Loading…
Loading…
1,33,114 results • Latest
As per NIeT and SOQ
Construction of surface drain with cover slab and extra cover slab and renovation of Rampur F.P. School in part no.36 under Ward 11
Repairing work of vehicles WB03C 3027, WB03C-2581 by replacement of spare parts and allied work of Payloader under Asphaltum Goragacha plant.
Installation of High Mast Solar Light
Construction of boundary wall (L-195m) approach road (L-145m) land development (Area-3050 sq.m,D-1.2mtr) with illumination at Entrance in vacant space of Kalikapur 33/11 kV S/Stn under Garia Division in the Dist. of 24-Pgns(S)
Supply and Installation of 30 watt Solar street light with polesat various sites under Dalkhola Municipality -word no1,2,3,4,5,6,7,8,9, 10,11,12, 13,14, 15,16 wards under Karandighi Block, in Uttar Dinajpur District.
Operation and Maintenance of Street Light arrengement including changing of luminaries and spares parts under South Dum Dum Municipality for the period of 01.09.2026 to 31.08.2027 of Ward - 05
As per NIeT and SOQ
Installation of High Mast Solar Light
School Infrastructure Development at Dhadka Narayan Chandra Lahiri Vidyamandi at Ward No. 21,Under Asansol Municipal Corporation.
Repairing of Material Flow and Mixing System (Guide Channels) inside The Drum of Plant-II at Asphaltum Goragacha Plant.
Supply and Installation of 30 watt Solar street light with polesat various sites under Pandeypur NH12 to Karandighi Mela Math under Karandighi Constituency, in Uttar Dinajpur District.
Contract for CnI related jobs of Turbine, TDBFPs, Generator and other ancillary areas during Unit-4 Overhauling at SgTPP.
RESTORATION OF FILTER WATER PIPELINE AND RELATED WORKS NEAR 93 BECHARAM CHATTERJEE ROAD, 21/1 BRAHMA SAMAJ ROAD,3 NO RAJENDRA BANERJEE ROAD AND OTHER DIFFERENT LOCATIONS IN WARD NO 130, BR XIV
DEPLOYMENT OF FOUR NEW SMALL BUSES (47 AND 1 SEATING CAPACITY, BS-VI ENGINE) FOR BKTPP FOR FIVE YEARS
Supply and Installation of 30 watt Solar street light with poles at various sites under Hemtabad and Kaliaganj Block, in Uttar Dinajpur District.
RESTORATION WORK OF DUCTABLE AC MACHINES AT MOHIT MOITRA MANCHA IN WARD NO-05 UNDER BR-I
Installation of High Mast Solar Light
CONSTRUCTION OF CONCRETE ROAD FROM PANCHANAN MAJHI HOUSE TO MATHURA MAJHI HOUSE AT KUNDA BRAMHAPUR
MAINTAINCE AND REPAIRING WORKS OF WATER SUPPLY PIPELINE SUCH AS LEAKAGES , INSTALLATION OF PRESSURE POINT, G.I. PIPE CHANGE ETC AND ITS RELATED WORKS AT DIFFERENT LOCATIONS IN WARD NO 130, BR XIV
Repairing of Pay loader JCB/1 by replacement of Timing case,mounting bracket,flywheel ring gear etc. of engine and allied works at Asphaltum Goragacha.
Supply and Installation of 30 watt Solar street light with poles at various sites under 50-SC Maldaha AC, Malda district.
Construction of C C Road from Land of Ganesh Rajbanshi to Land of Sogen Rajbanshi Sansad V 15th FC Untied (AAP 2025-26)
Installation of High Mast Solar Light
CONVERSION OF OPEN SURFACE DRAIN INTO UNDERGROUND PIPE SEWER AT 28 JHEEL ROAD IN WD. NO. 06 UNDER BR. I
RESTORATION OF PAVER BLOCK FOOTPATH AT 265, RABINRAR SARANI FROM K.K. TAGORE ST TO R.B.N ST AND OTHER PLACES IN WARD NO-23
REPAIRING OF IPS AND CONCRETE PAVEMENTS ETC AT 23D, 23, KUMARTULI STREET, 9C, 10A ETC KASHI MITRA GHAT STEREET AND OTHER PLACES IN WARD NO-008
Supply and Installation of 30 watt Solar street light with poles at various sites under 13- SC Falakata AC, Alipurduar district.
REPAIRS TO DAMAGED I.P.S. PASSAGE AT 1, BANOMALI SARKAR STREET, 505, 507, RABINDRA SARANI AND OTHERS UTTARAN AREA IN WARD NO-009
Manufacturing, supply and fitting of tips for pug mill mixer unit for Batch Mix Plant under Asphaltum Goragacha.
Supply and Installation of 10 Mtr Solar High Mast light at various sites under 14- ST Madarihat AC, Alipurduar district.
Installation of High Mast Solar Light
REPAIRING OF PAVERBLOCK FOOTPATH AND PASSAGES AT 5/2/4, 13, RAJA MANINDRA ROAD AND 27, KALACHAND PATITUNDI LANE AND OTHER PLACES IN WARD NO 004
Installation of High Mast Solar Light
Manufacturing, Supply and fitting of Paddle Arms (LH and RH) for pug mill mixer unit of Batch Mix Plant under Asphaltum Goragacha.
REPAIRING OF IPS FOOTPATH AT 3, 81, 79 ETC INDRA BISWAS ROAD AND OTHER PLACES IN WARD NO 005
Electrification work of Suktabari Market complex Under Suktabari G.P at Coochbehar -I Block in the District of Coochbehar.
Renewal of back to back OEM support upgrade for existing Core Network infrastructure of the Directorate of Commercial Taxes, GoWB
Installation of High Mast Solar Light
Development of Solar Drinking Water Scheme by DeepTube Well with top enlargement of 150 mm dia and Installation of Solar operated pump in various point in Raiganj- phase-I, in the district of Uttar Dinajpur.
Development of Solar Drinking Water Scheme by DeepTube Well with top enlargement of 150 mm dia and Installation of Solar operated pump in various point in Raiganj Phase-II, in the district of Uttar Dinajpur.
Installation of High Mast Solar Light
RELAYING OF KERB AND CHANNELS AT 12/S, PAIKPARA ROW, 29/1A, 2/F, 17/1A, ETC KUNDU LANE AND OTHER PLACES IN WARD NO-003
Installation of High Mast Solar Light
REPLACEMENT OF BROKEN DOORS OF PRIVIES WITH ANCILLARY CIVIL WORKS AT 15, 17, GOKUL MITRA LANE UTTARAN AREA AND OTHER UTTARAN AREAS IN WARD NO-008
BOILER AND AUXILIARY EQUIPMENT WASHING WITHIN 48 HRS. OF SHUTDOWN AND BOILER GROUND FLOOR CLEANING WITHIN 07 DAYS OF SHUTDOWN DURING RESPECTIVE OVERHAULING OF UNIT-5 AND UNIT-3 AT BKTPS.
SITC of Air-Conditioning system with LCD display at Press Club, Jalpaiguri.
REPAIRING OF IPS PAVEMENTS AT 21/H/130/1, 21/H/130/4, 21/H/130/6, ETC RAJA MANINDRA ROAD AND OTHER UTTARAN AREAS IN WARD NO-003
Construction of Temporary 33/11 Sub Station at Nandakumarpur under Joynagar Division in the District of 24-Pgns(S)
Installation of High Mast Solar Light