Loading…
Loading…
17,194 results • Latest
Providing and laying Interlock tiles in Bazighar Basti Parkash st. School st. and Mehar Chand st. and Adj. ward no.17
Replacement of Old Sewer lines and Providing and Laying of Sewer line 300mm I d D I K 7 pipe and Construction of Hatch Box at village Chaundheri Lalru Distt S A S Nagar Mohali
Construction of 1 No OHSR of 227300 liters 50000 GLS capacity and all other works contingent thereto Near Community Centre at Barari at Nangal Distt Ropar
Renovation of various Streets of madhupuri mohalla and adj. ward no.17
Rough cost estimate for laying of stone ware pipe ( SW Pipe) Near baba bal Bharti mandir firni village matour of MC S.A.S Nagar
Construction of 1 No OHSR of 227300 liters capacity and all other works contingent thereto Ward No 3 Village Dubete at Nangal Distt Ropar
Providing and Installation of 3 nos of Reverse Rotary Rig bore and 4 nos of Straight Hand Bore Tube wells Including O and M No Extra Cost for O and M will be paid for period of 2 years under Under Zone 4, 4A under West Constituency
P/L INTERLOCKING TILES 60 MM AND LAYING SEWER LINE AMARJIT STREET, BACK SIDE RAJNISH KAURA HOUSE, GANGA RAM RODE STREET AND ADJOINING STREET IN WARD NO.12
Construction of New Health and Wellness Centre (HWC) at Village Sohian Kalan Block Majitha , Distt. Amritsar
Providing and Installation of 3 nos of Reverse Rotary Rig bore and 4 nos of Straight Hand Bore Tube wells Including O and M No Extra Cost for O and M will be paid for period of 2 years under Cantt Constituency
P/L INTERLOCKING TILES 60 MM ADV JAGPAL STREET DHARAMA, STREET TAJUDIN PAL SINGHM STREET BUBBY BURF WALA STREET, KHAIRA STREET WARD NO.13
Providing and Installation of 3 nos of Reverse Rotary Rig bore and 4 nos of Straight Hand Bore Tube wells Including O and M No Extra Cost for O and M will be paid for period of 2 years under Cantt Constituency
P/L INTERLOCKING TILES AND LAYING SEWER LINE IN PASWAN STREET AND STREET RAM STREET WARD NO.7
P/L INTERLOCKING TILES 60 MM AND LAYING SEWER LINE DHARAMSHALA STREET AND ADJOINING RANJIT STREET, GOLU STREET AND ADJOINING WARD NO.2
P/L RCC PIPE NP2 300 MM GHAI CEMENT STORE TO KAMAL CAR SHINGAR LINK ROAD
REPAIR WORK (RELAYING TILES NEW ROAD GULLEY, CHAMBER, NEW MANHOLE , LAYING PVC PIPE ) IN WARD NO.10
Construction of AAM Aadmi Clinic at Village Gill Block Tarsikka
P/L RCC PIPE 450 MM AND P/L INTERLOCKING TILES 60 MM MiNDER PANDIT STREET, RINKU STREET, SADIQ STREET WARD NO.6
Repair Rehabilitation and up gradation of IPS including Civil Works (Construction of Rooms and RCC Chambers), DI Pipeline (K-9), CI Specials, Pumping Machinery, Submersible Pumps and Installation of 82.5 KVA Genset at Gauri Shankar Mandir, Kalia colo
P/L INTERLOCKING TILES 60 MM AND LAYING SEWER LINE PAPPU MAHANT STREET, RAJA STREET, ARJAM STREET, PALTU, GURMEET STREET WARD NO.4
Laying of Sewerline in Anand Avenue backside Juneja School and Parkash Panch wali gali Zone 6A
Laying of Sewerline in Kacha Mohalla Kashmir wali gali, deep nagar and Gawala Mohalla, Deep Nagar Zone 6A
Construction of AAM Aadmi Clinic at Village Abdal Block Majitha
Laying of Sewerline in Mayur Enclave, Shiv Enclave and Pancheel Avenue Zone 6
Construction of AAM Aadmi Clinic at Village Bhaini Block Verka
Providing and laying DI water supply line at Kabir vihar in Ward 62 under Zone 8
Replacement of water supply line a Balwinder Pardhan street Bank colony in Ward 62 under Zone 8
Laying of UPVC Sewer and Water Supply lines in different streets of ward 56 under Zone 8
Construction of New Health and Wellness Centre (HWC) at Village Chogawan Block Chogawan Distt. Amritsar
Comprehensive AMC for Township AC
Providing and Laying of sewerline at Bhargo Camp Mochi Mohalla to Nari Niketan rd Falling under Zone 4A
Providing and laying of 8 inch dia UPVC at Sant Nagar Ward 48 under Zone 4
Estimate for laying of DI k7 Water Supply line in Santokhpura Ward 73 Under Zone 7
Providing and Laying of 4 inch dia water Supply DI K7 line at different areas of Ward 78 under Zone 2
Providing and Laying of new Manholes at different areas of Ward 50 under zone 4 2nd attempt
Replacement of Tee Connections, Rising of Manhole and Repair of Sewer Manholes and Road Gullies in different areas of Ward 12
Replacement of Tee Connections, Rising of Manhole and Repair of Sewer Manholes and Road Gullies in different areas of Ward 23
Operation and Maintenance of IPS at Dhan Mohalla, Damoriya Pull, Neela Mahal and Gandhi Camp, Jalandhar i.e OM of Civil, Electrical, Mechanical installations and Horticulture etc. for three years under Zone 1
Providing and laying of Water Supply line DI K7 at different areas of Ward 04 under Zone 7
Annual O and M estimate for Water Supply and Sewerage system of Wards 40 to 43 under Zone 4
Laying of sewer line in Bhargo Camp Zone 4A
Estimate for laying of new sewer line in various areas in Bhargo Camp Zone 4A
Estimate for Laying of New Sewer Line From Babu Jiwan Ram Chowk towards 69 inch main Sewerline, Zone 4
Replacement of Tee Connections, rising of Manholes and repair of Sewer Manholes, Road gulies in different areas Ward 22 zone 5
Estimate for Construction of New Building at Jagjeevan Ram Chowk, Storm Sewer Ward 50 under zone 4
REPAIR OF PUMP CHAMBER OHSR WATER WORKS AND PIPE LINE LEAKAGES NEW AUTOMATED WATER CONTROLLER CONTROL PANEL WATER CONNECTIONS PROVIDING AND LAYING PIPE LINE AND SLUICE VALVE ETC
Estimate for Laying of Sewerline in Green Valley Ward 52 under zone 4
REPAIR OF PUMP CHAMBER OHSR WATER WORKS AND PIPE LINE LEAKAGES NEW AUTOMATED WATER CONTROLLER CHLORINATOR WATER CONNECTIONS PROVIDING AND LAYING PIPE LINE AND SLUICE VALVE ETC
Laying of Water Supply line 100mm dia DI Line in different areas of Zone 6
REPAIR OF PUMP CHAMBER OHSR WATER WORKS AND PIPE LINE LEAKAGES NEW AUTOMATED WATER CONTROLLER CONTROL PANEL CHLORINATOR AND SLUICE VALVE ETC