Loading
Loading…
Loading…
1,987 results • Latest
Operation and Comprehensive Maintenance of VTL Machine 19 & 20 through outside agency for machining of BGC, BLC, EMU & BOXN wheel for 3 years at RWP Bela as per scope of work.
C/O PCC B/Wall at RD 0/450 to 0/465 and R/Wall at RD 1/471 to 1/483
C/O Wire crate at RD 86/720 to 86/730,86/810 to 86/820 and97/485 to 97/505).
C/O Toe wall with both side wing wall protection for slab culvert at RD 0/245 and Cause way toe wall protection at RD 0/090)