Loading…
Loading…
24,034 results • Latest
Provision of Fire down comer system Booster pump,Fire Detection and PA system, Fire extinguisher and Signage at CHC Building at Krushnaprasad Buildings.
Construction of MM Road - Tamanpalli via Tigal Road under the Scheme MMSY-Improvement to Existing RD Roads in the District of Malkangiri for the year 2025-26.
Const. of mandap at IMST front at ward no. 09
Repair to Ambachatara CD in Bhubaneswar Block of Khordha District under Impt to CD scheme for the year 2026-27
Improvement to Podamari Dolaba Sindurapur Patiguda road in the District of Ganjam under MMSY-Improvement to Existing RD Road for the year 2025-26.
Improvement of road at Bagichasahi near Samaresh Mishra house in ward No 02
Improvement of road at Butupali from PWD road to Pandit Sahi in ward No 17
Const. of pavar Road from Pinku tea stall to sisu mandira Boudary at ward no. 01
Renovation of Canal System of Hirakud Dam Project of Papanga Canal Section Burla Irrigation Division Burla
Repair to Deuli CD in Bologarh Block of Khordha District under Impt to CD scheme for the year 2026-27
Const. of RCC culvert infront of Stadium bandha
Restoration to KV Right Embankment from RD 27.00Km. to 27.250Km.
Electrical
Supply of 350 Nos Wheel Barrow to Cuttack Municipal Corporation
Electrical
Electrical
Earthwork, Cement Concrete, Reinforced Cement Concrete, and RR Stone Works. Earthwork, Cement Concrete, Reinforced Cement Concrete and RR Stone Works
Construction of H.L. bridge over river Salandi at 3.400Km on Dubapal to Banmunda Road
Electrical
Construction of Internal Drainage System at PHC(N) Building Kotagarh for the year 2023-24
Const. of Pavar block Road Upper line Sasanka Das House to south co office side and Play station (Phase-02) at ward no. 10
Construction of OSD near Nilakantheswar Temple in Ward no-10
S/R to Jamut to Demuhan road for the year 2026-27
Supply and installation of 20 KVA online UPS including all accessories at ICU, DHH, Phulbani
SH-16 to Kotamal via Bankapur, Ranimunda_Road_Box Cell Culvert-1x3x4- and 30 mtr Guard Wall_At 0.180 Km
Construction of New Community Health Centre (G plus 2) at Binka of Sonepur District.
Construction of CC Approach Road at PHC Building Kotagarh for the year 2023-24
S/R to PS road to Sindurbahali road for the year 2026-27
DEVELOPMENT OF SWAPNESWARA MANDIRA
Construction of Drain with cover Slab from Dillip Sharma House backside towards Augustus Kujur House at Ward no.20
Repair to SB Over Oliajore -Dhanapali- at 2nd Km on Kulekela to Dahanpali Road_Road_Wearing Coat, Guard Post and colouring _At 2.000 Km
EV Chargers
CONSTRUCTION OF CC ROAD FROM RANPUR SUNAKHALA MAIN ROAD TOWARDS AKHANDALAMANI SAHI IN WARD NO-02
Construction of H.L. Bridge over Local Nallah on Pingu to Chitraposi via Pokharia road
Development of service road at Ch.11.339 PUP at Kusunpuri village for the year 2025-26.
Construction of 36 Nos. of E-Type staff Qrs. (Block-I (S plus 3) and Block-II (S plus 2)) at Sonepur.
Covering of slab Mani Mandir to Bijaya Malla house, Naran Mandal house to Fhobi Sahoo house in ward no 19
Roof Shed Work
RD road to Lepta_Road_Pothole repair with PMC and SC , Bush Cutting0.000 to 1.900
Construction of Box Bridges across the Gobari Canal to connect from Fakirabad to Jamiama AU Islamic University road
Construction of H.L. Bridge over Local Nallah on Jholdunguri-Matiali-Dova road
Protection to scoured bank on Nuna right Embankment U/S of Nuna Bridge near village Badapal
Construction of Barigaon-3 Check Dam in Ullunda Block of Subarnapur District under MATY-3.0 Scheme for the year 2026-27
Fire Station Building at Dharakote G.F_building
Construction of trough wall of Endar Minor and its outlets of Gobari Canal
Construction of trough wall of Disty.No.10 from RD 435M to 775M. ofGobari Canal
Earthwork, Cement Concrete, Reinforced Cement Concrete, and RR Stone Works. Earthwork, Cement Concrete, Reinforced Cement Concrete, Single under reamed piles and RR Stone Works
Construction of New CHC (G plus 2) Building at Ullunda, Subarnapur.
Covering of slab Kamya house to Kailash Rout house in ward no 19