Loading…
Loading…
930 results • Latest
Scrap Lying At C/S Verka, Item- 1/C PVC 400 Kg., 2/C PVC 1910 Kg.,4/C PVC 7296 Kg., 3/C XLPE 18419 Kg., 4/C Alum. Cable scrap 1858 Kg., 4/C Alum. Cable scrap 2516 Kg., Al. Seal scrap with Lashwire 40 Kg.,11KV 1/C XPLE Cable scrap ABC 80 Kg.,1/C XLPE 364 Kg., LT ABC Cable scrap with insulation 330 Kg.,Total- 33213 Kg.
M - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. M1 to M 52, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. M 51 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY KOTKAPURA. Three Phase Copper Wound T/F 98, Indicative Design Wt. of Core and Winding KG 6480.3 Three Phase Aluminium Wound T/F 66, Indicative Design Wt. of Core and Winding KG 7374.5 Single Phase Copper Wound T/F 3, Indicative Design Wt. of Core and Winding KG 182.1 Total No. of T/F 167, Total wt. in KG 14036.9
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Nabha 0.15 MT intermangled. Quantity in MT - 2.564
Aluminium Conductor Steel Reinforced scrap, Lying at Central Store Kotkapura. Quantity in MT - 3.215
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Moga. Quantity in MT - 2.618
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Shri Muktsar sahib. Quantity in MT - 3.672
Aluminium Conductor Steel Reinforced scrap, Lying at Central Store Ferozepur 0.016 MT intermangled. Quantity in MT - 4.4
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Ropar. Quantity in MT - 2.565
Aluminium Conductor Steel Reinforced scrap, Lying at Central Store Mohali. Quantity in MT - 9.42
Aluminium Conductor Steel Reinforced scrap, Lying at Central Store Bathinda 0.026 MT intermangled. Quantity in MT - 3.982
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Mansa. Quantity in MT - 8.554
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Bhagta Bhai Ka 0.026 MT intermangled. Quantity in MT - 2.186
Aluminium Conductor Steel Reinforced scrap, Lying at Outlet store Fazilka. Quantity in MT - 7.601
M - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. M1 to M51, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. M 46 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY KOTKAPURA. Three Phase Aluminium Wound T/F 232, Indicative Design Wt. of Core and Winding KG 17549.1. Total No. of T/F 232, Total wt. in KG 17549.1
M - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. M1 to M51, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. M 51 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY KOTKAPURA. Three Phase Copper Wound T/F 48, Indicative Design Wt. of Core and Winding KG 2981.3 Three Phase Aluminium Wound T/F 61, Indicative Design Wt. of Core and Winding KG 4059.7. Single Phase Copper Wound T/F 4, Indicative Design Wt. of Core and Winding KG 240.8 Total No. of T/F 113, Total wt. in KG 7281.8
M - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. M1 to M51, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. M 45 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY KOTKAPURA. Three Phase Aluminium Wound T/F 144, Indicative Design Wt. of Core and Winding KG 10905.9. Total No. of T/F 144, Total wt. in KG 10905.9
L - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. L-1 to L-67, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. L 19 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY FEROZEPUR. Three Phase Copper Wound T/F 15, Indicative Design Wt. of Core and Winding KG 1127 . Three Phase Aluminium Wound T/F 60, Indicative Design Wt. of Core and Winding KG 11354. Single Phase Copper Wound T/F 2, Indicative Design Wt. of Core and Winding KG 124 . Total No. of T/F 77, Total wt. in KG 12605
E-Waste Scrap Meter scrap, Lying at ME LAB Patiala Electronic Meter Scrap/E-Waste. Quantity in Kg - 2456
E-Waste Scrap Meter scrap, Lying at ME LAB Ropar Electronic Meter Scrap/E-Waste. Quantity in Kg - 1450
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 02 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 200, Indicative Design Wt. of Core and Winding KG 15000. Total No. of T/F 200, Total wt. in KG 15000
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 04 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 600, Indicative Design Wt. of Core and Winding KG 44852. Total No. of T/F 600, Total wt. in KG 44852
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 03 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 562, Indicative Design Wt. of Core and Winding KG 41400. Total No. of T/F 562, Total wt. in KG 41400
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 5 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Copper Wound T/F 204, Indicative Design Wt. of Core and Winding KG 12117. Three Phase Aluminium Wound T/F 318, Indicative Design Wt. of Core and Winding KG 19362. Total No. of T/F 522, Total wt. in KG 31479
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 06 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 250, Indicative Design Wt. of Core and Winding KG 73285. Total No. of T/F 250, Total wt. in KG 73285
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 07 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 215, Indicative Design Wt. of Core and Winding KG 63824. Total No. of T/F 215, Total wt. in KG 63824
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 08 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 578, Indicative Design Wt. of Core and Winding KG 63135. Total No. of T/F 578, Total wt. in KG 63135
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 10 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 501, Indicative Design Wt. of Core and Winding KG 54928. Total No. of T/F 501, Total wt. in KG 54928
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 09 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 337, Indicative Design Wt. of Core and Winding KG 68974. Total No. of T/F 337, Total wt. in KG 68974
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-10, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 01 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALOUT Burnt transformers. Three Phase Aluminium Wound T/F 800, Indicative Design Wt. of Core and Winding KG 59316. Total No. of T/F 800, Total wt. in KG 59316
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 74 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MANSA. Three Phase Copper Wound T/F 11, Indicative Design Wt. of Core and Winding KG 987 . Three Phase Aluminium Wound T/F 74, Indicative Design Wt. of Core and Winding KG 17655. Total No. of T/F 85, Total wt. in KG 18642
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 83 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY BARNALA. Three Phase Aluminium Wound T/F 250, Indicative Design Wt. of Core and Winding KG 31236. Total No. of T/F 250, Total wt. in KG 31236
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 88 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY BARNALA. Three Phase Aluminium Wound T/F 250, Indicative Design Wt. of Core and Winding KG 31311. Total No. of T/F 250, Total wt. in KG 31311
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 94 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MANSA. Three Phase Aluminium Wound T/F 76, Indicative Design Wt. of Core and Winding KG 23499. Total No. of T/F 76, Total wt. in KG 23499
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 102 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY NABHA. Three Phase Copper Wound T/F 3, Indicative Design Wt. of Core and Winding KG 243. Three Phase Aluminium Wound T/F 25, Indicative Design Wt. of Core and Winding KG 4133. Single Phase Copper Wound T/F 1, Indicative Design Wt. of Core and Winding KG 63.Total No. of T/F 29, Total wt. in KG 4439
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 107 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MALERKOTLA. Three Phase Copper Wound T/F 2, Indicative Design Wt. of Core and Winding KG 182. Three Phase Aluminium Wound T/F 142, Indicative Design Wt. of Core and Winding KG 19343. Total No. of T/F 144, Total wt. in KG 19525
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 121 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY MANSA. Three Phase Aluminium Wound T/F 211, Indicative Design Wt. of Core and Winding KG 24257. Total No. of T/F 211, Total wt. in KG 24257
C - Three phase Copper/ Aluminium and single phase copper/ Aluminium wound Damaged Distribution Transformers As Per Actual Site Condition NOTE : Before lifting of Transformers From Lot no. C-1 to C-144, HT/LT copper winding coils of transformers shall be mutilated by the purchaser. Lot No. Lot No. C 50 Three/Single phase Copper/Aluminium Wound Damaged Distribution Transformers Without oil along with accessories as per actual site condition lying at TRY BARNALA. Three Phase Aluminium Wound T/F 125, Indicative Design Wt. of Core and Winding KG 34598. Total No. of T/F 125, Total wt. in KG 34598
Lot No.F-11 Cu./Al. Wd. Damaged Amorphous Core DS T/F at TRY FEROZEPUR With Acessories Without Oil Total No. of TFs : 1 TOTAL INDICATIVE WT. OF CORE And WINDING IN KG.:- 650
Lot No.F-12 Cu./Al. Wd. Damaged Amorphous Core DS T/F at TRY MOHALI Lifting from TRY ROPAR With Acessories Without Oil Total No. of TFs : 2 TOTAL INDICATIVE WT. OF CORE And WINDING IN KG.:- 98
Lot No.F-09 Cu./Al. Wd. Damaged CRGO DS T/F at TRY MOHALI Lifting from TRY ROPAR With Acessories Without Oil Total No. of TFs : 294 TOTAL INDICATIVE WT. OF CORE And WINDING IN KG.:- 55609
E-waste scrap/Meter scrap, Lying at ME LAB ROPAR Electronic Meter Scrap/E-Waste. Quantity in Kg - 3270
E-waste scrap/Meter scrap, Lying at ME LAB ROPAR Crushed Meter Scrap/E-Waste. Quantity in Kg - 121
Damaged DS T/F Core and Tank at TRY-III,Verka, With Acessories Without Oil, Total No. of TFs :6,TOTAL INDICATIVE WT. OF Core and Tank IN KG.:-1287
Damaged DS T/F Core and Tank at TRY-Pathankot, With Acessories Without Oil, Total No. of TFs :7,TOTAL INDICATIVE WT. OF CORE And TANK IN KG.:-1897
Damaged DS T/F Core and Tank at TRY-Jagraon, With Acessories Without Oil, Total No. of TFs :71,TOTAL INDICATIVE WT. OF CORE And TANK IN KG.:-22458
Damaged DS T/F Core and Tank at TRY Hoshiarpur, With Acessories Without Oil, Total No. of TFs :63,TOTAL INDICATIVE WT. OF CORE And TANK IN KG.:-16549
Damaged DS T/F Core and Tank at TRY Nakodar, With Acessories Without Oil, Total No. of TFs :30,TOTAL INDICATIVE WT. OF CORE And TANK IN KG.:-2610
Damaged DS T/F Core and Tank at TRY-II,Verka, With Acessories Without Oil, Total No. of TFs :25,TOTAL INDICATIVE WT. OF CORE And TANK IN KG.:-7375
Damaged DS T/F Core and Tank at TRY-Batala, With Acessories Without Oil, Total No. of TFs :27,TOTAL INDICATIVE WT. OF CORE And Tank IN KG.:-8767