Loading…
Loading…
68,321 results • Latest
DEVELOPMENT OF PARK AT RAIN CHOWGUND B BLOCK VERINAG
Construction of flood protection work on right side at village Bigh Beighgund RD 14050 to 14100M
Please refer BOQ
Construction of protection work on left side at village Gulbugh RD 6800m Upstream culvert
C/O TILE PATH FROM H/O MUSHTAQ AH SHEER GOJRIEE TO H/O ASHIQ HUSSAIN SHEER GOJREE QUIL
Please refer BOQ
Please refer BOQ
Construction of protection bund near the land of Muneer Ahmad Sanie and Gh Rasool sanie at Falchill
C/O CREATE BUND NEAR BASHIR AH LONE S/O MOHD SUBHAN AND C/O RWALL NEAR H/O AIJAZ AH SOFI TO ONWARDS AT WARD NO 2 ASHTANGOO GHAT
C/O DRAIN FROM H/O AMIR U DIN SHEIKH TO H/O GH HASSAN SHEIKH ASHTANGOO GHAT
Please refer BOQ
CO TILE PATH FROM MAIN ROAD TO GRAVEYARD NHO GH MOHAMMAD KHAN AND EDGE WALL NEAR HO ISHTIYAQ AHMAD KHAWAJA AND TILE PATH FROM HO ASHIQ HUSSAIN KHAN TO SPRING AT PANZIGAM AT BLOCK BANDIPORA
Fencing with protection bund at Graveyard Nuchgam
Please refer BOQ
Construction of retaining Wall near house of Adil Bhat and land of Mushtaq bhat, Rashid Dar at Nunner
Construction of Retaining Wall/Drain near land of Gh Qadir Ganie, Rashid Parray and house of Nazir Bhat and Earth Filling of lawn Middle School Nunner
CO P-WALL NEAR HO FEROZ AHMAD KHAN AND OTHERS AT WARD NO. 04 AT PANZIGAM AT BLOCK BANDIPORA
Fencing around graveyard Astan Sharief Upper side ward Number 10 at Nunner
Supply, Installation, Testing and Commissioning of Security and Monitoring System and Electrical Works with power backup and Control and command centre for monitoring of Katra Town
Construction of protection bund near house of Gh Ahmad to Rajnat and Gh Mohd Parray S/o Khaliq, Farooq Ahmad Bhat, Gh Mohd Bhat and drain Yalla Wadi and Stair Steps near house of Zahoor Ahmad Parray at Nunner ward Number 10 at Nunnerq
Constructin of Tile Path/ Protection Bund Firdous Ahmad Ganie, Muneer Ahmad, Gh Hassan Ganie, Mukhtar Ahmad Sanai, Shakeel Ahmad, Gh Qadir and Protection Bund Reyaz Ahmad Tantray and Abdul Rashid Shergojri at Falchil
Construction of Protection Bund near house of Master Gh Mohd Ganie, Sajad Ahmad Sanai, Nisar Ahmad, Zafer Ahmad Sanai at Falchil
Electrical Works pertaining to Central Heating System installed at Govt.SMHS Hospital Srinagar for the year 2026 27
P.BUND NEAR LAND OF MOHD SHAFI GHUNOO AND OTHERS AT TELWANI ACHABAL. BLOCK ACHABAL
Construction of tile path around Astan Sharief Gundi Arjun.
CO DRAIN WITH PROTECTION WALL AT TANGPATI BARZULLA WARD 1 AT PANZIGAM AT BLOCK BANDIPORA
PLEASE REFER NIT
Construction of Protection Bund near house of Gh nabi Sanair (Naseema), Bashir Ahmad, Dilshad Ahmad at Falchil
Construction of drain with protection bund from house of Master Zahoor Ahmad Ganie to Gulzar Ahmad Ganie and protection bund near house of Sadiq Naseem Nazir and Gh rasool, Nazir Ahmad at Falchil ward number 4 and 5
C/O P.BUND NHO FAROOQ AHMAD SHAH, RAFIQA BANOO AT TUMBIPORA BLOCK ACHABAL
Imp/Upgradation of lane No. 06 Acha Bagh, Malla Bagh at Shahi Hamdan Colony road Zakura.
Repairment and renovation of Panchayat Ghar Dreygam
Restoration and preservation of Panjnara Temple
Up-gradation of Road from Polytechnic College upto Qadir Guran Pend at Watapora Payeen Bandipora
Protection wall near the land of Farooq Ahmad Baba, M. Y Baba, Dr. M. S Baba at Shabinoo Dreygam
Selection of Irrigation Service Provider (ISP) for the Development of Pressurzed Piped Irrigation Network (PPIN) and Providing of Irrigation Services in Patyari MCAD Cluster in Block Ghagwal, District Samba of Jammu and Kashmir
TILE PATH NEAR EVERGREEN SCHOOL AT KAWARIGAM BLOCK ACHABAL
Capacity addition of 1 x 3.15 MVA Power transformer along with its switch gear and auxiliaries at existing 33//11 KV 3.15 MVA SMVD University Receiving Station including reconditioning of existing infrastructure.
AS PER NIT
Macadamization of road at Gulbahar Colony Rangpora (Phase-1).
Shifting Re-erection of 250KVA substation along with HT LT line at Shama Chak main bazar on BJ2 feeder to new proposed site of Sh. Ashok Sharma s o Sita Ram 9906353621under UT Capex budget in Janipur on turnkey basis SCodePDDSS2627100503.
Replacement of damaged CT/PT unit at FTR HQ BSF Camp Paloura, Jammu on 11KV MU-06 feeder I the jurisdiction of sub division Janipur on turnkey basis
Construction of protection bund with fencing around graveyard at Khasipora
Macadamization Bachi Darwaza Makhdoom sahab start from Bachi Darwaza gate to Devi Angan.
Please refer BOQ
Constt of CSC unit at Banhali Mohalla in the land of Qamer Din S/o Khazara W.No.6 Distt REASl for the year 2026-27
Creation of 630KVA substation along with HT line for technological intervention for Fish seed and Trout production in UT of JK DrMangla Rai Committee Project (Installation of Large Carp Feed Mill at RAFDA GhoManhasa Jammu Scheme Code FSHSS2324100013
Creation of 63KVA Distribution Sub station alongwith HTLT line at new Potha colony ward no 5 pyt Chak Bhagwana Block Bhalwal Akhnoor under CDF of Shri Mohan Lal Bhagat
Construction of Drain / Repairment of tube well near Hanfia Masjid Sharief at Peth Dreygam