Loading…
Loading…
3,855 results • Latest
relaying of existing CC block on Kaithal Guhla to Kharkara road at RD 6.75 to 7.25 in Kaithal Distt. (ID 6975) (ODR) (Guhla Constituency) (Work Programme 2026-27) UPGRADATION OF ROADS BY PROVIDING WIDENING AND STRENGTHENING OF SULTANIAN APP. ROAD TO
Coupler Body with Shank Wear Plate for Transition CBC. Drawing No :- SK - 62724 Alt. 31, Item No. 18 & 10.Spec. :- 56 - BD - 07 with Amend. No. 2. Guarantee :- For a period of 48 months from the date of supply or 36 months from the date of fitment, whichever is earlier. [ WarrantyPeriod: 48 Months after the date of delivery ]
(I) Raising of PF no. 1 from Rail Level to High Level and extension upto 600m alongwith provision of 3.0 m wide Foot Over Bridge to connect PF no. 1 & 2 at Shambhu station on UMB - LDH section.(II) Raising of existing Platform no. 2 to High level at Shambhu and provision of lifts 2 nos. at Shambhu and 3 nos at Sarai Banjara station and Provision of Tactile Guiding and Warning tiles at Platforms on Fatehgarh Sahib, Bassi Pathanam, Noganwan, New Morinda, Morinda, Kurali, Mianpur, Rupnagar, Ghanauli, Bharatgarh, Kiratpur Sahib, Nangal Dam, Raimehatpur, Una Himachal, Panoh, Churaru Takrala, Amb Andaura, Chintpurni Marg, Daulatpur Chowk, Ambala City, Rajpura, Sarai Banjara, Sirhind.
Control arm assembly right consisting of 02 items for LHB coaches as per pdf attached. [ Warranty Period: 30 Months after the date of delivery ]
Provision of Boundary Wall at Vulnerable locations prone to encroachment between Ghanauali - Bharatgarh stations under SSE/W/RPAR (W-Beam Fencing).
Miscellaneous work in connection with day to day maintenance of track under SSE/P.WAY/PTA & UKN.
Raising of Passenger Platform no. 1 from Medium Level to High level along with extension upto 600 Meter at Chawapail station on UMB - LDH section.
Raising of Passenger Platform no. 1 from Rail Level to High level along with extension upto 600 Meter at Sadhugarh station on UMB - LDH section.