Loading…
Loading…
2,706 results • Latest
Contruction of Subhash bazar Paltan Hotel Shopping Complex AT WARD NO. 11
Providing, laying, jointing, testing and commissioning of 63 & 75 mm dia HDPE PE-100, PN-6 3343mtr.& 65 mm dia G.I. pipe 06mtr.& providing connection in house hold and public instiutions 57 nos with valve specials and all fitting i/c all allied civil works complete with 06 Months trial run operation & maintanace for 06 Months. and at village -Idenar-2, Block-Bijapur, District - Bijapur. under Jal Jeevan Mission - Single Village Scheme.( 2nd call )
Providing, laying, jointing, testing and commissioning of 63 & 75 mm dia HDPE PE-100, PN-6, 2500.00 mtr.& 65 mm dia G.I. pipe 192.00 mtr., & Providing of electro chlorination & Construction of room & Providing connection in house hold and public instiutions-110nos with valve specials and all fitting i/c all allied civil works complete with in 06 Months and trial run operation, maintenance for 06 Months. at village- TOYNAR, Block-Bijapur, District - Bijapur. under Jal Jeevan Mission – Single village Scheme (4th call ) Risk & cost ( PHE SOR 01.06.2020 )
Supply, installation, testing and successful commissioning of 3 Nos. Clear water Horizontal split casing centrifugal pumping sets, (50% standby), each capable of discharge 48.23 LPS, at 37.00 mtr. head coupled with suitable electric motors including entire assembly for delivery manifold along with non-return valves and sluice valves, control panel, cables, protection devices and all other civil, mechanical and electrical works including transportation and all other associated works & Design, Supply, Erection, Commissioning, Testing and trial run for 12 months from the date of charging of electriesub station suitable for feeding Power supply in 8 MLD WTP, Two nos. 33KV /0.415 KV-160 KVA capacity. outdoor Transformer (Including 100% Stand by), suitable power distribution Transformer Panel, Disc/ Pin Insulator, Lightening Arrestor, AB Switch, D.O., DP Structure ete, and lighting arrangement in sub Station along with all related complete works as per site condition with safety arrangement work completion period 06 months with 03 month testing & trial run thereafter 09 month operation & maintenance under Dallirajhara urban piped water supply scheme at DALLIRAJHARA, DISTRICT –BALOD (C.G.) 2nd Call
Rewinding and repairing of 35 Nos. different capacity and rating of LT Electric Motors of different units of Hasdeo Area
Cable network tester (Q3), Pliers, Pincers and Nippers as per IS 2615, IS 11526 (Q3), Miniature Screwdriver Set (Q3), Electrical Extension Box (V4) (Q4), Splice Closure for Optical Fiber Cables (V2) (Suitable For Non-Ribbon Fibre Splicing) As Per TEC Specification (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Ethernet Cables (Q2), Insulated pliers (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Custom Bid for Services - 200156312 Contract for Refining and Machining of TDBFP Drive Turbine Front Rear & Balance Piston Labyrinth Steam Glands for NTPC Simhadri Similar Category Operation and Maintenance Power House/Power Plant
Bathing Soap Bar (V3) Conforming to IS 13498 (Q4)
daily used items