Loading…
Loading…
1,059 results • Latest
Procurement of various valves for unit 1
REPAIR TO PATCH/POWDER FALLING OF SLAB'S
REFURBISHMENT OF 3 PHASE EXHAUST FAN
SERVICING & REPAIRING OF COAL MILL CRANE
SUPPLY OF HARD SETTING COMPOUND CEMENT
BM-660 INTERNAL SPARES OF ELECTROMATIC
BM-660 AEI OF BOILER TUBE BENDS
BM-I_T_298_ reconditioning of Ash Handli
SAFETY_660_Work of application with supp
BM_T_264_upper and lower reject knife ga
SUPPLY OF LIQUOR AMMONIA TO VARIOUS TPS
T-328/26WORK PROV&FIXING COLOUR COATED Z
T-523/2025 supply of engine BD-155
T-2282_I&C-II_SOOT BLOWER POPPET VALVES
Truck Movement Monitoring through GPS
CIVIL-210 Mosquito Control treatment to
T-276/TIC-I/SUPLY+INSTAL 3PH HICON3 ESP File Name
WTP_660_Supply of Laboratory fine chemic
WTP-II_T_329_DESKTOP SODIUM ANALYSER
ODP-II WORK OF OVERHAULING & MECHANICAL
TMI_2037_Work contract of tube leakage
TM660-Supply of CW Pipe Rubber Expansion
BMII_T_1672_High grade scrapper assmly
WTP I_T 364_S_SUPPLY FILTER MEDIA SAND G
BM_T_459_damage silencer hood asslys.
Hiring 01 no. Taxi for SE
FF:Providing,fixing of first order board
CVL:BMC fabrication colony & power house
CHP:Proc. ele. cleaner sprays, consumabe
MS:BMC Loading,Unloading heavy material
HOSPITAL:Proc. Medicine Paras Dispensary
EMT:BMC repair & servicing room AC
WTP:Proc. Loboratory inst. pH Meter
BM:Work of burner tilt mechanism, replce
FF:AMC Fire water Pipeline leakages PTPS
BM:WORK replacing isolating valve of ERV
BM:WORK OF REPLC.OF CERAMIC LINED PIPES
C& I: Proc. of RF level sensors for ESP
BM: WORK of Air Pre Heater
AHP:Proc. Fastners required for UNIT 3
BM:WORK Hanger support replacement
BM:WRK OF FABRCTN OF PA FANS SUCTN FLTR
2 yr AMC for garden GH at KDPH
AMC filtration plant Tillari & Doodhgang
WTP-II_T_2018 DRINKING WATER
WTP-II_T_249 analysis of water samples
OS-660 lifting and transportation of Ash
BM-II_T-2038_ID FAN 5B (DE &NDE)
CHP-B_T-1594_Annual work contract for S&
CHP-C_T-2114_Supply of Hydraulic spare