Loading…
Loading…
1,338 results • Latest
OVERHAULING OF TURBO-GENERATOR THRI TYPE OF UNIT-5, 210 MW, AT BAKRESWAR TPP BkTPP, WBPDCL, WEST BENGAL SAY JOB-A AND OVERHAULING OF TURBOGENERATOR THRI TYPE OF UNIT-3, 210 MW, AT BAKRESWAR TPP BkTPP, WBPDCL, WEST BENGAL SAY JOB-B.
Package 1 Set -MACHINING OF 1 No SEAL BODY AIR SIDE 0139350105000 SH 2 MACHINING OF 1No SEAL BODY H2 SIDE 0139350105100 SH 2 WITH BHEL MATERIAL
Forming of CS Dished Ends against SO Nos. 8117, 8136, 8158, 8159, 8160, 8170, 8194, 8195, 8207 and 8208 at vendor works with free issue materials Total Qty. 21 Nos.
Site establishment services for the project Upgradation of SRGM repair facilities at Naval dockyard ND Mumbai to cater for repair-cum-test facilities for upgraded SRGMs Maharashtra, India.
Setting up a Grid Connected Rooftop Solar PV Project with Battery Energy Storage System RTS and BESS on BOOM basis
FABRICATION OF TEST CONE FOR OUTLET PIPE
FABRICATION OF TEST CONE FOR INLET PIPE
Re-construction of damaged compound wall at Admin 2 gate in BHEL RC Puram, Hyderabad
7-BP9049113842-24VDC AUX CONTACTOR WITH 2NO PLUS 2NC CONTACT AS PER SG12928 REV.06. ITEM 001
Fabrication of Structure Bolted and Welded type against S.O. No. 8170 inside premises of BHEL-HPVP, Visakhapatnam with free issue materials Total Weight 370 MT
Works Contract for Engaging an agency for fabrication activities like Assembly, Welding and grinding works, etc. of Panels of NTPC LARA SO NO.8217
BOTTOM SHAFT FORGING AS PER DRAWING NO. 32540124701 REV.01, SPECIFICATION ASTM A668 CLASS E, QA PLAN QSP/HG/104 REV.01 AND TPQR HGG-2531.
AIR GAP MONITORING SYSTEM
2-BP9049113877-110VDC AUX. CONTACTOR WITH 2NO PLUS 2NC CONTACTS AS PER SG12928 REV 06 ITEM 004
3-BP9049113893-220VDC AUX. CONTACTOR WITH 2NO PLUS 2NC CONTACTS AS PER SG12928 REV 06 ITEM 006
4-BP9049113907-110VAC AUX. CONTACTOR WITH 2NO PLUS 2NC CONTACTS AS PER SG12928 REV 06 ITEM 007
5-BP9049113915-240VAC AUX. CONTACTOR WITH 2NO PLUS 2NC CONTACTS AS PER SG12928 REV 06 ITEM 008
6-BP9049114490-ADD ON BLOCK OF 2NO PLUS 2NC CONTACTS AS PER SG12928 REV 06 ITEM 012
1-BP9049113850-30VDC AUX. CONTACTOR WITH 2NO PLUS 2NC CONTACTS AS PER SG12928 REV 06 ITEM 002
Major inspection of Generator as per SOW at Unit 1, Ms TGGENCO- Bhadradri TPS 270MW
ARGON 90 PER PLUS CARBON DIOXIDE 10 PER GAS. 1. Argon 90 PER PLUS CO2 10 PER Mixture ACM gas to be supplied in BHEL-HPVP cylinders. 2. Staggered Delivery as per BHEL Requirement. 3. PQC - Collection of Empty Cylinders from BHEL HPVP MM-Stores and Delivery of Filled Cylinders within 72 Hours from intimation time. 4. Volume of gas required in each cylinder is 7 Cubic Meter. Cylinder Pressure - 150 Kgcm2 at the time of delivery.
TRAY ASSEMBLY FOR DEAERATOR SERRATED AND PERFORATED TYPE, Material SS304 As per Drg. No. 2-163-10-00031 and TDC No. HE 51493 Rev. No. 01.
TRAY ASSEMBLY FOR DEAERATOR AS A PACKAGE BASIS for NON NTPC Projects.
TRAY ASSEMBLY FOR DEAERATOR SERRATED TYPE Material SS304 As per Drg. No. 2-163-10-00032 Rev.0 and TDC No. HE 51493 Rev. No. 01.
COMPLETE MACHINING OF TOP BRACKET ARM ASSY-RATLE 205 MW PROJECT
COMPLETE MACHINING OF TOP BRACKET ARM ASSY-POLAVARAM PROJECT
EXECUTION AND HANDING OVER OF CIVIL WORKS OF OPEN AND CLOSED STORE ALONG WITH APPROACH ROAD TO STORES FOR PLUS MINUS 800 KV , 6000 MW HVDC BHADLA, RAJASTHAN
O And M of RO plant of surface Treatment shop at 03 block FY 2026-27
Turnkey Major overhauling of BHEL make compressors and Drive Turbines installed at IOCL Gujarat Refinery for DHDS Unit along with BOP activities.
For the work of Erection and Commissioning of Construction Power Supply, Area Lighting and Yard Lighting - including supply of materials as specified in the tender specification - under Package-A and Operation and Maintenance of the same under Package-B at 1X800MW Darlipalli STPP Stage-II, Sundargarh dist, Odisha
Turnkey Major overhauling of BHEL make compressors and Drive Turbines installed at IOCL Gujarat Refinery for CRU Unit.
VMS CROSS CONNECTION CABLE ASSEMBLY- 1set Means 1000 Nos as per RFQ
SET OF FABRICATED ITEMS FOR CLH TYPE 1195 AS PER DRG. NO. 0-80-999-99024 00 AS PER BOM DRG. 3-80-999-97159 00 AS PER ANNEXURE-1195 REV-01.
SEMI-FURNISHED, WIRED CONTROL and RELAY PANEL FOR OUTDOOR CIRCUIT BREAKER WITH FRONT AND REAR DOOR AS PER ANNEXURE-A, 1 STEEL PVC RATIO 1 IS TO 170 AT BASE RATE OF RS. 64.65 PER KG OF C. R. COIL 1 MM S. NO. 27 ISSUED BY JPC AVERAGE STEEL RATE KOLKATA, DELHI, MUMBAI and CHENNAI DTD. 06.04.2026 2 PVC FACTOR OF COPPER IS 1 IS TO 7.1 AT BASE RATE OF BME COPPER BILLET PRICE, TOTAL VALUE AS RS. 1242.49 KG.
RC FOR FABRICATED STATOR FRAME FLAME PROOF TUBULAR WITHOUT COOLING TUBE TO VARIOUS DRAWINGS ON LABOUR BASIS
Contracts for Renovation works of A-76 Quarter of BHEL-HPVP, Visakhapatnam-Township
1.5 SQ.MM PVC INSULATED SINGLE CORE CABLE FR-LSH AS PER TECHNICAL SPECIFICATION SG12973, R00. COPPER PVC FACTOR 1 0.014 WITH BME BENCH MARK COPPER BILLET PRICE, TOTAL VALUE A RS 1268.989 PER KG. NOTE VENDOR CODE and SUPPLY DATE ONLY TO BE PUNCHED STICKER TO BE PUT ON PACKET OF 100 MTR IN ADDITION TO TECHNICAL INFORMATION IF ANY. BP9909478080
2.5 SQ.MM PVC INSULATED SINGLE CORE CABLE FR-LSH AS PER TECHNICAL SPECIFICATION SG12973, R00. COPPER PVC FACTOR 1 0.023 WITH BME BENCH MARK COPPER BILLET PRICE, TOTAL VALUE A RS 1268.989 PER KG. NOTE VENDOR CODE and SUPPLY DATE ONLY TO BE PUNCHED/STICKER TO BE PUT ON PACKET OF 100 MTR IN ADDITION TO TECHNICAL INFORMATION IF ANY. BP9048108624
Annual Maintenance Contract for Miscellaneous Machine foundations, Masonry works and Painting works in Factory Area and Administrative Building - for a period of 24 months
Exterior painting work of annexes/offices/ buildings and other structures inside factory area
Assistance in Repair and Maintenance of Foundry Machines in 04, 05 Blocks and Pattern Shop FY 2026-27
Package 1- consist of Item 1-Item 3 Item 1 TSI SENSORS and ACCESSORIES Qty 3.5 SET Plus Item 2 SITE ERECTION SUPERVISION AND COMMISSIONING Qty 7 SET Plus Item 3 TSI SENSORS and ACCESSORIES Qty 1 SET
CONDUCTOR ELECTRON BEAM IRRADIATED CROSS LINKED THIN WALLED FLEXIBLE ELASTOMERIC INSULATED AND SHEATHED CABLE FOR WORKING VOLTAGES
CONTINUOUS ONLINE PARTIAL DISCHARGE MONITORING SYSTEM
Operation of 11kV main receiving station at 15/83 building and its associated sub-stations inside the factory area for a period of two years.
J20431102101-BLANKING TOOL 204311021
J20431101901-COMPOUND TOOL 204311019
Transportation of 2 ODCs by 2 Hydraulic Trailers
RATE CONTRACT FOR SUPPLY OF TM4907, TM4903 CABLE LEAD
Erection and Commissioning of Boiler and its auxiliaries, Stack and BOP systems along with Material Handling at Steam Generation Package for Bina Petrochem and Refinery Expansion Project BPREP of Bharat Petroleum Corporation Limited BPCL, Bina, Madhya Pradesh, India. enquiry No. T0AZX00015_NIT_99788, 2026_BHEL_61432_1 dated:20.05.2026 and as per specification of tender documents.