Loading…
Loading…
514 results • Latest
Authority Engineer for supervision of Construction of road from Lada Sarli section of Frontier Highway NH 913 koloriang to Sarli km 168.0 to 183.40 15.40 km and Sarli to Huri km 0.00 to 78.38 78.38km on EPC mode
Consultancy services for Authority s Engineer for supervision of Construction of Intermediate Lane of Pango to Jorging Road from Design Km 40.000 to Design Km 82.060 section of frontier Highway (NH-913) (Design Length- 42.06 Km, Package-II, Greenfiel
25 KW Brushless Alternator (excluding Electronic Rectifier cum Regulator unit or Rectifier cum Regulator unit ) conforming to RDSO Specification No. RDSO/PE/SPEC/AC/0056-2014 (Rev-1) along with other accessories as per Cl No. 1.3 of specification. Note : Suspension hanger pin with split cotter and washer shall be as per RDSO Drg. No. SKEL-3943 (Rev-2)-2016 (Alt-1).
220KV GIS and Pothead yard of 186MW Tato I HEP
220KV GIS and Pothead yard of 240MW Heo HEP
Procurement of Transformers for 186MW Tato-I HEP