Loading…
Loading…
17 results • Latest
RC for Hydro testing and Refilling of Fire extinguishers for a period of 02 Years
Hydrotest and Refilling (A)
Routines of Diving and Surfacing system, Masts and Capstans for MRLC INS Sindhuvijay
Mandatory Services (Annexure-1 of Appendix-9)
FRESH WATER HYDROPHORE SYSTEM WORKS ON SR 22050.
The following valves to be removed from position,blanked pipe lines,shifted to workshop,dismantled all parts,cleaned,inspected,replace all the defective parts,painted,boxed back,pressure tested and fitted in position,valve gear operation to be overahuled,In butterfly valve- valve rubber seat to be checked,same need to be renewed if rubber seat is found defective.satisfactory operation to be showned to surveyor and ship staff,initial and final survey reports to be submitted.all consumables and materials like ms blanks,neoprane joints,oil joints,gm lids and seat machining works,grease,wraping sheets,ss washers ,ss fasteners(ss316),brass seat rings,gland packing,glands, ss/ brass spindels,valve wheels,butterfly valve rubber seat mouldings,neoprene rubber coating inside the valves,valve gear box parts,paints are procure,supply and fitment in contractor scope.all machining works,pullers,welding,cutting and brazing works are in contractor scope.
Removal, repair, installation and trials of auxiliary cooling and Chilled water Systems of EKM Class submarine
Mandatory Services (Annexure-1 of Appendix- 8)
Preparation and fabrication of wooden mock-up to demonstrate the stowage arrangement of the vessels anchor on the side shell
Anchor stowage
PROCUREMENT OF TIRFOR MACHINE FOR VC11199
Tirfor Wire rope Pulling Pushing Machine (Specifications and Quantities as per TTS)