Loading…
Loading…
5,065 results • Latest
Cons of 6L GF AC Indore Eastern Bypass from km 113.000 on NH 347BG near Simrol/Datoda end at km 139.630 Nanded PKG2 of Indore dist n Rehab n upgrade of exist NH52 from km 18.000 Khandwa to km 27.000 Ahilyapur from 4to6L PKG2 of Indore in MP on HAM
Construction of 6L GF AC Indore Eastern Bypass starting from DC KM 64.000 near Pirkaradiya village and ending at DC KM 113.000 on NH 347BG near village Simrol/Datoda PKG 1 of Indore and Dewas district in Madhya Pradesh on HAM Mode. L 49.00 Km
Fully Automated Coagulation Analyzer (V2) (Q2) (3 (3 ))
ESR Analyzer (V2) (Q2) (3 (3 ))
5 Part Automated Hematology Analyser (V2) (Q2) (3 (3 ))
Authority Engineer Services for Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode
Construction of De Scoped Length of Four Lane Bypass (NH 206) for Shivamogga City Project Length 4.74 Km from Km.209.76 to Km.214.5 (Design Chainage) under NH(O) on EPC Mode in the State of Karnataka
Independent Engineer Services for Development, Operation and Maintenance of the Ropeway Project from Kamakhya Railway Station to Kamakhya Temple on DBFOT Mode in the State of Assam.
Independent Engineer Services for Development of the Ropeway system from Govindghat to Hemkund Sahib Ji in the State of Uttarakhand on DBFOT Mode.
Independent Engineer Services for Development of the Ropeway system from Sonprayag to Kedarnath in the State of Uttarakhand on DBFOT Mode