Loading…
Loading…
8,160 results • Latest
Road construction work by RCC drain and CC in the damaged/unpaved lanes from Anil house to Ramashankar house, from Ramji to Vinod house and from Nihal house to Dharamveer and in the link lanes of Gajendra, Bablu Champaram Ward No. 45 Datuji Khurd New
Beautification work of the pond located in Ward No. 50 Hundawala Bagh.
Road construction work by RCC drain and CC from Pandit to Ramesh in the unpaved street of Valmiki Basti in Ward No. 19 Kanhaiya Nagar.
RCC drain/drain and road construction work through CC in the damaged and unpaved streets form Khajan to Puran, Ishwari to Hakim Singh, Bediram to Makhan house, Radha Kishan to Rampal house, and Tarachandra to Bhuvnesh, in Ward No. 45 Datuji Khurd.
Construction of a road and drain from the house of Ajay Kumar Jha (Mithila Sadan) to the T-point in Shlok Vihar Society, Takrohi (under Shaheed Bhagat Singh Ward No. 1).
Construction of brick-on-edge/Kharanja work on the middle berm from km 31.200 to km 39.700 of Hathras Branch and Parallel Hathras Branch.