Loading…
Loading…
18 live7 closing this weekmost from NLC India Limited and NLC India Renewables Limited
Published at procure.nlcindia.in.
18 results • Latest
Renovation of Toilet facilities at TPS-I Expansion.
Construction of toilet facilities for students at Govt. Higher Secondary School, Dharmanallur.
NLCIL-BLM- Supplying & Fixing of Precast pillars, Barbed wire & Chain Link fencing at phase II of Green belt area of Barsingsar Lignite Mine
Miscellaneous Civil maintenance works in other than Main Plant area of NNTPS.
Maintenance & repairing of water supply, drainage pipe lines and peripheral village water supply works in TPS –II.
Empanelment of consultants for providing “Consultancy services to NLCIL for Participation in Auction of Mineral Blocks” for period of two yea
Empanelment of Consulting firms for Carrying out Financial Due Diligence for appraisal of Mining Projects for a period of Two yea
TP-Laying of BT Road around Parking Area and from Mines Gate to Beden River-Chaltikira to Mines Gate
Appointment of Engineering Consultant for the preparation of Detailed Project Report for Brahmani Pumped Storage Project (750MW) in Odisha.
BMC for Certain Non-plant Buildings, Outside Roads including Monsoon preparedness works at GTPP
NLCIL- BTPS-Civil- Repair & strengthening work of induced Draft Cooling Tower (IDCT Unit-1) inside BTPS- Phase-2
Construction of Bridge across Bhedan River at village Khinda in Sambalpur District, Odisha.
Arrangement of 1500 Acres Land Through Outright Purchase for Development of Solar PV Projects in the State of Tamil Nadu
SETTING UP OF 49.5 MW WIND POWER PROJECT AT PAPADAHANDI, ODISHA WITH O&M for 10 yrs
THERMAL POWER STATION-II 2ND EXPANSION (2 X 500 MW) PROJECT NEYVELI, TAMIL NADU
EOI for Qualifying Requirements for Single Package EPC for 3x125 MW TPP at Gurha, Bikaner dist.(Raj)