Loading…
Loading…
2,324 results • Latest
Re-Construction of Street and Drain Bye Pass Road to Main Karnal Road (Are Wali Gali) in Ward No-09, Nissing.
Providing and laying 80mm Thick IPB M-40 Garde and Construction of Drains H/o Gulab to H/o Malli/Jogga Singh in Ward No-11, MC Nissing.
Supply of installation of Air Conditioner in Horticulture Division HSVP Gurugram
Construction and Strengthening of bituminous road and Laying Storm water line near Vita park to House shyam kunj 1048 T-point in Sector 11-12 ward no 15 M.C Panipat Urban For L and C Society
Prov. and fixing of DI water supply pipeline along with Drilling, Installation and commissioning of 1 No. MS tubewell by hydraulic rotatory drilling (reverse circulation) and 1 No. PVC tubewell in Bharti enclave and Arya Enclave Ward No.14 MC Panipat
DNIT for Supply, Installation, Testing, Commissioning Online Monitering Device (OMD) at 18.00 MLD STP at Line Par area of Bahadurgarh Town and all other works contingent thereto.