Loading…
Loading…
67,244 results • Latest
RDDC2627118252 CONSTRUCTION OF P BUND NEAR LO MOHD ANWAR TO GH RASOOL TO LO M AFZAL DAR AT DRANKNARD WACHIPORA MURRAN
Establishment of closure Using Sq. PCC Post at Spacing 10ft with 7 Strands viz.,5 diagonal and 2 crisscross of GI-BW with every pole concrete in Co. 83/D, Allya of Lamberi Range in Nowshera Forest Division for the year 2026-27 under CAMPA (NPV)
Establishment of closure Using Sq. PCC Post at Spacing 10ft with 7 Strands viz.,5 diagonal and 2 crisscross of GI-BW with every pole concrete in Co. 135/N, Rachhwa of Nowshera Range in Nowshera Forest Division for the year 2026-27 under CAMPA (NPV
Strengthening of Pathway by Way of Tiling in Girls Hostel Under Strengthening and Macadamization of Campus Roads (CAPEX) at FVSc and AH Shuhama, SKUAST-K.
SITC of VRV/VRF Air-Conditioning System for Division of Entomology Under (CAPEX/NABARD) at Main Campus Shalimar, SKUAST-K.
RDDDC2627115154 CONSTRUCTION OF DRAIN NLO GHULAM QADIR WANI R/O BABHAR AT TAHAB
Repair and Restoration of 400 KVA Distribution Transformer Under Upgradation of Existing Infrastructure (CAPEX) at FVSc and AH Shuhama, SKUAST-K.
RDDDC2627115133 C/O DRAIN FROM H/O MD. YAQOOB SHEIKH TO L/O HALEEMA D/O HAYAT GANAIE AT ZAI MOHALLA I TAHAB
RDDDC2627114286-Constt. of P.bund Phader Kull on road side near L/O Mohd. Shafi at Akhall and R/o Phader Kull near Mohd. Yousuf Dar to Manzoor Ahmad Dar at Akhall
RDDDC2627106286 - CONSTRUCTION OF LANE WITH DRAIN FRON HOUSE OF MOHD AYOUB MALLA TO HOUSE OF GULAM DAR AT SHAHABAD BALA
RDDDC2627110237 CO CSC AT MASJID SHARIEF BONPORA HDPORA
Upgradation of Internal Roads by Way of G1, G2, Wet Mix Macadam and Semi Dense at CoTS Mirgund, SKUAST-K (CAPEX).
Establishment of closure Using Sq. PCC Post at Spacing 10ft with 7 Strands viz.,5 diagonal and 2 crisscross of GI-BW with every pole concrete in Co. 136/N, Nadyalla of Nowshera Range in Nowshera Forest Division for the year 2026-27 under CAMPA (NPV
Balance Electrification Work by Way of LV Panels and Cabling etc and SITC of 30 KVA 3 phase Online UPS Compact Type with Lithium Backup for Lab Cum Lecture Block (A Block) Under (HADP/CAPEX) at Main Campus Shalimar, SKUAST-K.
Balance Work for Establishment of Veterinary Polyclinic Complex at FVSC and AH Shuhama, SKUAST-K (CAPEX).
PLEASE REFER NIT
PLEASE REFER NIT
Construction of Bore Well at High School Batapora, Block Beharbagh, Hangalbuch in District Kulgam.
Construction of Bore Well at Near Jamia Masjid Sharief at Kanjikulla, Block Beharbagh, Kanjkulla Kokergund in District Kulgam.
PLEASE REFER NIT
Development of Eco-tourism Park in Co. 113/N Nowshera of Nowshera Forest Range of Nowshera Forest Division UNDER U.T CAPEX 2026-27 (SASCI)
Construction of Bore Well Near Masjid Sharief Bonapora at Yemrach, Block Beharbagh, Yemracha (A) in District Kulgam.
Construction of Bore Well Near Masjid Baghbal at Yemrach, Block Beharbagh, Yemracha (A) in District Kulgam.
Construction of Bore Well Near Masjid Bilal at Yemrach, Block Beharbagh, Yemracha (A) in District Kulgam.
Bore Well at Takya Mode Nayabat NHO Nazir Ahmad Malik, Block DK Marg, DK Marg-A in District Kulgam.
Construction of Bore Well near grave yard at Eid-Gah Mohalla at Bhan, Block Qaimoh Bhan, in District Kulgam
Construction of Bore Well near House of Mohd Khalil Naik, Junaid Ahmad Naik at Bhan, Block Qaimoh Bhan, in District Kulgam.
Construction of Bore Well Masjid Sharif Herpora at Mah, Block Qaimoh Bhan, in District Kulgam.
Construction of Bore Well near House of Shakeel Ahmad Bhat, Mushtaq Bhat Bonpora Bhan, Block Qaimoh Bhan, in District Kulgam.
Construction of Bore Well Near House of Ali Mohd. Dar and Others at Bogund Qaimoh Block Qaimoh, in District Kulgam.
Bore Well for Muqdam Pora Qaimoh, Block Qaimoh, in District Kulgam.
Constt. of R/wall from Jamia Masjid to Pump Station along river Jehlum at Dar mohalla Shallabugh-B Block Sherpathri PRI 585
Facelifting of spring near jamia masjid at haripora Block Lar PRI 259
Development of Park at RDD hut Sonamarg A Block Gund PRI-676 3rd Call
Construction of Path and filling of Panchayat Ghar Gadoora Halq Gadoora Block Ganderbal PRI 40 2nd Call
Construction of Selfie Point near Satrina public Park.Margund.Block Kangan.DDC.217. 2nd Call
Const/imp of drain from L/O Jamal Sheikh to L/O Gh Nabi sheikh at sheikh mohalla Akhal B.Block Kangan.PRI.706. 2nd Call
Const of R/wall near H/O Gh Mohd Teli Dursoma Manigam B. DDC 88. 2nd Call
Construction of R/wall near H/o Zakir Khari and others at Kachnambal B ward No 03.Block Kangan.PRI.788. 2nd Call
Construction of protection wall near house of Jamal Bhat S/o Habib Bhat and others at Dard Mohalla Kachnambal Kangan.PRI.986.
Imp of Latrine/bathroom of Panchayat ghar Burnbugh.Block Kangan.PRI.729.
Construction of Iron Access Stairs at Wani Mohalla Graveyard Bonibagh.Cherwan A .Block Kangan.PRI.762.
Construction of Water Storage Tank at OBC Mohalla Bani W no 7 Pyt Thakrakote Block Thakrakote District Reasi under Capex Budget PRI for the year 2026-27.
UPGRADATION OF PANCHAYAT GHAR AT KATIBUGH (HALQA KATIBUGH BLOCK KUNZER) UNDER BDC YEAR 2026-27
C/O TILE PATHS AT DIFFERENT SPOTS YEDIPORA HALQA ACHABAL B BLOCK NAIDIHAL UNDER ADP PRI
FENCING/IMPROVEMENT OF PANCHAYAT GHAR AADIPORA PH AADIPORA PRI GRANTS BLOCK SOPORE
C/O PCC PATH AT DIFFERENT SPOTS AT W-5 NEAR H/O ARIF TANTRY TO ONWARDS AND C/O DRAIN FROM H/O ZAMEER DAR TO SHOP OF ALI MOHD DAR AT W-4 AT SHIRPORA B, PYT SHIRPORA B, BLOCK KHORE SHERABAD, SCHEME ADP-PRI, YEAR 2026-2027.
C/O R/WALL ON LINK ROAD NEAR H/O FAROOQ AHMAD GANIE AND AB MAJEED WANI AT W-7 AT SHIRPORA B, PYT SHIRPORA B, BLOCK KHORE SHERABAD, SCHEME ADP-PRI, YEAR 2026-2027.
IMPROVEMENT OF DRAIN AT W-3 NEAR HO IMTIYAZ AHMAD GANIE TO ONWARDS AND DRAIN AT W-6 NEAR HO GH MOHD GANIE, HALQA SHIRPORA B, UNDER ADP-PRI BLOCK KHORE SHERABAD YEAR 2026-27
C/O PCC PATH FROM MAIN ROAD TO H/O GH MOHI UD DIN KHAN AND ALI MOHD AT W 2 WITH IMPROVEMENT OF DRAIN NEAR H/O ABDUL KAMAL CHOPAN SHIRPORA B, PYT SHIRPORA B, BLOCK KHORE SHERABAD, SCHEME ADP-PRI, YEAR 2026-2027