Loading…
Loading…
8,37,282 results • Latest
KTPS VII Stage - Adm - S and S - GS Concealed electrical wiring with UPS provision for Quarter No BDE-26 at C-Colony in Colony Distribution -I Section of General Services Sub Division of KTPS-VII Stage
Construction of CC Drain with cover slabs from Chillari Baby (H) to Undavalli Ramachandra Rao (H) in Velivennu (V) of Undrajavaram (M). Est. Cost: Rs. 14.00 Lakhs
Providing of Scaffolding for erectioning ornamental designs in AE-1 section for Srivari Brahmotsavams 2026-27 in ESD-South,Tirumala
AME for miscellaneous works for wiring light points, UG cables etc, in AE-1 ANC section areas in ESD-South,Tirumala for the year 2026-27
AME for preparation of 3D, 2D ornamental designs during Srivari Annual and Navarathri Brahmotsavams and other Fairs and festivals for RBGH main circle and surrounding areas in ESD-K and P Dam,Tirumala for the year 2026-27
Preparation of LED sets, Repairs and reconditioning of LED serial sets available in AE-1 and 2 sections in ESD-South,Tirumala for the year 2026-27