Loading…
Loading…
24,014 results • Latest
Improvement to Kalimati MIP in Ghatagaon block of keonjhar district under CRITICAL grant for the year 2026-27
Improvement to Samantarapur to Ukusahi road in the District of Jagatsinghpur under MMSY-Improvement Existing RD road for the year 2025-26
Construction of Staff Quarter at Venkatpalam Ashram School in Kalimela Block
Cleaning and Desludging of existing sewerage system of different areas for the period of 2 years (24 Months) under WATCO Section, Baramunda H.B. Colony, Bhubaneswar City
PWD Road to Dangripada_Road_Bush cutting,WMM in patches,Primer,Tack coat, PMC and SC_0.000 to 2.200
Construction of Day Care SC Building at Sikarpai (K.Singpur) in the District of Rayagada for the year 2025 26
Repair to HL Bridge over Pipal Nallah on Kamthana to Ghusrigudi road _Road_Repair to bridge such as minor repair to railing, wearing course etc and painting along with repair to both side approaches_At 3.500 km
supply of Insecticides and Larvicides
Operation and Maintenance of existing sewerage system of different areas under WATCO Section, GGP, Bhubaneswar City
Construction of Drain with Cover Slab from Rashid Chowk towards Rawani Chowk and Baba Talab in Ward No.02
RD road to Uperkenduguda_Road_Pothole repair with WMM,PMC and SC_0.000 to 1.100
Construction of 100 seated Hostel at Jantri UGHS in Chitrakonda Block
Supply, Fixing Installation and Testing of materials for Internal Electrical Works of Office Building of Baleshwar Municipality
PWD Road to Sunamukhipada_Road_Bush cutting,WMM in patches,Primer,Tack coat, PMC and SC_2.032 to 3.100
Dasigaon to Padampur_Road_Bush cutting,WMM in patches,Primer,Tack coat, PMC and SC_0.000 to 1.976
Construction of Tribal Museum at Malkangiri in Malkangiri Block
Protection to Mahanadi Right Embankment from Banapur to Banapur College from RD.1200 mtr to 2700 mtr
Repair to HL Bridge over river Udanti at 2nd KM on Pwd road to Palna_Road_Repair to bridge such as minor repair to railing,expansion joint, painting along with repair to both side approaches _At 2.200 km
PWD road to Sankhairmal_Road_Bush cutting,WMM in patches,Primer,Tack coat, PMC and SC-CW-3.00m-_0.000 to 0.800
Construction of Adivasi Sanskruti Bhawan at Podia in Podia Block
Construction of Adivasi Sanskruti Bhawan at Malkangirii in Malkangiri Block
Protection to Right bank near village Jakeikela Patra sahi of Brahmani river, Bonai Block of district Sundargarh.
Const. of Additional Classroom at Dr. Shyama Prasad Degree College, MV-79 in Kalimela Block
Construction of Boundary wall around the alienated land at Ramnaguda Block in the district of Rayagada for the year 2025-26.
Construction of Adivasi Sanskruti Bhawan at Chitrakonda
Construction of Adivasi Sanskruti Bhawan at Kalimela in Kalimela Block
Construction of Paver Block foothpath along both side of CC road from Mohit Swain res to Bijaya Baliarsingh res at Bhanapur in Ward No.58.
Construction of Adivasi Sanskruti Bhawan at Khairput
Supply, Installation, Testing and Commissioning of Lift for Spillway of Kanupur Irrigation Project, Basudevpur
Repair to Bridge over Barehi Nallah at 3.20km on Gidighaty to Badapalsa road_Road_Repair of Railing, Painting of Railing and Rapair of both side Approaches_At 3.200 km
Launching and Packing
Construction of new 1 No SubDivision office 2 Nos section Office Store Area for newly created RWSS SubDivision Khajuripada at Harbanga under Kandhamal District for the year 202627
Slope Protection to the Right bank of river Tel at Tikirapada Ghat near village Gambharipadar of Kantamal Block in Boudh District (Working RD 52.300 km to 52.600 km and 53.300 km to 53.670 km
Construction of newly created RWSS Section III at Phiringia under RWSS Division Phulbani
Construction of newly created RWSS Section III at K.Nuagaon under RWSS Division Phulbani
Construction of newly created RWSS Section III at Phulbani under RWSS Division Phulbani
Construction of newly created RWSS Section III at Tikabali under RWSS Division Phulbani
Construction of newly created RWSS Section III at Tumudibandha under RWSS Division Phulbani
Construction of newly created RWSS Section III at Raikia under RWSS Division Phulbani
Construction of newly created RWSS Section III at Kotagarh under RWSS Division Phulbani
Construction of newly created RWSS Section IV at Baliguda under RWSS Division Phulbani
Construction of newly created RWSS Section IV at Kotagarh under RWSS Division Phulbani
Construction of newly created RWSS Section IV at K.Nuagaon under RWSS Division Phulbani
Construction of newly created RWSS Section IV at Daringibadi under RWSS Division Phulbani
Sahaspur To Khadimahara Road_Road_CC over laying_0.800 to 1.400
Construction of newly created RWSS Section VI at Daringibadi under RWSS Division Phulbani
Construction of Right side compound wall, dismantaling of old building and internal an external electrical works of new Regional Transport Office building at Kandhamal, Phulbani
CONSTRUCTION OF COMMUNITY CENTER NEAR BARALA DEVI TEMPLE. WARD NO. 4
Supply and Installation of Aerosol based Fire Fighting equipment at CHC, Sumandala Buildings.
Supply and Installation of Aerosol based Fire Fighting equipment at PHC, Rambha Buildings.