Loading…
Loading…
1,776 results • Latest
Development, Operations and Maintenance of Passenger Ropeway and allied services from Bankhandi Rest House to Mata Bankhandi Temple in Una District on Design, Build, Finance, Operate and Transfer (DBFOT) Mode
52kV, 3150A RIP Bushing with metal parts and Gaskets as per POWERGRID TS for NER, 52kV 3150 A RIP or RIS Bushing solid Stem with Metal Parts and Gasket for NR-III, 52 KV 3150 A LV RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-I, 52 KV 3150 A RIP or RIS bushing Solid stem With Metal Parts And Gaskets for NR-I Grp-II, 52kV 3150A, RIP or RIS Bushing Solid stem With Metal Parts And Gaskets for NR-II, 3150 Amps RIP or RIS bushing Solid stem type with metal part and gasket for Odisha, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for WR-I, 52kV 3150A Solid stem type RIP or RIS Bushing with Metal Parts and Gasket for ER-I
Widening and upgradation of Sirmour (Keoti) to Kalwari section of NH-135BD from Ch 10/070 to 35/920 (length 25.85 km) to 2-Lane with paved shoulder configuration in the State of Madhya Pradesh
Development, Operations and Maintenance of Passenger Ropeway from Parwanoo to Shimla on Design, Build, Finance, Operate and Transfer (DBFOT) Mode 2nd Call
Development,operation and maintenence of passenger ropeway from narkanda to hatu peak, distt. shimla on design,build,finance,operate and transfer (DBFOT)mode
UPGRADATION OF DG SET PLCs AT POWERHOUSE