Loading…
Loading…
4,334 results • Latest
Supply of Lab Items for Geography Dept, 3rd call(RUSA Fund).
INSTALLATION LINK CONNECTION OF NEWLY INSTALLED TUBE-WELL WITH PIPELINE AT 12B, RAICHARAN PAL LANE IN WARD NO.59.
PROCUREMENT OF MATERIALS AND REPAIRING OF PUMP HOUSE, INTERNAL WIRING AT FATEPUR-I HDTW( ML NO 238) MOUZA, JL NO 35, PLOT NO 634, FATEPUR-II HDTW( ML NO 3) JL NO 35, PLOT NO 78 UNDER FATEPUR MOUZA, AT OLD MALDA BLOCK, MALDA.
Re-winding and Repairing of 17.5 HP 3 phase 410/ 440 V 50 Hz. pole 18-23 Amp. A.C. Submersible Motor and Pump (200 cum/h) Total Head 50 ft to 85 Ft.) of the Malda (A-I)Sub-Division, Malda.
PROCUREMENT OF MATERIALS AND REPAIR OF PUMP HOUSE, INTERNAL WIRING AT MAHAJIBNAGAR-II HDTW (ML NO 260) MOUZA, JL NO 33, PLOT NO 2137, MAHAJIBNAGAR-I HDTW (ML NO 3) JL NO 33, PLOT NO 1683 AND MALIGRAM HDTW (ML NO 265) JL NO 87, PLOT NO 990 UNDER MAJIB
Re-winding and Repairing of 12.5 HP 3 phase 410/ 440 V 50 Hz. pole 18-23 Amp. A.C. Submersible Motor and Pump (200 cum/h) Total Head 50 ft to 85 Ft.) of the Malda (A-I)Sub-Division, Malda.