Loading…
Loading…
28,513 results • Latest
Monsoon Planting Works No of Pits 307 Slze 0 71 M3 No of PBS 307 10x16 including providing of SeedlngsRange JurisdictionUppinangady
Procurement Of Rabbit Acsr Conductor - Davanagere Circle
RDPR - Rural Development and Panchayat Raj Department
Construction of 10 lakh litre capacity on 15 Mtr staging RCC shaft type Over Head Tank and providing and laying 250mm Dia DI K9 feedermain in Ranebennur City under Deposit Contribution work of Ranebennur CMC 15th Finance Scheme. (Lumpsum tender No Variation)
Road Safety Works on Jayapura - Koppa road from KM 0.00 to 1.00 KM (Selected reaches) in Koppa Taluk Chikamagaluru District.
Tender for Appointment of Project Management Consultancy Services for Preparation Plan, Architectural Designs, Detailed Project Report (DPR), Detailed Estimates and Allied Consultancy Services for the work of Construction of Commercial complexes under TMC Sadalga limit of Chikodi Taluka Belagavi District.
Drilling of Borwell and Installation of pumpset at Halatti, GTTC Collage, ward no 12 Laxmi temple, Nangalingeshwar colony, New hudco colony, wada galli, Matangi keri, Karnure galli in Chikodi Town
ROAD
Recarpeting of Mudhol Nippani road to Navalihal Sankanawadi Shiragoan road (MDR) from Km 1.57 to 2.47 in Chikodi taluk of Belagavi dist under HOA 3054 MDR maintenence.
Supply and commissioning of GE fanuc PLC accessories, up gradation of PLC software and reconditioning of complete PLC system for Stacker/Reclaimer-3 at CHP-1 RTPS
a)Retrofit/Up gradation of existing Schneider make PLC and SCADA/HMI systems installed at RTPS-Unit 8 DPMRHS.b)The bidder/agency shall be required to supply the materials as per the technical specifications and quantity mentioned under the head of technical specifications.c)The bidder/agency shall be required to install and commission the supplied materials in the existing PLC control cubicle itself by retaining existing IPR(Interposing relays),MCBs and TBs.d)The bidder/agency shall be required study the existing software/Logics incorporated in the PLC/SCADA system, further to carryout re-engineering works, software/Logics development based on customer/site requirement and also for the assessment of additional accessories required to complete the Retrofit/Upgradation works in complete manner.e)It is the single point responsibility of the bidder/agency to carry out the works in the stipulated time period.f)Providing required power supply will be under the scope of KPCL itself.g)T&P and any other consumable materials required for the work will be under the scope of agency/contractor only.h)Before quoting the bid, it is compulsion to visit the site for the assessment and studying the site/customer requirement.i)Storage of materials while executing works is single point responsibility of contractor/agency scope itself.j)The agency shall be required to handover as built drawings and software backup CDs (OS,Application and system software) along with O&M manuals 04 Sets.k)Materials supply shall be completed in all respect within the stipulated period as per the contract. Materials shall be delivered to RTPS site through EE(Stores)O&M. Unloading of materials at RTPS site location and shifting of the same to work location is under the contractor/agency scope only.l)Handling, shifting, unpacking and Erection and commissioning of the entire system shall be under the scope of bidder itself.m)All required consumables, hardware and licenced software, accessories and any other materials which are not included in the scope and required for successful installation and commissioning of the Retrofit/Up gradation of existing DPMRHS PLC system of RTPS Unit-8 to latest version will be under the contractor/agency itself.n)All the materials required for the installation and commissioning of Up gradation of existing DPMRHS PLC system of RTPS Unit-8 to latest version shall be made as detailed under the technical specifications and shall be installed and commissioned as per the scope of work.o)Warranty-All the materials and other equipment covered under supply portion shall cover a warranty for a period of 12 months from the date of commissioning or 18 months from the date of supply.Warranty-All the materials and other equipment covered under supply portion shall cover a warranty for a period of 12 months from the date of commissioning or 18 months from the date of supply. Any faulty items/spares observed during this period shall be replaced at free of cost.
Consultancy Services for Providing Irrigation Facilities to the suffering Area under the Savalgi Tungal Lift Irrigation Scheme by Lifting Water from the Krishna River near Tubachi village in Jamakhandi taluk.
Formation of Industrial Layout, including Construction of Roads, RCC Side Drains, RCC Ducts, RCC Cross Drainage, Retaining Wall, SWD & HDPE Dual Water supply pipe line at Sector-3 in Devanahalli General Industrial Area Phase-2 (ITIR Phase-2), Doddaballapura & Devanahalli Taluk, Bengaluru Rural District.
Providing FHTCs to 32 Households in Goninayakana Doddi Habitation of Goninayakana Doddi Village, Kallabalu Grampachayath Anekal taluk in Bengaluru Urban district through Augmentation SVS in Anekal taluk, Bengaluru Urban district through SVS
Panchayathi Requirements
Tender for Supply of fish, egg, milk & meat of buffalo above the age of thirteen years for the feeding of captive carnivore wild Animals and birds housed at different units in Kalaburagi New Zoological park Madbol
Providing 25 Litres Electric Geysers, Electrical Points with wiring and providing dedicated water supply line to geysers with platforms
Rental of vehicles for the various works of Visvesvarya Technologyical University Head Office, Belagavi - Anual Rate Contract Basis for period of one Year (2nd Call)
Improvements to Orohalli tank, Ummalu Tank, Soluru Tank, Makanahalli of Jadagenahalli Hobli, and Isturu Tank, Isturu Hosahalli Tank of Sulibele Hobli In Hosakote Taluk Bangalore Rural District.
Construction of closed RCC Box in Cut Cover method along Corridor-4 of Suburban Rail Project between Heelalige and Benniganahalli
Construction of Box Culvert to Sunkeshwarala to Gugal Via Hirebudur,Matpalli MDR at CH.3.10km In Devadurga Taluk Raichur District.Under 5054-80-190-0-01-132 KRDCL Limited Capital Expenditure for the year 2026-27
Any permanent way work of track linking and/or Rail renewal and/or sleeper renewal and/or turnout renewal and/or track maintenance work
Rotogravure Printing Inks and Caustic Soda Lye in tanker load
Tender for conducting Detailed modern survey for transmission line connectivity the work of establishing 66/11 kV S-s at Hoysalakatte in C.N hally Taluk, Tumakuru dist.
Construction of road
Estimate for Advance work ANR Model-02 pits 8x12 pbs, 440 pits or ha towards Range Forest area in Mulbagal range during 2026-27 (25ha)
Estimate for Advance work ANR Model-02 pits 8x12 pbs, 440 pits or ha towards Range Forest area in Mulbagal range during 2026-27 (25ha)
Estimate for Advance work ANR Model-02 pits 8x12 pbs, 440 pits or ha towards Range Forest area in Srinivasapur range during 2026-27 (25ha)
Estimate for Advance work ANR Model-02 pits 8x12 pbs, 440 pits or ha towards Range Forest area in Bangarpet range during 2026-27 (25ha)
Estimate for Advance work ANR Model-04 M3 Trench 8x12 pbs, 1000 Plants or ha towards Range Forest area in Srinivasapur range during 2026-27 (25ha)
Estimate for Advance work ANR Model-03 M3 pits 10x16 pbs, 278 Seedlings or ha towards Range Forest area in Srinivasapur range during 2026-27 (25ha)
Estimate for Advance work ANR Model-03 M3 pits 10x16 pbs, 278 Seedlings or ha towards Range Forest area in Srinivasapur range during 2026-27 (25ha)
Estimate for Advance work ANR Model-04 M3 Trench 8x12 pbs, 1000 Plants or ha towards Range Forest area in Bangarpet range during 2026-27 (25ha)
Estimate for Advance work ANR Model-04 M3 Trench 8x12 pbs, 1000 Plants or ha towards Range Forest area in Mulbagal range during 2026-27 (25ha)
Estimate for Advance work ANR Model-03 M3 pits 10x16 pbs, 278 Seedlings or ha towards Range Forest area in Mulbagal range during 2026-27 (25ha)
Estimate for Advance work ANR Model-02 pits 8x12 pbs, 440 pits or ha towards Range Forest area in Srinivasapur range during 2026-27 (25ha)
Estimate for Advance work ANR Model-02 pits 8x12 pbs, 440 pits or ha towards Range Forest area in Bangarpet range during 2026-27 (25ha)
Construction of 50 KLD STP (Sewage Treatment Plant) and other basic amenities to Taluk Level Hospital at NAVALGUND in Dharwad District.
Reborings to borewells in ward nos.02 08 09 26 and 29 and removing of stracked pumpsets from existing borewells in ward nos.10 15 and 29 and Deepening of existing borewell in the premises of fire station in Siruguppa
Providing shelter to the proposed Dr. B R Ambedkar Statue at GDPH
LAYING OF BARBED WIRE FENCING WITH RCC PILLARS AT TUMARIKOPPA FSY NUMBER 167, 161, 168, 183, 186, 187, 188, 189, 190, 191 & 192 IN KALAGHATAGI RANGE DHARRWAD DISTRICT (4.18 KM)
Construction of New Anti Poaching Camp at Mulluru Gudda in Nugu Wildlife Range, Bandipur Tiger Reserve during 2024-25
Providing G.I Chain link fencing at NSP,GKVK
Work of Performance based Modernization, Remodeling of Water supply systems and reduction in UFW under Halasuru Service Station area limits of BWSSB, Bangalore.
1Annual Maintenance of Ilkal Kandagalla Sajjalagudda SH-238 from km 0.00 to 6.00, 17.87 to 23.16 and 30.50 to 31.00 in Hungund Taluk 2)Annual Maintenance of Karawar Kaiga Ilkal SH-06 from km 328.64 to 338.84 in Hungund Taluk of Bagalkot District.Under 3054 SH Maintenance for the year 2025-26
Development of road from Someshwara Temple to Ashtra Coffee (Somwarpet -Shanivarasanthe main road) in Somwarpet TP limits
Annual maintenance of Road from Bangalore Dommasandra to Sulikunte Colony via Shanthigiri Aashrama, Kodathi J.H.C, Wipro SEZ, Mulluru Connecting Road from Ch 0.00 Km to 5.94 Km in Bangalore East Taluk.
Short Term Tender Invited (Single Cover System) from any individuals/ Registered Firms/ Agencies for conducting exhibition for the year 2025-26 at Karavali Exhibition Ground
Construction of Box Culvert in Veerpapur in Maski Taluka of Raichur District. (Under K.K.R.D.B Garnt For The Year 2025-26)
Shingatalur-05 -Tender for Disposal of Sand Blocks in IV, V and VI Higher Order streams / rivers at Shingatalur Village Mundargi Taluk. of Gadag District