Loading…
Loading…
1,31,689 results • Latest
REPAIRING OF PAVER BLOCK FOOTPATH AND PASSAGE ALONG WITH KERB AND CHANNEL FROM 19/3A BIDHAN NAGAR ROAD TO 17/1/H/1 ULTADANGA MAIN ROAD AND THEIR SURROUNDING AREAS IN WARD NO.-13
Construction of new drainage line connection for Sech Abasan near bungalow gate and inside of gate No. 2 at FF block, within Ward No. 33 under Bidhannagar Municipal Corporation.
Repair of AWC at Barani AWC (19345060111) of Debendra GP under Contai III Dev Block
CONSTRUCTION OF NEW CC ROAD AT JAGATBERH NAYEK PARA FROM RASHBIHARI HAZRA HOUSE TO UTTAM GHOSH HOUSE(APAS/01/260/283/0001)
INSTALLATION OF 10 NOS SOLAR STREET LIGHT BESIDES CONCRETE ROAD AT MAMDIPARA VILLAGE.
SUPPLY OF FURNITURE
Renovation Of Shiv Mandir Shade At Kapuria Para.
Providing Left Out Parallal distribution pipe line including Functional Household Tap Connection (FHTC) in connection with Jal Jeevan Mission (JJM and JAL SAPNA) at different habitation of Mouza-Barbenda (JL-63) under command area of Joypur Water
Repairing of Bituminous Road Works starting from Dotala Bari More to h/o-Moline Banik at Ward No.15 within Habra Municipality
CONSTRUCTION OFNEW CC ROAD ATTOWNHALL PARAFROM NETAJISANGHA TOBIDYASAGARCOACHING CENTER.(APAS/01/260/131/0003)
Upgradation, Rennovation and setting up of Minister Camp office at Banaphul Rest Shade at Kakdwip
PAINTING OF GOUR KISHORE GHOSH SQUARE AND ELEVATED DIVIDER NEAR E.M BY PASS IN WARD 32
Repair of AWC at Baghadari AWC (19345060509) of Durmuth GP under Contai III Dev Block
Supply and Installation of CCTV System to the Non-Teaching Staff Quarter, University of Kalyani (2nd Call of KU/NIET/CCTV/2024-25/01)
Special repairing of Electrical Installation works at different place of Durgapur Sub Division Hospital, Durgapur, Paschim Bardhaman.
Repair of AWC at Daisai Milan Sangha AWC (19345060506) of Durmuth GP under Contai III Dev Block
Drain Repair And Cover Slab From Peskar More To Parth Chakraborty House
Repairing of Bituminous Road at Muchipara to Bangalpara near Military Camp at Ward No. 13
CONSTRUCTION OF BOUNDARY WALL AT BHOTARPAR FP SCHOOL UNDER RAYAN - I GP
SUPPLY OF FURNITURE
Laying of branch pipeline parallel pipeline at lagda mouza to provide FHTC under Lagda water supply scheme of Purulia Division, PHE Dte.
MAINT. OF C. C. PASSAGE AT THE SLUM AREA OF MAHENDRA BANERJEE ROAD NEAR PRE. NO.- 32/H, 31/2F ETC. IN WARD NO.-129.
Repair of AWC at Uttar Benyajhi AWC (19345060404) of Kanaidighi GP under Contai III Dev Block
CONSTRUCTION OF CONCRETE ROAD FROM MAIN ROAD TO HOUSE OF RABI CHATTERJEE (LENGTH 100 METER AND WIDE 2.5 METER)
Construction of road from taki road to house of Abdul Hamid Mondal at majer para.
Construction of CC Road from H/O Barun Mazumder to H/O Rajesh Sharma at Khopalashi East Sansad within Patharghata GP (Part No. 25/170) (APAS/01/025/170/0005)
REPAIRING OF DRAIN ATBOROBAZAR FROMSETTLEMENT OFFICE TO DIPPATRAHOUSE(APAS/01/260/151/0017)
Construction of concrete road from 25/A Damayanti Nagar to 130/A Nabin Pally at Ward No. 22
Repairing of Bituminous Road Works starting from Biddut Sangha Club upto Nabadaya at Ward No.19 , 20 Within Habra Municipality.
CONSTRUCTION OF NEWROAD WITH ADJACENTDRAIN AT 1 NOSHYAMBAZAR LANE FROMCHINMOYEE CHOUDHURYHOUSE TO BITTU ROUTHHOUSE(APAS/01/260/151/0021)
Construction of CC Road from H/O Edward Tirkey to H/O Sunil Tirkey at Khopalashi East Sansad within Patharghata GP (Part No. 25/170) (APAS/01/025/170/0004)
Daily Operation mtc. of rising main of surface water supply scheme for Panradda (Zone-I to VII) W/S Scheme under Purulia Sadar Sub-Division, PHE Dte. For the period of 01.09.2024 to 31.08.2025
Renovation of LAN to the Computer Science and Engineering, University of Kalyani
Hiring of 01(One) nos. mechanized Boat with Crew
CONSTRUCTION OFNEW CC ROAD ATKALIBAZARSHIMULTALA FROMS. PAUL HOTEL TOMANA BAIRAGYAHOUSE.(APAS/01/260/131/0002)
Repairing and maintenance of 02 (two) nos. Hopper Tipper Dumper bearing no. WB07K-0879 and 0854 (Make TATA Signa 1923K) of Dist-II Garage under SWM-II for one year
Repairing of Bituminous Road Works starting from opposite of Maa Manasha Sweets upto Biddut Sangha Club at Ward No.19 , 20 Within Habra Municipality
Construction of concrete road near 2 No. Matri Pally Road at Ward No. 23
CONSTRUCTION OF NEWCROSS DRAIN AT D NSARKAR ROAD FROM SILADUTTA HOUSE TO ABHIDUTTAHOUSE(APAS/01/260/151/0020)
Reapiring of road from the Ichamoti Club to house of Kashinath Adhikary at Martinburn Road.
Cover Slab Drain At Gopal Nagar Road To Shyam Babu Ponds Lane,
Construction of CC Road from H/O Nandita Thapa to H/O Ashok Pradhan at Khopalashi East Sansad within Patharghata GP (Part No. 25/170) (APAS/01/025/170/0003)
Repair of AWC at Kanaidighi Malani Sangha AWC (19345060403) of Kanaidighi GP under Contai III Dev Block
REPAIRING OF DRAIN AT 1NO SHYAMBAZAR LANEFROM PRASANNA SADHUHOUSE TO SARBAMANGALATEMPLE WESTGATE(APAS/01/260/151/0019)
Daily Operation Mtc. of distribution system at Zone-VII Panradda W/S Scheme under Purulia Sadar Sub-Division, P.H.E. Dte For the period of 01.09.202 to 31.08.2025
MAINTENANCE OF BITUMINOUS ROAD AT S P CHATTERJEE ROAD AND KEYATALA FRONT ROAD NEAR PRE. NO. 9, 22 AND 11/29 ETC. IN WARD NO. 127.
REPAIRS TO IP AND CONCRETE PASSAGE AT 15, 19 SHANKAR GHOSH LANE, 59/E BECHU CH ST, 87/B KESHAB CH SEN ST AND OTHER PLACES IN WARDNO - 38
Repairing of Bituminous Road Works from Subhas Sangha Club upto h/o - Biswajit Dey and from h/o - Dr. Bhaskar Dutta upto h/o - Siddhyasawar Saha at Ward No. - 20 Within Habra Municipality
Repair of AWC at Kanaidighi Sangathanik AWC (19345060325) of Kanaidighi GP under Contai III Dev Block
CONSTRUCTION OF NEWCROSS DRAIN ATBOROBAZAR FROM ASHOKSHAW PAN STALL TO TAPASDASHOTEL(APAS/01/260/151/0018)