Loading…
Loading…
84,889 results • Latest
silt clearance And Scraping work of Bewar Feeder Km. 15.000 To Km. 34.000
Ward No. 12 ramleela tilla me vibhin sathlo par shatigrast channel nali, rcc puliya evam shatigrast marg ke sudhar ka karya
Construction of a damaged boundary wall behind the commerce room at A.N.D. College, Harsh Nagar, falling under Zone-4, Ward 37 (Ashok Nagar).
UCHCH PRIMARY SCHOOL COMPOSITE 2 ME PANI PINE HETU STAND POST KA NIRMAN AND RANGAYI POTAYI KA KARYA
Construction of the new Sona-Balipur road in the 2026-27 financial year.
VIKAS KHAND BHALUANI KE GRAM GADWA ME MUNNA BABA KE GHAR SE DEEH BABA KE STHAN TAK CC ROAD KA NIRMAN KARYA
Silt Clearance scraping of gogli mr.from km 0.00 to 8.865 km.
Ward No. 11 stith Kadarwala, Krishnapuri eavam Prempuri main Vibhin sathano per nali, puliya channel eavam sadak maramt ka karye
Ward No. 09 abkari ramleela tilla me vibhin sathlo par shatigrast channel nali, rcc puliya evam shatigrast marg ke sudhar ka karya
Janpad Nyayalya Rampur me Janpad Nyayadheesh evam apar janpad nyayadheesh ke nyayalaya kakshon evam vishram Kakshon me AC isthapna ka karya
Construction of 100 mtr. wide road Between sector 18 and 20 from ch. 3.68km. to 5.22km. for connecting to RPS-09 Pocket 9B in YEIDA.WC-01
VIKAS KHAND DEORIA GRAMSABHA NARAYANPUR ME AJAY SINGH KE GHAR SE HRIDYA KE GHAR HOTE HUE GOVIND KE GHAR TAK CC ROAD NIRMAN KARYA
Mohalla Nagpur mein Ambedkar park mein farsh ka Nirman karya
VIKAS KHAND DEORIA GRAM GUDDI CHAKIYA BARIPUR ME MAIN ROAD SE SUBHAS KUSHWAHA KE GHAR HOTE HUE MAA SINHASANI DEVI MAHILA MAHAVIDYALAY TAK CC ROAD NIRMAN KARYA
Ward No. 05 Valmiki Basti, Jolly Road ke nikat colony main eavam Kukra main Vibhin sathano per nali eavam puliya channel maramt ka karye
Construction of an RCC drain with a cover from Mazhar Samosa Wala shop to Hotel Taj in Sarai Shahji Ward 43
Ward No. 04 vehlna vibhin sathlo par shatigrast channel nali, rcc puliya evam shatigrast marg ke sudhar ka karya
VIKAS KHAND BHALUANI GRAMSABHA TENUA CHAUBEY ME BELDARH KATHINAIYA MAIN ROAD SE MANOJ CHAUBEY KE GHAR TAK CC ROAD NIRMAN KARYA
Ward No. 03 dakshini khalapar me vibhin sathlo par shatigrast channel nali, rcc puliya evam shatigrast marg ke sudhar ka karya
Kabool pura Dal per mini tubewell ki sthapna ka karya mai kothari
Silt Clearence scraping from km. 0.000 to km. 16.930 of Shamipur Dy. for the Year 2026-27
Silt Clearance and scraping work at Nayan Dy Km 0.000 to 12.430 and Lauhrai Minor Km 0.000 to 1.408
TAHSIL PARISAR SALEMPUR KE PRANGAN ME LEKHPAL SANGH BHAWAN KA NIRMAN KARYA
Ward No. 02 kamalnagar kukra me Vibhin sathano per shatigrast channel nali eavam puliya channel maramt ka karye
Patch Repair Work of bituminous Road On Pakdi Dy. KM 10.700 To KM 13.200 (Left Bank)
Construction of a CC road and drain in Ward 43, Sarai Gariba, stretching from Alam Dairy to the house located behind Qazi Farhan residence
WARD NO 4 ME SHAKH SHAH SAMMAN BABA SE KOT GHAT TAK SADAK SUDHAR KA KARYA
Construction work for the external water supply connection at the academic building of the Autonomous State Medical College Sonbhadra
VIKAS KHAND BHAGALPUR KE GRAM SABHA INDAULI ME JITENDRA SINGH KE BAGICHE SE VINOVA JI KE KHET HOTE HUE RAILWAY LINE TAK KHADANJA KARYA
Special repair work of the Ramala-Tanda Road to Boudha link road for agricultural marketing facilities in the sugar mill area in Baghpat District under the F.Y. 2026-27
Ward No. 01 kamalnagar kukra me Vibhin sathano per shatigrast channel nali eavam puliya channel maramt ka karye
VIKAS KHAND BHAGALPUR ME BARTHA MADOPAR PITCH MARG SE HOTE HUE MADIPAR MISHRAULI TAK KHADANJA KARYA
Patch Repair Work of bituminous Road On Karahi Dy. KM 1.220 To KM 5.200 (Left Bank)
VIKAS KHAND LAR KE GRAM MAJHWALIA ME CHHATH GHAT SE NEMA TAL KI OR KHADANJA NIRMAN KARYA
Repairing and Painting of VRB at Km 33.800 of Saryu Link Channel
Nagar Palika Parishad mein 39 August digital Cameron ki aapurti sahit sthapna ka karya
New Construction of the Sihori Dhiramai route spanning from the Bamba culvert to the LGC track Hazara Canal via the Garhwala route during the 2026-27 financial year.
Construction of CC roads and nali from amjad lovel house to shaklapuri road for hanuman nagar at ward no. 08
New Construction work of Bamoti to Chandjor Road
Drain and CC road construction work in the lane from Malik Provision Store to Abubark Masjid in Ward 17, Abdullahpur, Garhi Nai Basti.
Painting and repair work of the park opposite House No. 33/6 in Ward 18, Jagriti Vihar Sector 06.
Construction of RCC Drain along the 120 mtr wide road (RHS), from Ch. 8.48 km to Ch. 9.11 km, Sector-22E, YEA wc-02
Earth Work in silt clearance from Km 0.000 to km 18.000 of Dasna Dy.
Nagar Palika Parishad badayun mein adhishasi Adhikari ke avas ki boundary wall ka Nirman karya
New Construction work of Gram Bajhera in Sarkari Tubewell road to Kunwarpur Gaundoli Pakki Road tak
Repairing of puliya and nali from to near of meharban golden colony to near of masjid and shameem colony in front of gufran house and in front of rajiom house at ward no. 36
NAGAR PANCHAYAT SAIDPUR ME RASHTRIYA DHWAJ KI STHAPANA KA KARYA
SUPPLY INSTALLATION AND COMMISSIONING OF 27 NOS. SOLAR STREET LIGHT AT 27 DIFFERENT PLACES IN ASSEMBLY SORAON PRAYAGRAJ U.P.
75/EDC(G)/2026-27
Work involving the relocation of damaged transformers (ranging from 10 kVA to 630 kVA) installed in town areas/G P under the Electricity Distribution Division Shikarpur to appropriate locations, transporting new transformers to the site, and re-insta