Loading
Loading…
Loading…
23,805 results • Latest
Construction of drain From Patel Basti to U.P School Gate Unit-2, From IVR-30/1 to IVR-33/2 unit-2, From Qr. No-2RA-17 to 2RB (1/1) in Ward No.40
Restoration of disturbed stone pitching in the U/S rip rap within RD 7400.00 ft. to RD 7920.00 ft. between RL 605.00 ft. to 630.00 ft. of Right Earth Dam for the year 2026-27
Improvement of Road and Drain in Surya Vihar I and II in ward no. 58
Restoration of disturbed stone pitching in the U/S rip rap within RD 12290.00 ft. to RD 12820.00 ft. between RL 605.00 ft. to 630.00 ft. of Right Earth Dam for the year 2026-27
Earth work and structural work
Construction Of 3 set of two-Seater LOO at ward no. 45.