
Loading…
4,443 results • Latest
CONSTRUCTION OF GODOWN & OFFICE BUILDING AT VILLAGE- AKALWARA BLOCK CHHURA DISTT.- GARIABAND ( BALANCE WORK )
Construction Of Muktidham At Ward No. 02 Janakpur. (2nd Call)
Construction Of Rcc Drain At Ward No. 07 Savitri Baiga House to Sundi Baiga House. (2nd Call)
Construction Of Rcc Drain At Ward No. 15 Diamond Hotal to Main Road. (2nd Call)
Construction of Samudayik Bhawan At Ward No. 12
वार्ड क्र. 27 में स्थित अटल आवास मकान का मरम्मत कार्य। (2nd Call)
CONSTRUCTION OF CC ROAD FROM SAVITRI NAGAR TO SONUMUDA BASTI UPTO GOVT PRIMARY SCHOOL AT W.N. 38 (2nd Call)
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 21m, Raw water V.T. pumps and motors 189490 lph & 31m head-2 no, For Raw& clear Water Electric Sub station 200 KVA/33/0.415 KV with all required Work, 4 MLD conventional Type Water Treatment Plant, 3 Nos-90955 lph-139m head centrifugal pumps clear water pumps&motors, Construction of RCC Over Head Service MBR-3 Numbers - 90KL Capacity/ 30m Staging, 105KL Capacity/25m Staging, 215KL Capacity/ 30m Staging, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 400 m And Clear water pumping main 250 mm Dia DI K-9 Length 5625m, 200 mm Dia DI K-9 Length 4093 m, 150 mm Dia DI K-9 Length 1610m Total Length 11328 m &Clear Water Gravity Mains pipe 110mm dia of pipe material OPVC – 57737m., 160mm dia of pipe material OPVC –5386 m. 250mm dia of pipe material OPVC – 442 m, Total length OPVC – 63565m, with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Basis)
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia height 18m, Raw water V.T. pumps and motors 1919 lpm & 20m head-2no, For Raw & clear Water Electric Sub station 160 KVA/33/0.415 KV with all required Work, 2.5 MLD conventional Type Water Treatment Plant, 3 Nos.centrifugal pumps-923 lpm-155m head, Construction of RCC Over Head Service MBR-2 Numbers – 210 KL Capacity 30m Staging, 50KL Capacity 30m Staging, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 300 m And Clear water pumping main 250 mm Dia DI K-9 Length 3000m, 200 mm Dia DI K-9 Length 11500m, 150 mm Dia DI K-9 Length 300m Total Length 14800m & Clear Water Gravity Mains pipe 110mm dia of pipe material OPVC – 50097m., 160mm dia of pipe material OPVC – 24538m. 250mm dia O-PVC-1874m, Total length OPVC – 76509m, with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Basis)MULTI VILLAGE SCHEME -BADWAR BLOCK- PRATAPPUR DISTRICT –SURAJPUR
Design, Drawing, Construction, Interconnection, Testing, Commissioning of Intake well 6m dia height 26m, Raw water V.T. pumps and motors 2874 lpm & 20m head-3 no, For Raw& clear Water Electric Sub station 400 KVA/33/0.415 KV with all required Work, 7 MLD conventional Type Water Treatment Plant, 3 Nos. centrifugal pumps-1326lpm-165m head and 3 no-centrifugal pumps of 1437 lpm-150m head,Clear water pumps and motors, Construction of RCC Over Head Service MBR-4 Numbers - 150KL Capacity 30m Staging, 220KL Capacity 30m Staging, 90KL Capacity 30m Staging, GSR 310KL, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 400 mm Dia Length 125 m And Clear water pumping main 300 mm Dia DI K-9 Length 19286 m , 250 mm Dia DI K-9 Length 12127m, 200 mm Dia DI K-9 Length 6760m, 150 mm Dia DI K-9 Length 110m Total Length 38283m & Clear Water Gravity Mains pipe 110mm dia of pipe material OPVC – 52681 m., 160mm dia of pipe material OPVC – 40191m. 250mm dia of pipe material OPVC – 35350m. Total length OPVC – 128222 m, 300mm dia of pipe material DI K-7 – 8600m.,Total length of gravity main 136822m with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTs Allied All civil works including Boundary wall around WTP campus.After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Basis)MULTI VILLAGE SCHEME -JHILMILI BLOCK- BHAIYATHAN DISTRICT –SURAJPUR
Design, Drawing, Construction, Testing, Commissioning of Collecting well capacity 300KL with canal intake arrangement by 300 mm dia D.I. Connecting Pipeahead of collecting well 50 m Long , Raw water pumps and motors 61975 lph & 34m head -3 no, Raw Water Electric Sub station 100 KVA/33/0.415 KV with all required Work, 3 MLD conventional Type Water Treatment Plant,Clear water centrifugal pumps and motors 59550 lph & 80m head-3 no Clear Water Electric Sub station 160 KVA/33/0.415 KV with all required Work, 270 KL capacity 30 staging MBR. , Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 1800 m And Clear water pumping main 250 mm Dia Length 7069 m &Clear Water Gravity Mains pipe DI K-7 300 mm dia – 1636m., O-pvc Pipe PN-16 250mm to 110mm Dia dia – 61525m., Total Length- 63161 m with all required valves & specials, Providing and fixing Bulk flow meters for Entire Scheme upto Village OHTs Allied All civil works including Boundary wall around WTP campus, After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Bases)MULTI VILLAGE SCHEME -DUGGA-BATRA BLOCK- BHAIYATHAN DISTRICT –SURAJPUR
Design, Drawing, Construction, Testing, Commissioning of Intake well 6m dia 22m height approach bridge 45m length, approach road, Electric Sub station 250 KVA/11/.415 KV with all required Work,Raw water V.T. pumps and motors 03 no each of 15HP which can discharge 88076 LPH against Totalhead of29 m at near village Katkona, 3.0 MLD conventional Type Water Treatment Plant, 02-Nos of Clear water centrifugal pumps and motors each of 12.5 H.P. which can discharge ,25963 LPH against head of 65m head and 3 nos of centrifugal pump of 95 H.P. which can discharge 71572 LPH against 223m head ,along with the construction of 3 no of MBR,MBR-1 at village near Salka 110 KL capacity 30 M staging MBR-2, 60 KL capacity 30 M staging at village Katkona, MBR-3 215 KL capacity 30 M staging at village Koda, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 250 m And Clear water pumping main 150 mm Dia DI K-9 Length 2810 m,200mm dia length 19109m,250 mm dia 4905m total 26824 m&Clear Water Gravity Mains pipe O-PVC PN-25 250mm dia – 6343m, ,250mm diaO-PVC PN-16 -2063 mtr,160 mm diaO-PVCPN-16– 31051m,110 mm diaO-PVC PN -16-47136 m . Total Length- 86593 m with all required valves & specials as per attached key plan map, Providing and fixing Bulk flow meters, ,nala crossing and work include taking permission to department. LikePWD, WRD etc. Allied All civil works including Boundary wall around WTP campus. work completion is 12monthsincluding rainy season Integrationof all component,testing& trial run comprises of 03 month testing & 09 Month trial run (with defect liability period of one year),Balance Work under BARDAR- Multi-Village Water Supply Scheme of Block KHADGAWAN, District M.C.B (C.G.) (On Risk and cost Basis).
Design, Drawing, Construction, Testing, Commissioning of Intake well 6 m dia height 26.70 m with 3 no rose piece, A 350mm dia D.I. Connecting Pipe ahead of Intake well 200 m Long , Raw water pumps and motors 70298lph & 60m head -3 no, Raw Water Electric Sub station 100 KVA/33/0.415 KV with all required Work, 3 MLD conventional Type Water Treatment Plant,Clear water centrifugal pumps and motors 67594 lph &105m head-3 no & 12916 lph & 40m head -2 no, Clear Water Electric Sub station 160 KVA/33/0.415 KV with all required Work, 650 KL capacity 25 staging MBR. RCC Clear Water Sump Capacity 20 KL, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 250 mm Dia Length 1960 m And Clear water pumping main 100 mm Dia DI K-9 Length 1276 m & 250 mm Dia 3810 m Total Length 5086 m & Clear Water Gravity Mains pipe DI K-7 350mm dia – 966m., DI K-7 300mm dia – 5611m., & O-pvc Pipe PN-16 250mm-3595m ,160mm dia – 7701 m., 110mm dia – 27796 m. Total Length- 45669 m with all required valves & specials, Providing and fixing Bulk flow meters & Entire Scheme upto Village OHTsAllied All civil works including Boundary wall around WTP campus, Quarters. After completion of all components of the scheme 03 months of testing and 09 months trial run of Entire scheme (with defect liability period of one year). (On Risk and cost Bases) Biharpur MVS
Design, Drawing, Construction, Testing, Commissioning of Floating Pontoon of size 5X3 mtr at JHUMKA Dam, Raw Water Electric Sub station100 KVA/11/0.415 KV with all required Work,Raw water HSCF pump sets 2 no of 10HPhaving discharge - 97656 LPH and against 20.0m head at Floating pontoon station site, 2.0 MLD conventional Type Water Treatment Plant, Clear water centrifugal pump set 03 Nos of 30HP having discharge 93750 LPH against 101m head, Clear Water Electric Sub station 100 KVA/11/0.415KV with all required Work at WTP site, 120 KL capacity 30m staging MBR-1 no at village salka,100 KL capacity 16m staging MBR-2 no at village salka, Providing, laying, jointing and testing & commissioning of Raw Water Pumping Main DI K-9 Pipe 250 mm Dia- 200m and Clear water pumping main 150 mm Dia DI K-9 Pipe-3820 m,DI K-9 Pipe200mm dia-1210 m ,total Length-5030 m& Clear Water Gravity Mains DI K-7 pipe 300 mm dia L= 6128m.& O-PVC Pipe PN-16, 160mm dia – 5423m. 250 mm dia –7487m, 110mm dia – 31711 m. Total Length- 50749 m with all required valves &specials,as per attached key plan map, Providing and fixing Bulk flow meters, nala crossing and work include taking permission to PWD, WRD deptt. etc. Allied All civil works including Boundary wall around WTP campus. Work completion is 12 months including rainy season Integrationof all component, comprises of three month testing & 09 month trial run of entire scheme (with defect liability period of one year). (On Risk and cost basis)GROUP WATER SUPPLY SCHEME NARKELI BLOCK- BAIKUNTHPUR DISTRICT –KOREA
Construction Work of Fully Equipped Mukti Dham in Ward No. 22
Construction of 2 Nos Barrack and Toilet Room at Central Jail Ambikapur Distt Surguja (C.G.)
muktidham renovation / beauttification work ward 14 railway line para in nagar panchayat kirodimalnagar
वार्ड क्रमांक 44 में रामानुज क्लब परिसर में स्थित जिला अस्पताल अम्बिकापुर के आयुषविंग का जीर्णोद्धार कार्य।
Upgradation work of Muktidham at Ward No. 15
Revamping of Material Recovery Facility (MRF) including installation of Machinery and construction of Compost Plant in Municipal Areas of CHANDRAPUR, Chhattisgarh
वार्ड क्र 14 व18गुरु घासीदास चौक से मुक्ति धाम तक इलेक्ट्रिक पोल कार्य
e –TENDER FOR RATE CONTRACT OF CONSUMABLE ITEMS TO CHHATTISGARH MEDICAL SERVICES CORPORATION LTD
एकलव्य आदर्श आवासीय विद्यालय गोलावंड का अनुरक्षण एवं मरम्मत कार्य
Construction of Nandini Road to Awanti bai Chowk Canal Road Length 5.025 KM including Bridges and culverts at Distt.- Durg (C.G.)(On Road/Bridges/Building works SOR 01-01-2025/ 01-01-2025/01-01-2015)
Construction Of High Level Bridge i/c Approach Road Across Moran River on Kapildevpur – Basera Road.
Construction of High Level Bridge i/c Approach Road Across Iria River on Wadrafnagar – Mendhari Road
CONSTRCTION OF GODOWN COMPLEX-(GROUP NO. 02) KHOKHRA 2500 MT, TARAPUR 2500 MT, TARKELA 2500 MT & KODATARAI 2500 MT [Total 10000 MT]
CONSTRCTION OF GODOWN COMPLEX-(GROUP NO. 01) SAMBALPUR 2500 MT, SANKARA (K) 2500 MT, MEDESARA 2500 MT, BHARSELA 2500 MT & CHHATOD 2500 MT [Total 12500 MT]
Construction of Butena Dhourabhatha Road Length 12.50 Km.
Re Tender Engineering Items (Only OEM & Authorized Dealers)
जोनल निविदा ग्रुप क्र. 01 ग्रामीण यांत्रिकी सेवा उपसंभाग पाटन अंतर्गत विभिन्न मदों में वर्ष 26-27 हेतु स्वी.रू 30.00 लाख तक लागत के छोटे-छोटे विभिन्न प्रकार के निर्माण कार्य का सम्पादन करना।
Construction of CC ROADWork at Ward 05 Murliband Talab to Manya Kirana Store.
Construction of CC Road at Ward 15 Mendrapara Matachowk to Malik Ram Porte House.
Construction of RRC Drain Work at Ward 03 Mahamayapara Mainroad To Kunwarpar Talab Vhaya Pankaj Sharma House.
Construction of CC Road & Drain Work at Ward 12 Hatari Chowk to Urdu School Toward Chouhanpara.
Construction of CC Road & Drain Work at Ward 02 Ghandinagar Mainroad to Santosh Yadav House.
Construction of CC Road at Ward 14 Bodhiband Aanganbadi to Muktidham.
Construction of CC Road Work Work at Ward 11 Darripara to Laxi Shyamle house to school.
वार्ड क्र. 35, हवलदार अब्दुल हमीद वार्ड जोन क्र. 02, रायपुर खसरा प.ह.नं. 62, मौदहापारा, वार्ड क्र. 35, नजूल भूम ब्लाॅक नं. 1/1 का भाग में सामुदायिक भवन निर्माण कार्य।
वार्ड क्र. 12 में सांस्कृतिक भवन के सामने कांक्रीट ब्लाक निर्माण कार्य।
वार्ड क्र. 13 में सर्व मांगलिक भवन के सामने कांक्रीट ब्लाक निर्माण कार्य।
नगर पालिका सरायपाली क्षेत्रांतर्गत वार्ड क्र. 01 से 10 तक विभिन्न स्थानों पर पाईप लाईन विस्तार कार्य।
जोन क्रमांक 06, मोरेश्वर राव गद्रे वार्ड क्रमांक 59 अंतर्गत पचपेढ़ी नाका चौक से नहर रोड़ तक पाईप लाईन विस्तार कार्य।
B.T Patch Repair work on 1. Sonpairi Main Road to Khilora via Kabir Aashram 2. Gourbhat Bhalera Tamasivni Tandul. 3. Uperwara Tendua Cheriya Banjari Kurru 4. Jamgaon Mandlor Pond Dagniya 5. Cheriya Kurru Road 6. Tarra 17 No. Nali Nawagaon 7. Bhothidih Champaran Road 8. Charoda Khapri Tamasioni Burkha Pond Road 9. Torla Bhurkha Kumhari Road 10. Sunderkera Kathiya Road 11. Kathiya Tarra Ugetarra Nawagaon Road 12. Kendri Uparwara Road 13. Kendri ITM Uparwara Road 14. Jhanki Mudpar Pacheda Road Under Dn. No. 3 Nava Raipur
RENOVATION AND BEAUTIFICATION OF GHAT AND SHIV MURTI. (4th call)
All types of construction/repair works costing ₹3.00 lakh or less in Ward No. 5 to 8, approved by the Mayor, Councilor, Nominated Councilor, Repairs, Maintenance, and other heads (Rate Contract Tender for the financial year 2026-27)
PROPOSED CONSTRUCTION OF PARK AT - PANDIT SUNDARLAL SHARMA JI WARD NO.32,(IVth call)
All types of construction/repair works costing ₹3.00 lakh or less in Ward No.13 to 16, approved by the Mayor, Councilor, Nominated Councilor, Repairs, Maintenance, and other heads (Rate Contract Tender for the financial year 2026-27)
Divider with Drain from Agrasen Tiraha to under bridge ward 08
All types of construction/repair works costing ₹3.00 lakh or less in Ward No. 37 to 40 approved by the Mayor, Councilor, Nominated Councilor, Repairs, Maintenance, and other heads (Rate Contract Tender for the financial year 2026-27)