Loading…
Loading…
5,003 results • Latest
Providing Precast Cement Concrete Interlock Paver Road, Pathway & Storm Water Drain with Cover for Kendriya Vidyalaya No.1 at Panambur, Mangaluru.
MOEI & Fans, R/M of P/sets, Lifts, Air-Conditioning units and Water Coolers, DG Set, FF Equipments and FA System at RPQS Bldg., Sewri, Mumbai during the Financial year 2025-26 Subwork/Packages: Rectification of installed surveillance system.
Conversion of border security fencing from phase II/III to new design fence in West Bengal Between BP. No. 243/MP to 764/2-S (Length 210.028 km) SH In various stretches from BP. No. 355/2-S to 357/1-S (4.725 km), 361/M to 365/M (6.329 km), 385/2-S to 385/5-S (0.800 km), near BP No. 399/8-R (0.030 km), 401/6-S to 402/2-S (0.180 Km) and 409/5-S to 417/8-S (15.383 Km) (Total Length 27.447 km including intermediate BOPs, reverine structures like bridges, culverts, including gaps in fences and length of existing old fences which are not in the scope of this work etc.) along IBB in the district of Uttar Dinajpur, WB. (Pkg-V) in EPC Mode-III. SH Providing services of one diesel driven inspection vehicle (BOLERO or equivalent make) having not older than 03 years along with driver for office duty of O/o the AE, BFSD-III, IBBZ-I, CPWD, Islampur on monthly hire basis including the cost of hiring charges of driver, maintenance with upkeep charges on vehicle and as per terms and condition.
A/R & M/O to CGH and Revenue Pool at S.M. Plot, Phase II, Sector VII, Antop Hill, Mumbai 37 during 2025-26 SH : Painting of NON GPRA quarters
Construction of Administrative Block and 08 Nos Type-III quarters i/c development works at Sector Hqrs SSB Gorakhpur. SH Structural Design work.
A/R & M/O vacant land taken over from CGWB near Gurudwara at Sector-3, R.K. Puram, New Delhi dg 2025-26 (SH: Providing round the clock security guards for Government Land near Gurudwara).