Loading…
Loading…
1,774 results • Latest
Construction of 66kV Double Circuit Transmission Line to Proposed 66kV Substation at Dhana (Baghbania) under ES Division Nalagarh
Vacuum Packed Welding Electrode E-410 NiMo-16, Vacuum Packed Cutting Electrode, MIG Wire 410 Ni Mo
Ratchet Lever(NLCIL) (Q3), Hand - Operated Chain Pulley Block (V2) as per IS 3832 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
COVER ASSY CLUTCH, DISC CLUTCH, DEAREACTION TANK, DOOR GLASS FRT LH, AIR FILTER ASSY, DOOR PUDDLE LAMP, ASSY COLLANT PIPE TO OIL, CLUTCH MASTER CYL, ASSY SEALING MOULD LH, ASSY SEALING MOUDL RH
Eye Bolts with Collars - IS 4190 (Q3), Nylon Rope as per IS 4572 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
DEAREATION TANK, SILENCER ASSY, COVER ASSY, FLY WHEEL, TRIM DOOR LH, TRIM DOOR RH, STEERING GEAR BOX ASSY, ASSY SEALING MOULD LH, ASSY SEALING MOULD RH, TAIL LIGHT ASSY
CONSUMABLES AND ACCESSORIES OF ZEBRA 9 SERIES
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - HYDRO ELECTRIC POWER HOUSE; REPAIR OF GUIDE VANES AND BUSH HOUSINGS FOR165 MW DEHAR MACHINES AT DPH SLAPPER; AS PER SCOPE OF WORK
GlobalTenderCategory (Q3) Global Tender Title LIQUID CHROMATOGRAPHY TANDEM MASS SPECTROMETRY LCMS MS (3 (3 ))
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Aluminium Paint for General Purposes in Dual Container as per IS 2339 (Q3), Ready Mixed Paint, Air Drying, Red Oxide - Zinc Phosphate, Priming as per IS 12744 (Q3), GUM SPIRIT OF TURPENTINE (OIL OF TURPENTINE) conforming to IS 533 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No