Loading…
Loading…
16,174 results • Latest
Construction of LHS in lieu of LC No. 14 (GADH-KDJR), LC No. 08 (GADH-PRNR), LC No. 23 (HCNR-NKW) and LC No. CP-1 (CTC-KDRP), Provision of LHS at Trespassing Locations between BGPL-SKND, Construction of LHS from R1 to R4 Portion at DNKL Yard, Execution of PRIME Target Works, Replacement of Overaged Battery Chargers, Chokes and Other Track Circuit Equipment, and EI Alteration in 02 Nos. Siemens Electronic Interlocking Installations in Khurda Road Division.
BOGIE FRAME ARRANGEMENT FOR AIR SPRING TYPE MEMU/DMC BOGIES
SMET- TLGP sec: Provision of rail barricading along the track at road running parallel to track, cattle crossing and heavy trespassing locations for length of 7.390kms. (km.86/000-400 RH, 86/700-87/200 RH, 93/100-200 RH, 102/450- 103/100 LH, 111/800-112/500 RH, 118/500-600 RH, 122/600 - 900 LH, 124/100- 200 LH, 124/640-690 LH&RH, 125/900-126/040 RH, 126/400-650 LH, 128/000-250 LH,128/100-200 RH, 128/700-800 RH, 136/800-900 LH&RH, 155/600-156/000 RH, 156/100-400 RH, 157/300-400 LH, 158/000-159/300 LH&RH).
SW-I : ADEN/SKLR Sub Div:- Construction of Boundary Wall along the track approaches of HAS & SBHR stations for a length of 1500mtrs. SW-II : MYS-Y - Construction of Side drain - 2180m (Km.104/000- 104/07, 111/04- 111/700,119/100-199/400, 121/300-121/600, 122/700-127/900 DN line, 128/700- 128/900 LH & RH, 116/450-116/700 B/W UP & DN ) SW-III - MYS-Y - Construction of Side drain - 1630m (Km.106/630-107/000-UP, 114/100-114/380-DN, 116/400- 114/600-DN, 116/900-117/100-DN, 117/260-117/500-UP, 130/700-131/040-DN ) SW-IV - MYS-HLN Improvements to cess at scattered locations SW-V - ADEN-MYS subdivision- Improvements to cess in MYS-CMNR section at scattered locations
Timing Belt L- 300
Provision of Relay Hut at (18 Nos Level crossings) for Gate Signalling at Non Interlocked L-xing gates over Firozpur division (TVU between 10,000 and 20,000) in the jurisdiction of DEN-HQ/FZR as per Type Plan No. HQ/01/02-2017/R-1.