Loading…
Loading…
28,411 results • Latest
Maintanance work of Kandali-bylahalli-paduvalalu-Bikkodu Road from ch 16.40 to 18.18 km from ch 24.00 to 25.50 Km and From ch 25.900 to 26.30 Km for the year 2026-27 in Belur Taluk 2.) Maintanance work of B.T.Road to Join KBPB Road Via Hanike-Hulugundi- Kamenahally Road from ch 0.90 to 4.30 km from ch 4.50 to 6.00 Km and from ch 6.40 to 6.70 km for the year 2026-27 in Belur Taluk
Maintanance work of CM road to Y.J. road Via Dyavappahally-Lingappanakoppalu Road from ch 0.00 to 1.20 km, from ch 3.20 to 5.50 Km and From ch 6.50 to 9.00 Km for the year 2026-27 in Belur Taluk
Maintanance work of Tagare-Tolalu Road from ch 0.00 to 5.00 km and from ch 6.10 to 7.90 Km for the year 2026-27 in Belur Taluk
Maintanance work of BB Road To Kogilamane-Malegere Road from ch 0.00 to 5.70 km for the year 2026-27 in Belur Taluk
Maintanance work of Halebeedu-Hassan Road To Gonisomanahally , Mahamadpura , Machenahally , Ningappanakoppalu Road from ch 0.00 to 0.50 Km and from ch 2.50 to 10.00 Km for the year 2026-27 in Belur Taluk
Maintanance work of Yalgunda-Javgal Road from ch 0.00 to 12.30 km for the year 2026-27 in Belur Taluk
Maintanance work of Arehalli-Bikkodu Road from ch 0.00 to 8.40 km for the year 2026-27 in Belur Taluk
Maintanance work of C M Road to Kannapura Road from ch 3.00 to 9.00 km for the year 2026-27 in Belur Taluk
Maintanance work of CM Road To Join Chikkameduru Via Chinnenahally Road from ch 0.00 to 4.00 km for the year 2026-27 in Belur Taluk 2.) Maintanance work of NH-234 to Join Belur-Kodlipete SH Road via Navilhalli, Kandavara, Nitturu, Chennapura from ch 0.00 to 2.00 Km for the year 2026-27 in Belur Taluk 3.) Maintanance work of Belur Temple Road from ch 0.00 to 1.40 km for the year 2026-27 in Belur Taluk
Maintanance work of Mudigere Belur Road To Join Aggadallu, Adumanahally Via Yamasandi Road from ch 0.00 to 3.30 Km for the year 2026-27 in Belur Taluk 2.) Maintanance work of K.R Pete-Gendehalli Road from ch 13.40 to 17.75 km for the year 2026-27 in Belur Taluk
Maintanance work of Kogodu- Neralakatte Road to Join A.T. Road from ch 0.00 to 6.20 km for the year 2026-27 in Belur Taluk.
Construction of Bamboo storage Godown at Bhagawati range 2026-27
Maintanance work of Road from Turuvekere (NH-150A) to Join Lakya cross (NH-173) SH-267 from ch 109.40 to 112.47, Ch 115.580 km to 116.08 Km, 118.08 to 121.08 Km and ch 128.24 to 129.90 Km for the year 2026-27 In Belur Taluk
Construction of Over Head Tank for the use of the Staff Quarters at Bhagwati Range 2026-27
Development of Samudaya Bhavan Jai Hanuman Tanda near Babu Pawar house ward no. 46 at Kalaburagi South constituency at Kalaburagi town under MLA LAD for the year 2024-25.
e-tender notification for food tender to BBS
Supply of High End Color Doppler System to Radiology Department KIMS Koppal.
Improvements of Park at Siddeshwara Nagara, Shivamogga with in SBUDA Limit
Improvements of Park at Vidyanagara MC Park, Shivamogga with in SBUDA Limit
Manufacture and Supply of 4 PIN Cross Arms-GI
Annual Maintenance
Repairs to Shiggavi Savanur Railway Station Road from km 18.850 to 18.950 km and Asphalting from km 19.100 to 19.300 and km 19.400 to 19.550 for the year 2025-26 in Savanur taluka of Haveri District. (RESERVED FOR CATEGORY-II(A))
Annual maintenance of electrical Equipments and maintenance of Crematorium at Kempapura, in Hebbala Kempapura Ward-No 09
Combined Package (Package IX) -Work A- Providing additional 1X20 MVA , 110/33 kV Transformer at 110 kV Madavu Sub Station in Puttur Taluka , Dakshina Kannada District.Work-B Providing additional 1X20 MVA , 110/33 kV Transformer at 110 kV Jeepu Sub Station in Mangalore Taluka , Dakshina Kannada District.Work C -Providing additonal 1X20 MVA ,110/33 kV Transformer at 110 kV Hiriyadka Sub Station in Udupi Taluka and District.Work D- Providing additonal 1X20 MVA ,110/33-11 kV Transformer at 110 kV Ripponpete Sub Station in Hosanagar Taluka , Shivamoga District .Work E- Providing additional 1X20 MVA, 110/11 kV Power Transformer at 110/11 kV Ambaragoppa Sub Station in Shikaripura Taluka,Shivamogga District on Partial Turnkey Basis,Percentage Basis including Supply of all Materials/Equipments(Excluding supply of 11kV Switchgear) and Erection (including dismantling &Civil Works) of all Materials/Equipments,Testing and Commissioning.
Drilling of borewell, laying of HDPE pipeline, and installation of a cistern at Hamali Quarters, located behind OPEC Hospital on Hyderabad Main Road at ward no 29 in Raichur City.
Supply of Lab Consumable Taluk Hospital Bantwal D.K Karnataka
Formation of Industrial Layout, Including Construction of Flexible Pavement Roads, RCC Side Drains, RCC Chambers, RCC Storm Water Drains, RCC Cross Drainages, Laying of HDPE Pipes for Water Supply Works etc., at proposed Chintamani Industrial Area, Phase-I, Chikkaballapura District
SHORT TERM REQUEST FOR PROPOSAL OR CATCHING AND SHELTER MAINTAINANCE OF INSTITUTIONAL DOGS IN BENGALURU NORTH CITY CORPORATIO, ZONE-1LIMITS BY INTERESTED NGO/FIRM/ORGANISATION/INDIVIDUALS
Supply, Deployment and Maintenance of WhatsApp Chat, Bots and other WhatsApp based solutions for Cyber Crime Helpline-1930 Call Center with following Modules
VEHICLE HIRED FOR THE YEAR 2026-27
Construction of Intigrated science lab to GHPS Upgraded RMSA Yeragera village in Raichur Taluka of Raichur District. (Under PM Shree SSK for the year 2025-26)
Selection of Agency for Comprehensive Maintenance and Operations Support for Integrated Command and Control Centre, Belagavi Smart City for 2 Years 6 Months
RFP for providing Housekeeping Services to Integrated Public Grievance Redressal (iPGRS) Project - Bharat Scouts and Guides Building 2nd floor, Bengaluru
E- TENDER FOR BIOMEDICAL AND WASTE MANAGEMENT SERVICE IN DHARWAD DISTRICT.
Repair & Construction of Goat & Sheep Farming Demonstration Unit at College of Agriculture Kalaburgi.
CONSTRUCTION OF APPROACH ROAD, COMPOUND WALL & FENCING FOR THE HIGH-TECH HORTICULTURE TECHNOLOGY PARK, AT SIRWAR VILLAGE, KANAKAGIRI TALUK KOPPAL DISTRICT
Tender for Supply of T-shirts, Cap and Bag for 8th , 9th, 10th standard Students under Karnataka Darshan Tour Programme
Construction of C C Road at Attihal village in Hukkeri Taluka Belagavi Dist
Construction of a C.C. road from Ambedkar Circle via Jatrat Ves to Sachin Hegdes house and from Ambedkar Circle to Kumar Davanes house in Nipani city, Nipani taluk of Belagavi district under the H/A 4059 SCP CMIDP FY 2026-27.
White Topping on 1.Railway station circle to Nanjanagudu road elethota junction-JLB Road.2. Metropole circle to outer ring road via kalamandira-Mysuru- Hunsuru Road 3. Palace west gate to bogadi village limit via outer ring road-Mysuru Bogadi Road 4.JLB road to outer ring road via railway museum, Akashvani, Vontikoppal , Jayadeva Hospital, Metagalli-Mysuru - Belagola Road 5.Suburb Bus stand to Railway Station via K.R.Hospital-Irwin Road 6.Forum mall to outer ring road via sathagalli bus stand-Mysuru-Mahadevapura Road 7.Harding Circle to Columbia Asia Circle via KSRTC bus stand, Five light circle, Government guest house junction, FTS circle, bannimantapa circle, JSS dental college. 8. Basaveshwara circle to outer ring road via Agrahara temple 101 Ganesha temple, Nanjumalige circle, Silk factory circle, srirampura-Mysuru-Manandavadi road 9.Kukkarahalli kere junction to outer ring road via vijayabank circle, Andolana circle-Vishwa manava Double road upto ORR 10. Nazarbad vani vilas college to Mysore mall-Zoo front road.11. Harding circle to Govt Guest house arch via police commissioner office, Chamundi Vihar stadium, police academy. 12. Harding circle to sub-urban bus stand via siddartha hotel,Taluk office road in Mysuru city
Providing Backdrops for the Main and Alternative Stages for Cultural Programmes at Mysuru Palace during Dasara-2026
Providing and erection of tent, seating arrangement and other arrangements for lunch/ breakfast arrangements to Mavutha and Kavadigas family for Dasara 2026
Road development work and Construction of Open drain at Right side of Menasinkayi oni in W No.7 Dharwad Division
Consultancy Services for the work of to carryout EIA, SIS Studies etc., to obtain Environmental Clearance (EC) from State Environmental Impact Assessment Authority (SEIAA)/ Ministry of Environment, Forest and climate Change (MoEF&CC) and Consent for Establishment (CFE) from Karnataka State Pollution Control Board(KSPCB) and submission of Half Yearly compliance report for all the conditions of EC & CFE for 3 years for the Tidagundi Industrial Area, Vijayapura Taluk & District
SUPPLY OF SPARES PARTS TO SIMS SHIMOGA
Providing and Supplying Kitchen equipment and Furniture to Karmika Samudaya Bhavan in Ballari district.
Providing Manpower services of Computer Operator/Literate Assistant/Driver/ Nursery & Camp Watchers working on outsource basis.
Supply, erection and commissioning of Buttrfly valve with RCC chamber for Kainkatti line and Kerur line to regulate water under Herkal LIS
Procurement of Printed zipper pouch for M S Pineapple 130g 9 inch agarbathi
Design Supply Installation Testing and commissioning of LMP Expansion - Tanker CIP & Process CIP at Bengaluru Dairy Main Dairy on turnkey Project.-Pack-3