Loading…
Loading…
1,977 results • Latest
C/o Link road Diggal to Jubar Diggal Datla km 0/00 to 0/830 (SH C/O Edge wall at Rd 0/200 to 0/240 and tow wall ,wing wall at Rd 0/200 and 0/330 ,Wire Crate in R/wall at Rd 0/430 to 0/445 and P/L G-II at Rd 0/00 to 0/300 ) Under DMFT/PMKKY)PMK/2025/
C/O Link road Thyoda Pul to Jubbar km 0/00to 4/500( SH C/O 900 mm HPC at Rd 0/150 ,B/wall at Rd 0/640 to 0/655,R/wall at Rd 1/325 to 11/345,V-Shape Drain at Rd 0/200 to 0/310,P/L Gr-III and interlocking Tile at Rd 0/150 to 0/250)(under DMFT/PMKKKY)
FC, Passing Places, R/Walls, Missing C.D. work, GSB, WBM-II, WBM-III, Tarring work, C.C. Pavement, Side Drain and Parapets, including 5-year routine Maintenance after completion of work. (UNDER NABARD RIDF-XXX)
C/O Link road Pandal to Jokhati Nerli Baayi Ram Nath Kaushal House to Dev Raja Mandir km 0/00 to 0/800 (SH C/o V-Shape drain 0/000 to 0//100,C/O R/wall at 0/450 to 0/470, P/L G-I ,G-II and Interlocking Tile at Rd 0/050 to 0/100)(under DMFT/PMKKY)PMK/
C/o Link Road Bhalsi km 0/00 to 2/00 (SH C/O NP2 Pipe 600 MM dia HPC at Rd 0/980,V Shape Drain at Rd 1/00 to 1/300 R/Wall Rd 1/410 to 1/420 and G-I,G-II at rd 0/700 to 0/800 and 1/00 to 1/400,interlocking Tile 1/100 to 1/200)(under DMFT/PMKKKY)PMK/20
A/R and M/O on various roas under Sub Division Nalagarh HPPWD Nalagarh (SH Supply and Stacking Stone Aggregate 13.2 mm to 5.6 mm to 22.4 mm at site