Loading…
Loading…
17,252 results • Latest
STRENGTHENING OF ADDITIONAL INFRASTRUCTURE FACILITIES TO EXISTINVG KGBV BUILDING AT RAJOLI (V AND M) IN JOGULAMBA GADWAL DISTRICT UNDER NABARD RIDF XXIX
Estimate for Providing of Temporary lighting in view of Vinayaka Chavithi Festival 16) Immersion of Idols at various ponds and lakes and approaching main roads in 263,265,266 and 267 divisions of Patancheru Circle-46, Serilingampally Zone, CMC (Rs.5,37,300/-) (2026-27)
Removal of water stagnation with injection borewell and construction of water harvesting pit at Before PV Narsimhaa rao Auditorium at MPP Office premises at Ward No. 266 Patancheru Circle-46, SLP Zone CMC (Rs.6.00 Lakhs (2026-27)(725384)(Recall)
Providing of Artificial Ponds for Immersion of Ganesh Idols at Solitaire school, Narsabikunta, Pallecheruvu in Attapur Circle 20, GHMC (Ganesh Festival-2026)(Rs.2.70 Lakhs)
Laying of CC Road From P No:30 to Devi Shankar House in New Green City at Budvel in Rajendra Nagar Division No.120 at Rajendra Nagar Circle-19, GHMC.(Rs. 28.45 Lakhs)
Providing 1.5 TR Split A.C Unit to Guest Houses
Procurement of Consumables for CPRMS Medical card Printer.
Removal of water stagnation by laying of CC Roads at Godhavari homes internal road in ward-286 Quthbullapur, Jeedimetla Circle - 55, Quthbullapur Zone, CMC. (Item no.1) (Completion Period 2 Months)
Engaging of Outsourcing personals for 91 Nos of SFAs pertaining to Charminar Zone, GHMC. w.e.f 01-07-2026 to 31-03-2027
Annual Maintenance to Roads under (R And B) Section, Dornakal for the year 2026-27 in Mahabubabad District
Laying of CC Road and Construction of CC Drains in Ward No.17 of Chennur Municipality under TUFIDC Assistance.
Laying of UGD in Ward no 9 of Aliyabad Municipality Under Municipal General Funds 2026-27
Maintenance of greenery at Oil Seed Park and Hari Vihar Park in Himayathnagar, Khairtabad Circle-35, Khairtabad Zone, GHMC for a period of one year (12 Months)
Improvements to Shyama Vihar and V.B.C Cottages
Drilling of 6.5 inch dia Borewell, Supply, Delivery and erection of suitable submersible pump set with accessories at LIG 656 Park in Ameenpur Circle-47, SLP Zone, CMC during the year 2026-27 (Item.10)
Providing internal painting to corridors, staircases of all floors to the DGP Office at Lakdikapul, Hyderabad
Laying of C.C Road and Construction of C.C Drain from H.No 30-2-925 to 30-2-921 at Nehru nagar, Madikonda in Division no 64 Reserved for (Reserved for ST)
Annual Maintenance to Roads under (R and B) Section, Kesamudram for the year 2026-27 in Mahabubabad District
Providing Underground Storm Water Drain (UGD) from the Jersey side to the existing GHMC storm water drain (from backside of the 33 KV Substation) at IP Uppal, Medchal Malkajgiri Dist (Under IALA Funds)
Annual Maintenance to Roads under (R and B) Section, Gudur for the year 2026-27 in Mahabubabad District (Reserved for ST)
Restoration of damaged CC Road at Gandhi statue road in ward-286 Quthbullapur, Jeedimetla Circle - 55, Quthbullapur Zone, CMC. (Item no.2) (Completion period 2 Months)
Supply of ball valve and butterfly for Fire fighting system, AC system and Air system of CAM division/Stage-I/BTPS
Supply of first aid fire hose reel, high pressure rubber braided hose, SS shut off nozzle and Water monitor for Fire fighting system of CAM Division /Stage-I/BTPS
Transportation of paddy and gunnies as entrusted by TGSCSCL from time to time under paddy procurement operations from various Paddy purchase centers ,storage points,Buffer godown,Wagons to various Paddy purchase center, Buffer godowns, Rice mills and other godowns within and outside the district for KMS 2025-26 Rabi Season and KMS 2026-27 Kharif Season from 01.04.2026 till 31.03.2027, Sulthanabad Sector
Providing 9.10 M PSCC Poles with Three Line Conductors for Street Lighting from Centre for Distance and Online Education (CDOE) to Administrative Building at KUC, Warangal
CONSTRUCTION OF SHED FOR MAHILA COMMUNITY HALL IN KASHIKUNTA IN DIV NO.41 (GENERAL FUNDS 2025-26) 3rd call
Emergency Repairs to Shamshabad to Kollapadakal road from km 22/0 to 25/00 in Rangareddy District
Package No.I - Restoration of Gravel Road, CC Road and BT Road Patch works in Adilabad Municipality, Est.Cost Rs.25.00 Lakhs, SDRF / Disaster Management
Bore Motors repairs works at various locations in Shankarpally Municipality. Under Municipal General Funds. 1st Recall
Providing Minor repairs to STBH Thimmaraopeta (V) Enkoor (M) of Khammam District with an estimated cost of Rs.9.67 Lakhs
Providing Minor repairs to AHS Boys Khammam at Konijerla (V) Konijerla (M) of Khammam District with an estimated cost of Rs.8.77 Lakhs
Supplying and Errection on hire basis Pipe pendals, Public addressing sound system, Side walls, Generator, laying of green mats for arrangements at Salehnagar Eidgah during Bakrid festival 2026 of MCK Est. cost of Rs. 4.98 lakhs under MGF
Supplying and Errection on hire basis Pipe pendals, Public addressing sound system, Side walls, Generator, laying of green mats for arrangements at Sapthagiri Colony Eidgah and Alugunur Eidgah during Bakrid festival 2026 of MCK Est. cost of Rs. 2.85 Lakhs under MGF
Supplying and Errection on hire basis Pipe pendals, Halogen lamps, Public addressing sound system, Side walls, Generator, laying of green mats at Municipal office backside of Kalabharathi Eidgah during Bakrid festival 2026 of MCK Est. cost of Rs. 1.20 Lakhs under MGF
Construction of Urdu Ghar near Theenkhani Chowrastha in Jagitial Municipality of Jagitial District Est.Cost.Rs.75.00 Lakhs
Drilling of 6.5 inch dia Borewell, Supply, Deliveryy and errection of suitable submersible pumpset with accessories at Gandhi Park, Alkapur in Narsingi Circle-45, SLPZ, CMC (GHMC) during the year 2025-26 (Item.7)
Drilling of 6.5 inch dia borewell, supply delivery and errection of suitabe submersible pumpset with accessories at Venkateshwara nagar colony Park I in Serilingampally Circle-49, SLPZ, CMC (GHMC) during the year 2025-26 (Item.7)( 1st Recall)
Drilling of borewell, Supply, delivery and errection of suitable pumpset with accessories at Netaji Park, Alkapur in Narsingi Circle-45, SLPZ, CMC (GHMC) during the year 2025-26 (Item.6){1st Recall)
Laying of BT Road in Durganagar WARD NO (09) in Adilabad Municipality, Est.Cost Rs.41.00 Lakhs, UIDF 2024-25 Grant
Manufacture Supply and Delivery of SWG Pipes from AS and TS for the month of May-2025 to November-2025 at Hydernagar Stores Sub Division-II under Central Stores Division. Estimate No.EST-HDN-202600032
Manufacture, Supply and Delivery of SWG pipes for AS and TSs of Sanctioned estimates for the month of June-2025 to November-2025 to the departmental Stores at Sahebnagar under Central Stores Division. Estimate No.EST-SBN-202600021
ER to the PWD Road to Parvathagiri via Upperpally at Km 1/4-8 in Warangal District.
Laying of SWD at water logging point Near Agro industries at Mahendra nagar under Ganesh nagar-284, Jeedimetla Circle - 55, CMC (Item no.3) (Completion period 1 Months) (2nd Recall)
Renovation and Maintenance of New Prashanth Nagar park in Miyapur ward-240 Miyapur Circle-48, Serilingampally Zone, CMC during the year 2026-27 (Item.4)
Providing of arrangements for Eid Milad programme at Jyothibha Phule ground of MCK Estimated cost of Rs. 4.85 lakhs under MGF
Laying of CC road from Good Shepard School to Pochamma temple and from Navabharati School to 15-171 at Vivekananda Nagar of Ward No 128-Chintal, Gajularamaram Circle,GHMC (New Chintal Circle-54, QBZ, CMC) (Item no.1) (Completion period 2 Months) (2nd Recall)
ER to Muripirala Zaffferghad road at Km 7/2-6 in Warangal District.
Repairs to the damaged SW catchpits over the SW drain from at various locations in Adikmet-163, Baghlingampally-164 wards of Musheerabad Circle-41, Sec-bad Zone, GHMC. (Rs. 8.00 Lakh)
Maintenance of existing Eucalyptus clonal and miscellaneous Block plantations at GDK 1 and 3 and GDK 2 Incline Group and Bungalows Area in RGI area during 2026 27
Renovation and Maintenance of New Huda Colony Park New Ayyappa Temple Kaman RB Nagar Kothwalguda Ward No 119 Circle-18 Shamshabad Shamshabad Zone GHMC during 2026-27