Loading…
Loading…
19,781 results • Latest
Roofing of Ranigunge pattern tiles over the wooden structure renovated for the slope roof of Cottage within the campus of Lok Bhavan Kolkata during the year 2026 - 27.
Providing Security Guards for round the clock guarding at SINDHAP WATER TREATMENT PLANT and BOOSTING STATION under Darjeeling WS Pumping Scheme under Northern Mechanical Division, P.H.E. Dte.
Comprehensive Preventive and Corrective maintenance and operation contract of different type AC machines installed at different places at Mrittika Bhawan Salt Lake city Kolkata-700064 for 01(one) year
Operation and maintenance of Mobile Water Treatment unit in the District of Darjeeling under Northern Mechanical Division, P.H.E., Dte
e-tender for purchase of new Machinery spares for Rejuvenation/modification AND up-gradation AND fitting AND fixing as per Machine part number of Municipal Vehicle no WB24AU5372 Back-hoe loader as specification
Supply and Installation of Split Air conditioner at Flat no 1A and 7A of Ministers Residence, 28, Raja Santosh Roy Road, Kol - 27
Major repairing works Civil and Electrical in the Chamber of the Honble MIC and in the Chamber of the Honble MOS of School Education Department 5th Floor Bikash Bhawan Salt Lake Kolkata-91 --- Electrical Installation Work
Installation of Solar Street Light at Part area (4 nos.) UNDER BANARHAT-I GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS. (SCHEME ID-APAS/01/015/21/0005)
Operation and maintenance of Mobile Water Treatment unit in the District of Jalpaiguri under Northern Mechanical Division, P.H.E., Dte
Installation of New lifts replacing the old lifts in Mayukh Bhawan Salt Lake kolkata-91----SITC of 02 nos. G plus 4 08 passenger MRL lifts
Urgent repairing works at Blood Bank within the premises of Chandannagar S. D. Hospital under Hooghly Sub- Division No.-II, P.W.D. during the year 2026-27
Day to day operation 3 Shifts of 1 no. bed-cum-passenger lift at Baghajatin State General Hospital. For the period of 03 Three Year.
Construction of Counterfort Retaining Wall and Earth Filling at SWM site of Mal Municipalityunder the jurisdiction of Jalpaiguri Division
Patching Potholes at different stretches of road from chainage 7.0 Km to 13.55 Km of Relli-Deorali Road under Kalimpong Division PWD.
Construction of toilet attached with Press Corner at West Bengal Legislative assembly in the year 2026-27
REPARING WORK
AS PER NIT
AS PER NIT
Construction of Toilet with submarshal pump at Chadpur near Haser Ali House of Mouza -Talbhakuria, JL No-153, Plot No- 2764 within Islampur G.P under Hcpur Block-II
AS PER NIT
Sinking of 12 Nos Tubewell at Various places at Doulatpur and Malipakar Mouza under Mashalda GP
Emergent maintenance of Chandannagar Sub-Divisional Hospital Main Building, Chandannagar under Hooghly Sub- Division No.-II, P.W.D. of Hooghly Division, P.W.D during the year 2025-26 R and B Works
Security Personnel for Guarding, Scavenging, Sweeping, Cleaning and Pump Operating of UTSADHARA Project area at Barrackpore in the District of North 24 pgs. during the year 2026-27.
REPAIR WORK
Provision for Public Address PA and Digital Signage System and for Two Enquiry Commissions proposed at 4th and 5th Floor of HRBC Bhawan St Georges Gate Road Hastings Kolkata
REPARING WORK
IPM Work of Midnapore Main Canal MMC from Ch 28.1 km to Ch 31.9 km Canal No 8 from Ch 5 km to Ch 10 km Canal No 11 from Ch 0 km to Ch 1.5 km and Canal No 12 from Ch 5 km to Ch 10 km of MMC System Total working Length 15.3 Km
Repairing work of Jangalpara Gangadharpur Road from 0.00 kmp to 3.50 km (In Stretches) of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghly during the year 2026-27
AS PER NIT
IPM works of Dy 1S In between Ch 0 km and Ch 4.5 Km Dy 2A In between Ch 0 Km and Ch 3 Km Nag Canal In between Ch 0 km and Ch 2.5 Km Total Length 10 Km for Khariff Irrigation 2026 in Block Kharagpur-II PS Kharagpur L Dist Paschim Medinipur
AS PER NIT
MR to Head Regulator Gate of Watercourse-2 of R.B.M.C for during year 2026-27 Under K.L.B. Sub-division no- II of K.C Division No.-II
Repairing work of Bandhpur-Ichapasara Road from 0.00 kmp to 3.00 km In Stretches of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II in the district of Hooghly during the year 2026-27.
Up gradation of Bituminous Road by ICBP from Pravat Sangha to Kali Mandir in Ward No 12 within Burdwan Municipality.
IPM works of Dy 1A In between Ch 0 Km and Ch2.8 km Dy 1B In between ch 0 Km and ch 4.2 Km Dy 1C In between Ch 0 Km and ch 2 Km Total length 9 Km for Khariff Irrigation 2026 in Block Kharagpur II PS Kharagpur L Dist Paschim Medinipur
Engaging of man power for smooth operation of different instruments installed at Kangsabati and Kumari Dam after completion of DRIP-II upto Nov.2026 under Kangsabati Canals Division No.-II Khatra
Annual Maintenance of Computer peripherals for the Office of the Chief Engineer, South Zone, P W RoadsDte at Khadya Bhaban,11AMirza Ghalib Street, Kolkata
Restoration of blacktop surface by 80 mm thick concrete paver block in the distressed zone of Kamarkundu ROB Service road L S Tarakeswar End of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II, in the district of Hooghl
Preparation and submission of DPR and estimate for implementation of fire protection system including obtaining Fire Safety Recommendation FSR at G2 Administrative and VVPAT Building Barrackpore in the District of North 24 Parganas under BKPD 26-27
Servicing Greasing and Oiling of Sound bars, Free bars, Cyclorama and other existing bars and wings Cleaning of Cloth materials etc at Madhusudan Mancha
Providing Security Guards for round the clock guarding for Deptt. Rig Yard at Sukhani under Northern Mechanical Division, PHE. Dte
Providing Security Guards for round the clock guarding for Deptt. Stack Yard at Banarhat under Northern Mechanical Division, PHE. Dte
Up gradation of Bituminous Road by ICBP from Punjabi Para Petrol Pump to Bathanpara More in Ward No 3 within Burdwan Municipality.
Emergent work on Speed breakers on GT Road SH-13 from Ch. 610.50 km to Ch. 611.10 km under Hooghly Highway Division No.-II, P.W. Roads Directrorate during the year 2026-27.
Supplying of Security Personnel without Arms on purely emporary basis for guarding to the Office Stack yard godown and entire campus of Barrackpur Division and Barrackpur Sub-Division I II III at Gandhi Ghat Barrackpur during the year 26 27
Annual maintenance of CCTV Security, Surveillance System at Mahajati Sadan, 166 Chittaranjan Avenue
05. Construction of road from h/o Lalan Jadav to h/o Minati Manna (Part 25 )
Emergent patch repairing work from 0.770 Km to 3.70 Km of Chandannagar Nasibpur Road of Chandannagar Highway Sub-Division under Hooghly Highway Division II,P.W(Roads) Dte in the district of Hooghly during the year 2026-2027
03. Repairing of drain near Sardarpara boro pukur ( Part -16)
02. Repairing of road from h/o Shib Mandir to h/o Suvas Ganguli (Part 15 )